In the 3-GeV rapid cycling synchrotron of Japan Proton Accelerator Research Complex, we have clearly measured a continuous degradation of a stripper foil during more than 6 months operation with a beam power of 300 kW. A hybrid-type boron doped carbon stripper foil of 200 μg/cm2 was used for 181 MeV H stripping injection. In order to know an absolute change of the foil thickness as well as information on the pinhole formation, we precisely measured an absolute change of the partially-stripped H0 and the un-stripped H waste beams. Two absolutely independent monitor systems were used and the results were found to be very consistent with each other. The foil thickness at the injected beam spot was measured to be gradually thickening and it was more than 10 % thicker at the end compared to the initial thickness, where the measurement accuracy was obtained to be better than 2 %. The missing un-stripped H were also measured to be gradually increasing due to foil deformation and curling but there was however no clear indication of foil thinning or pinhole formation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

Similar content being viewed by others

References

  1. Accelerator Technical Design Report for High Intensity Proton Accelerator Facility Project, High-intensity Proton Accelerator Project Team (2003) JAERI Technical Report 2003–2044 and KEK Report 2002–2013

  2. Hotchi H (2014) Proceedings of international particle accelerator conference, IPAC2014, pp 899–903

  3. Sugai I, Takeda Y, Oyaizu M, Kawakami H, Irie Y, Arakida Y, Hara K, Hattori H, Kawasaki K, Kamiya J, Kinsho M (2006) Nucl Instrum Methods A 561:16–23

    Article  CAS  Google Scholar 

  4. Saha PK, Yoshimoto M, Yamazaki Y, Hotchi H, Harada H, Hayashi N, Yamamoto K, Kinsho M, Irie Y (2014) J Radioanal Nucl Chem 299:1041–1046

    Article  CAS  Google Scholar 

  5. Saha PK, Hatakeyama S, Yamamoto K, Yoshimoto M, Harada H, Hotchi H, Shobuda Y, Kinsho M, Satou Y, Irie Y (2011) Phys Rev ST Accel Beams 14:072801

    Article  Google Scholar 

  6. Saha PK, Yoshimoto M, Yamazaki Y, Hotchi H, Harada H, Kinsho M, Irie Y (2014) Nucl Instrum Methods A 776:87–93

    Article  Google Scholar 

  7. Spickermann T, Borden MJ, Macek RJ, Sugai I, Feigerle CS, Shaw RW, Jaggi V, Zeisler SK (2008) Proceedings of the 42nd ICFA Advanced beam dynamic workshop on high-intensity high-brightness hadron beams, HB2008, pp 262–264

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to P. K. Saha.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Saha, P.K., Yoshimoto, M., Hotchi, H. et al. Measurement of continuous degradation of a stripper foil during ths operation with 300 kW beam power in the 3-GeV RCS of J-PARC. J Radioanal Nucl Chem 305, 851–857 (2015). https://doi.org/10.1007/s10967-015-4023-7

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10967-015-4023-7

Keywords

Navigation