Abstract
In this paper, a description of the control system’s software and hardware architecture for the Experimental Advanced Superconducting Tokamak neutral beam injector (NBI) is introduced. The chosen platform is a CPCI-based and PXI-based computerized network system. Three PXI/CPCI crates house several boards for performing analogue signal acquisition, analogue voltage generation, signal conditioning, digital input detection and digital output generation. Two server computers running CentOS 6.3 operating system act as control server and data server respectively. A virtual instrument for the timing system is developed with LabVIEW 2010 on the PXI-based platform. Graphical user interfaces for monitoring and programming purposes are developed with LabVIEW and WinCC integrated development environments by using TCP/IP network protocol under the Windows operating system. Experimental results demonstrate that the visualization and automation of NBI experimental operations are successfully implemented by using the functions of remote monitoring, interlock protection, and data processing.
Similar content being viewed by others
References
Y. Wan, J. Li, P. Weng, First engineering commissioning of EAST tokamak. Plasma Sci. Technol. 8, 253–254 (2006)
L. Hu, X. Zhang, R. Yao, EAST neutral beam injection project for EAST Tokamak. Nucl. Tech. 20, 149–152 (2006)
C. Hu, Y. Xie, NBI Team, Development of megawatt level high current ion source. Plasma Sci. Technol. 14, 75–77 (2012)
P. Sheng, C. Hu, et al., Control framework of neutral beam injection system for EAST. In 9th Asia-Pacific Conference on Plasma Science and Technology (Huangshan, China, 2008)
Y. Wu, J. Luo, Z. Ji et al., Development of the central timing system on the EAST Tokamak. Nucl. Tech. 30, 789–792 (2007)
D. Wu, C. Hu, P. Sheng et al., Design of main control consol software in EAST neutral beam injector’s control system for the first beam line. J Fusion Energ. 32, 317–418 (2013)
S. Song, P. Sheng et al., Programmable logic controller system in neutral beam injector’s ion source test stand. High Power Laser Particle Beams 23, 1635–1639 (2011)
Acknowledgments
This work is supported by Projects of International Thermonuclear Experimental Reactor (No. 2013GB101000).
Author information
Authors and Affiliations
Consortia
Corresponding author
Rights and permissions
About this article
Cite this article
Sheng, P., Hu, C., Song, S. et al. The NBI Control System for the EAST. J Fusion Energ 33, 529–534 (2014). https://doi.org/10.1007/s10894-014-9700-y
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10894-014-9700-y