Skip to main content
Log in

The NBI Control System for the EAST

  • Original Research
  • Published:
Journal of Fusion Energy Aims and scope Submit manuscript

Abstract

In this paper, a description of the control system’s software and hardware architecture for the Experimental Advanced Superconducting Tokamak neutral beam injector (NBI) is introduced. The chosen platform is a CPCI-based and PXI-based computerized network system. Three PXI/CPCI crates house several boards for performing analogue signal acquisition, analogue voltage generation, signal conditioning, digital input detection and digital output generation. Two server computers running CentOS 6.3 operating system act as control server and data server respectively. A virtual instrument for the timing system is developed with LabVIEW 2010 on the PXI-based platform. Graphical user interfaces for monitoring and programming purposes are developed with LabVIEW and WinCC integrated development environments by using TCP/IP network protocol under the Windows operating system. Experimental results demonstrate that the visualization and automation of NBI experimental operations are successfully implemented by using the functions of remote monitoring, interlock protection, and data processing.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5

Similar content being viewed by others

References

  1. Y. Wan, J. Li, P. Weng, First engineering commissioning of EAST tokamak. Plasma Sci. Technol. 8, 253–254 (2006)

    Article  ADS  Google Scholar 

  2. L. Hu, X. Zhang, R. Yao, EAST neutral beam injection project for EAST Tokamak. Nucl. Tech. 20, 149–152 (2006)

    Google Scholar 

  3. C. Hu, Y. Xie, NBI Team, Development of megawatt level high current ion source. Plasma Sci. Technol. 14, 75–77 (2012)

    Article  ADS  Google Scholar 

  4. P. Sheng, C. Hu, et al., Control framework of neutral beam injection system for EAST. In 9th Asia-Pacific Conference on Plasma Science and Technology (Huangshan, China, 2008)

  5. Y. Wu, J. Luo, Z. Ji et al., Development of the central timing system on the EAST Tokamak. Nucl. Tech. 30, 789–792 (2007)

    Google Scholar 

  6. D. Wu, C. Hu, P. Sheng et al., Design of main control consol software in EAST neutral beam injector’s control system for the first beam line. J Fusion Energ. 32, 317–418 (2013)

    Article  Google Scholar 

  7. S. Song, P. Sheng et al., Programmable logic controller system in neutral beam injector’s ion source test stand. High Power Laser Particle Beams 23, 1635–1639 (2011)

    Article  Google Scholar 

Download references

Acknowledgments

This work is supported by Projects of International Thermonuclear Experimental Reactor (No. 2013GB101000).

Author information

Authors and Affiliations

Authors

Consortia

Corresponding author

Correspondence to Peng Sheng.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Sheng, P., Hu, C., Song, S. et al. The NBI Control System for the EAST. J Fusion Energ 33, 529–534 (2014). https://doi.org/10.1007/s10894-014-9700-y

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10894-014-9700-y

Keywords

Navigation