Skip to main content
Log in

Simultaneous Effects of Joint Spacing and Orientation on TBM Cutting Efficiency in Jointed Rock Masses

  • Technical Note
  • Published:
Rock Mechanics and Rock Engineering Aims and scope Submit manuscript

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11

References

  • Ataei M, Bejari H, Khalokakaie R, Khademi Hamidi J (2008) Effect of joint orientation on rock breakage mechanism by disc cutters. In: Proceedings of the 26th Symposium on Geosciences, Tehran, Iran, February 2008, pp 121–130

  • Barton N (2000) TBM tunneling in jointed and faulted rock. Balkema, Rotterdam

    Google Scholar 

  • Bejari H (2008) TBM performance prediction in Alborz tunnel and comparison with exiting condition. MSc thesis, Shahrood University of Technology, Shahrood, Iran

  • Bejari H, Khademi Hamidi J (2009) Simultaneous effects of joint spacing and orientation on the penetration rate of TBM using numerical modeling. In: Proceedings of the International Society for Rock Mechanics (ISRM) International Symposium on Rock Mechanics, SINOROCK 2009, Hong Kong, May 2009

  • Bejari H, Kakaie R, Ataei M, Khademi Hamidi J (2011) Simultaneous effects of joint spacing and joint orientation on the penetration rate of a single disc cutter. Mining Sci Technol (China) 21(4):507–512

    Article  Google Scholar 

  • Bruland A (1998) Hard rock tunnel boring. Doctoral thesis, Norwegian University of Science and Technology, Trondheim, Norway

  • Farrokh E, Rostami J, Laughton C (2012) Study of various models for estimation of penetration rate of hard rock TBMs. Tunn Undergr Space Technol 30:110–123

    Article  Google Scholar 

  • Gong QM, Zhao J, Jiao YY (2005) Numerical modeling of the effects of joint orientation on rock fragmentation by TBM cutters. Tunn Undergr Space Technol 20(2):183–191

    Article  Google Scholar 

  • Gong QM, Jiao YY, Zhao J (2006) Numerical modelling of the effects of joint spacing on rock fragmentation by TBM cutters. Tunn Undergr Space Technol 21(1):46–55

    Article  Google Scholar 

  • Hassanpour J, Rostami J, Khamehchiyan M, Bruland A, Tavakoli HR (2010) TBM performance analysis in pyroclastic rocks: a case history of Karaj water conveyance tunnel. Rock Mech Rock Eng 43(4):427–445

    Article  Google Scholar 

  • Hassanpour J, Rostami J, Zhao J (2011) A new hard rock TBM performance prediction model for project planning. Tunn Undergr Space Technol 26(5):595–603

    Article  Google Scholar 

  • Howarth DF (1981) The effect of jointed and fissured rock on the performance of tunnel boring machines. In: Proceedings of the International Symposium on Weak Rock, Tokyo, Japan, September 1981, pp 1069–1074

  • Innaurato N, Oggeri C, Oreste PP (2001) Performance and modeling of indenters and cutting tools for the assessment of the borability in rock tunneling. In: Särkkä P, Eloranta P (eds) Proceedings of the EUROCK 2001 Symposium, Rock Mechanics: a Challenge for Society, Helsinki, Finland, June 2001, pp 573–578

  • Innaurato N, Oggeri C, Oreste PP, Vinai R (2007) Experimental and numerical studies on rock breaking with TBM tools under high stress confinement. Rock Mech Rock Eng 40(5):429–451

    Article  Google Scholar 

  • Innaurato N, Oggeri C, Oreste PP, Vinai R (2011) Laboratory tests to study the influence of rock stress confinement on the performances of TBM discs in tunnels. Int J Min Met Mater 18(3):253–259

    Article  Google Scholar 

  • Itasca Consulting Group (1996) UDEC reference manual, Version 3.0. Itasca Consulting Group, Inc., Minneapolis, Minnesota, USA

  • Khademi Hamidi J, Shahriar K, Rezai B, Rostami J (2010) Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system. Tunn Undergr Space Technol 25(4):333–345

    Article  Google Scholar 

  • Kou SQ, Lindqvist P-A, Tang CA, Xu XH (1999) Numerical simulation of the cutting of inhomogeneous rocks. Int J Rock Mech Min Sci 36(5):711–717

    Article  Google Scholar 

  • Lindqvist P-A, Lai H-H (1983) Behaviour of the crushed zone in rock indentation. Rock Mech Rock Eng 16:199–207

    Article  Google Scholar 

  • Liu HY, Kou SQ, Lindqvist P-A, Tang CA (2002) Numerical simulation of the rock fragmentation process induced by indenters. Int J Rock Mech Min Sci 39:491–505

    Article  Google Scholar 

  • Ramezanzadeh A (2005) Performance analysis and development of new models for performance prediction of hard rock TBMs in rock mass. PhD thesis, Institut National des Sciences Appliquées (INSA), Lyon, France, 333 pp

  • Ramezanzadeh A, Rostami J, Tadic D (2008) Impact of rock mass characteristics on hard rock TBM performance. In: Proceedings of the 13th Australian Tunnelling Conference, Melbourne, Australia, May 2008

  • Ribacchi R, Lembo Fazio A (2005) Influence of rock mass parameters on the performance of a TBM in a gneissic formation (Varzo Tunnel). Rock Mech Rock Eng 38(2):105–127

    Article  Google Scholar 

  • Sanio HP (1985) Prediction of the performance of disc cutters in anisotropic rock. Int J Rock Mech Min Sci Geomech Abstr 22(3):153–161

    Article  Google Scholar 

  • Sundaram NM, Rafek AG (1998) The influence of rock mass properties in the assessment of TBM performance. In: Proceedings of the 8th IAEG Congress, Vancouver, British Columbia, Canada, September 1998, pp 3553–3559

  • Tang CA (1997) Numerical simulation of progressive rock failure and associated seismicity. Int J Rock Mech Min Sci 34:249–261

    Article  Google Scholar 

  • Technical Office Tehran–Shomal Highway (2009) Technical report

  • Wanner H, Aeberli U (1979) Tunnelling machine performance in jointed rock. In: Proceedings of 4th Congress of the International Society for Rock Mechanics, Montreux, Switzerland, September 1979, vol 1, pp 573–580

  • Yagiz S (2002) Development of rock fracture and brittleness indices to quantify the effects of rock mass features and toughness in the CSM model basic penetration for hard rock tunneling machines. PhD thesis, Department of Mining and Earth Systems Engineering, Colorado School of Mines, Golden, Colorado, USA, p 289

  • Yagiz S (2008) Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn Undergr Space Technol 23(3):326–339

    Article  Google Scholar 

  • Zhao XL, Roegiers JC, Passaris EKS (1994) Indentation fracture mechanics and rock disc cutting. In: Proceedings of the 1st North American Rock Mechanics Symposium, Austin, Texas, USA, May 1994, pp 327–334

  • Zhao Z, Gong QM, Zhang Y, Zhao J (2007) Prediction model of tunnel boring machine performance by ensemble neural networks. Geomech Geoeng Int J 2(2):123–128

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hadi Bejari.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bejari, H., Khademi Hamidi, J. Simultaneous Effects of Joint Spacing and Orientation on TBM Cutting Efficiency in Jointed Rock Masses. Rock Mech Rock Eng 46, 897–907 (2013). https://doi.org/10.1007/s00603-012-0314-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00603-012-0314-2

Keywords

Navigation