A Top Pilot Tunnel Preconditioning Method for the Prevention of Extremely Intense Rockbursts in Deep Tunnels Excavated by TBMs

  • Original Paper
  • Published:
Rock Mechanics and Rock Engineering Aims and scope Submit manuscript

Abstract

The headrace tunnels at the Jinping II Hydropower Station cross the Jinping Mountain with a maximum overburden depth of 2,525 m, where 80% of the strata along the tunnels consist of marble. A number of extremely intense rockbursts occurred during the excavation of the auxiliary tunnels and the drainage tunnel. In particular, a tunnel boring machine (TBM) was destroyed by an extremely intense rockburst in a 7.2-m-diameter drainage tunnel. Two of the four subsequent 12.4-m-diameter headrace tunnels will be excavated with larger size TBMs, where a high risk of extremely intense rockbursts exists. Herein, a top pilot tunnel preconditioning method is proposed to minimize this risk, in which a drilling and blasting method is first recommended for the top pilot tunnel excavation and support, and then the TBM excavation of the main tunnel is conducted. In order to evaluate the mechanical effectiveness of this method, numerical simulation analyses using the failure approaching index, energy release rate, and excess shear stress indices are carried out. Its construction feasibility is discussed as well. Moreover, a microseismic monitoring technique is used in the experimental tunnel section for the real-time monitoring of the microseismic activities of the rock mass in TBM excavation and for assessing the effect of the top pilot tunnel excavation in reducing the risk of rockbursts. This method is applied to two tunnel sections prone to extremely intense rockbursts and leads to a reduction in the risk of rockbursts in TBM excavation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
Fig. 17
Fig. 18
Fig. 19
Fig. 20
Fig. 21
Fig. 22
Fig. 23
Fig. 24
Fig. 25
Fig. 26
Fig. 27
Fig. 28
Fig. 29

Similar content being viewed by others

References

  • Board MP (1994) Numerical examination of mining-induced seismicity. PhD thesis, University of Minnesota, Minneapolis, MN, USA

  • Brady BHG, Brown ET (2006) Rock mechanics for underground mining, 3rd edn. Springer, Dordrecht, The Netherlands

    Google Scholar 

  • Broch E, Sørheim S (1984) Experiences from the planning, construction and supporting of a road tunnel subjected to heavy rockbursting. Rock Mech Rock Eng 17:15–35

    Article  Google Scholar 

  • Brown ET (1984) Rockbursts: prediction and control. Tunnels Tunnell 84:17–19

    Google Scholar 

  • Canadian Rockburst Research Program (CRRP) (1996) A comprehensive summary of five years of collaborative research on rockbursting in hard rock mines. CAMIRO Mining Division, CRRP

  • Cook NGW, Hoek E, Pretorius JPG, Ortlepp WD, Salamon MDG (1966) Rock mechanics applied to the study of rockbursts. J S Afr Inst Min Metall 66:435–528

    Google Scholar 

  • Goodman RE (1980) Introduction to rock mechanics. Wiley, New York

    Google Scholar 

  • Hajiabdolmajid V, Kaiser PK, Martin CD (2002) Modelling brittle failure of rock. Int J Rock Mech Min Sci 39:731–741

    Article  Google Scholar 

  • Hoek E, Kaiser PK, Bawden WF (1997) Support of underground excavations in hard rock. Taylor & Francis, New York

    Google Scholar 

  • Li T, Cai MF, Cai M (2007) A review of mining-induced seismicity in China. Int J Rock Mech Min Sci 44:1149–1171

    Article  Google Scholar 

  • Martin CD (1993) The strength of massive Lac du Bonnet granite around underground openings. PhD thesis, University of Manitoba, Canada

  • Martin CD (1997) Seventeenth Canadian Geotechnical Colloquium: the effect of cohesion loss and stress path on brittle rock strength. Can Geotech J 34:698–725

    Google Scholar 

  • McCreath DR, Kaiser PK (1992) Evaluation of current support practices in burst-prone ground and preliminary guidelines for Canadian hardrock mines. In: Kaiser PK, McCreath DR (eds) Rock support in mining and underground construction. Balkema, Rotterdam, The Netherlands, pp 611–619

    Google Scholar 

  • Ortlepp WD (2001) The behaviour of tunnels at great depth under large static and dynamic pressures. Tunn Undergr Space Technol 16:41–48

    Article  Google Scholar 

  • Ortlepp WD, Stacey TR (1994) Rockburst mechanisms in tunnels and shafts. Tunn Undergr Space Technol 9:59–65

    Article  Google Scholar 

  • Read RS (2004) 20 years of excavation response studies at AECL’s Underground Research Laboratory. Int J Rock Mech Min Sci 41:1251–1275

    Article  Google Scholar 

  • Rojat F, Labiouse V, Kaiser PK, Descoeudres F (2009) Brittle rock failure in the Steg lateral adit of the Lötschberg base tunnel. Rock Mech Rock Eng 42:341–359

    Article  Google Scholar 

  • Roux AJA, Leeman ER, Denkhaus HG (1957) Destressing: a means of ameliorating rockburst conditions. Part I: the concept of destressing and the results obtained from its applications. J S Afr Inst Min Metall 57:101–119

    Google Scholar 

  • Ryder JA (1988) Excess shear stress in the assessment of geologically hazardous situations. J S Afr Inst Min Metall 88:27–39

    Google Scholar 

  • Salamon MGD (1983) Rockburst hazard and the fight for its alleviation in South African gold mines. In: Rockbursts: prediction and control. IMM, London, pp 11–36

  • Salamon MGD (1984) Energy considerations in rock mechanics: fundamental results. J S Afr Inst Min Metall 84:233–246

    Google Scholar 

  • Shan Z, Yan P (2010) Management of rock bursts during excavation of the deep tunnels in Jinping II Hydropower Station. Bull Eng Geol Environ 69:353–363

    Article  Google Scholar 

  • Shi HG (1995) Study of rockbursts in the left-bank headrace tunnels in Ertan Hydropower Station. Des Hydropower Station 11:35–40 (in Chinese)

    Google Scholar 

  • Singh SP (1988) Burst energy release index. Rock Mech Rock Eng 21:149–155

    Article  Google Scholar 

  • Stacey TR, Ortlepp WD, Kirsten HAD (1995) Energy-absorbing capacity of reinforced shotcrete, with reference to the containment of rockburst damage. J S Afr Inst Min Metall 95:137–140

    Google Scholar 

  • Tang BY (2000) Rockburst control using distress blasting. PhD thesis, McGill University, Montreal, Canada

  • Toper AZ, Kabongo KK, Stewart RD, Daehnke A (2000) The mechanism, optimization and effects of preconditioning. J S Afr Inst Min Metall 100:7–16

    Google Scholar 

  • Wu S, Shen M, Wang J (2010) Jinping hydropower project: main technical issues on engineering geology and rock mechanics. Bull Eng Geol Environ 69:325–332

    Article  Google Scholar 

  • Xiao YX, Feng XT, Chen BR, Feng GL, Zhang ZT, Ming HJ (2011) Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel. Rock Soil Mech 32:3111–3118 (in Chinese)

    Google Scholar 

  • Zhang CQ, Zhou H, Feng XT (2011a) An index for estimating the stability of brittle surrounding rock mass: FAI and its engineering application. Rock Mech Rock Eng 44:401–414

    Article  Google Scholar 

  • Zhang C, Zhou H, Feng X, Xing L, Qiu S (2011b) Layered fractures induced by principal stress axes rotation in hard rock during tunnelling. Mater Res Innov 15:S527–S530

    Article  Google Scholar 

  • Zhou JF (2011) Study on rockburst mechanism, prediction and prevention of deep buried-long-large tunnels in Jinping II Hydropower Station. PhD thesis, Wuhan University, China (in Chinese)

Download references

Acknowledgments

The authors gratefully acknowledge the financial support from the National Science Foundation of China under Grant Nos. 2010CB732006, 51079144, and 50979104, and the National Science Foundation of Hubei Prince in China under Grant No. 2010CDB10404. The work in this paper was also supported by research funding from the Ertan Hydropower Development Company, Ltd., and an important pilot tunnel project (for youth talent) of the knowledge innovation project of the Chinese Academy of Sciences (CAS) (No. KZCX2-EW-QN115). We are also grateful for the support and assistance of the engineers at the East China Investigation and Design Institute with the headrace tunnel design and construction. Special thanks go to Prof. Giovanni Barla and the two anonymous reviewers for their constructive comments.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Chuanqing Zhang.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zhang, C., Feng, X., Zhou, H. et al. A Top Pilot Tunnel Preconditioning Method for the Prevention of Extremely Intense Rockbursts in Deep Tunnels Excavated by TBMs. Rock Mech Rock Eng 45, 289–309 (2012). https://doi.org/10.1007/s00603-011-0199-5

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00603-011-0199-5

Keywords

Navigation