Abstract.
The influence of the estimation of parameters in Shewhart control charts is investigated. It is shown by simulation and asymptotics that (very) large sample sizes are needed to accurately determine control charts if estimators are plugged in. Correction terms are developed to get accurate control limits for common sample sizes in the in-control situation. Simulation and theory show that the new corrections work very well. The performance of the corrected control charts in the out-of-control situation is studied as well. It turns out that the correction terms do not disturb the behavior of the control charts in the out-of-control situation. On the contrary, for moderate sample sizes the corrected control charts remain powerful and therefore, the recommendation to take at least 300 observations can be reduced to 40 observations when corrected control charts are applied.
Similar content being viewed by others
Author information
Authors and Affiliations
Additional information
Acknowledgements. The authors would like to thank Sri Nurdiati for doing the Monte Carlo studies.
Rights and permissions
About this article
Cite this article
Albers, W., Kallenberg, W. Estimation in Shewhart control charts: effects and corrections. Metrika 59, 207–234 (2004). https://doi.org/10.1007/s001840300280
Issue Date:
DOI: https://doi.org/10.1007/s001840300280