Skip to main content
Log in

Pile placement in permafrost with the use of jet-flame drilling (from the experience of construction in the northern Tyumen' region)

  • From The Experience Of Construction Organizations
  • Published:
Soil Mechanics and Foundation Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. G. V. Porkhaev, Yu. O. Targulyan, and A. A. Kolesov, "Pile placement in permafrost with driving the holes by the steam-vibratory pilot hole method," Osn., Fundam. Mekh. Gruntov, No. 3, 12–14 (1977).

  2. E. K. Yastrebov, B. F. Sherstyuk, and B. K. Styron, "Equipment and technology of jet-flame drilling in frozen ground and rocks," Kolyma, No. 5–6, 28–32 (1982).

  3. B. F. Sherstyuk, E. K. Yasterbov, B. K. Styron, V. G. Udovenko, M. N. Sukholutskii, and V. A. Burdin, "Jet-flame drilling of holes when constructing supports in frozen ground," Stroit. Truboprovodov, No. 10, 31–34 (1984).

  4. L. I. Garanin, "Bearing capapcity of open-end pipe piles in permafrost," Stroit. Truboprovodov, No. 2, 37–38 (1985).

Download references

Authors

Additional information

Kazakh Polytechnic Institute. Scientific-Research Institute of Bases and Underground Structures. Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 3, pp. 8–10, May–June, 1986.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Sherstyuk, B.F., Yastrebov, E.K., Styron, B.K. et al. Pile placement in permafrost with the use of jet-flame drilling (from the experience of construction in the northern Tyumen' region). Soil Mech Found Eng 23, 79–84 (1986). https://doi.org/10.1007/BF01717837

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01717837

Keywords

Navigation