Literature cited
G. V. Porkhaev, Yu. O. Targulyan, and A. A. Kolesov, "Pile placement in permafrost with driving the holes by the steam-vibratory pilot hole method," Osn., Fundam. Mekh. Gruntov, No. 3, 12–14 (1977).
E. K. Yastrebov, B. F. Sherstyuk, and B. K. Styron, "Equipment and technology of jet-flame drilling in frozen ground and rocks," Kolyma, No. 5–6, 28–32 (1982).
B. F. Sherstyuk, E. K. Yasterbov, B. K. Styron, V. G. Udovenko, M. N. Sukholutskii, and V. A. Burdin, "Jet-flame drilling of holes when constructing supports in frozen ground," Stroit. Truboprovodov, No. 10, 31–34 (1984).
L. I. Garanin, "Bearing capapcity of open-end pipe piles in permafrost," Stroit. Truboprovodov, No. 2, 37–38 (1985).
Additional information
Kazakh Polytechnic Institute. Scientific-Research Institute of Bases and Underground Structures. Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 3, pp. 8–10, May–June, 1986.
Rights and permissions
About this article
Cite this article
Sherstyuk, B.F., Yastrebov, E.K., Styron, B.K. et al. Pile placement in permafrost with the use of jet-flame drilling (from the experience of construction in the northern Tyumen' region). Soil Mech Found Eng 23, 79–84 (1986). https://doi.org/10.1007/BF01717837
Issue Date:
DOI: https://doi.org/10.1007/BF01717837