1 Erratum to: Comput Econ DOI 10.1007/s10614-016-9633-9
In the original publication of this article, Eq. 8 is published incorrectly. The correct equation is provided in this erratum (Eq. 8).
$$\begin{aligned} \bar{{u}}\equiv \left[ {{\begin{array}{c} {\bar{{k}}} \\ {\bar{{c}}} \\ \end{array} }} \right] =\left[ {{\begin{array}{c} {\left( {\frac{\alpha A_\tau }{\delta _\tau +\,\rho e^{\rho \tau }}} \right) ^{1/(1-\alpha )}} \\ {A_\tau \bar{{k}}^{\alpha }-\delta _\tau \bar{{k}}} \\ \end{array} }} \right] \end{aligned}$$
(8)
Author information
Authors and Affiliations
Corresponding author
Additional information
The online version of the original article can be found under doi:10.1007/s10614-016-9633-9.
Rights and permissions
About this article
Cite this article
Lin, H.C. Erratum to: Computing Transitional Cycles for a Deterministic Time-to-Build Growth Model. Comput Econ 51, 697 (2018). https://doi.org/10.1007/s10614-017-9710-8
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10614-017-9710-8