A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing

  • Big Data Analytics in Operations & Supply Chain Management
  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

This paper presents a prototype system of sheet metal processing machinery which collects production order data, passes current information to cloud based centralized job scheduling for setup time reduction and updates the production calendar accordingly. A centralized cloud service can collect and analyse production order data for machines and suggest optimized schedules. This paper explores the application of sequencing algorithms in the sheet metal forming industry, which faces sequence-dependent changeover times on single machine systems. We analyse the effectiveness of using such algorithms in the reduction of total setup times. We describe alternative models: Clustering, Nearest Neighbourhood and Travelling Salesman Problem, and then apply them to real data obtained from a manufacturing company, as well as to randomly generated data sets. Based on the prototype implementation clustering algorithm was proposed for actual implementation. Sequence-dependency increases the complexity of the scheduling problems; thus, effective approaches are required to solve them. The algorithms proposed in this paper provide efficient solutions to these types of sequencing problems.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7

Similar content being viewed by others

References

  • Adriaans, P., & Zantinge, D. (1996). Data mining. Harlow. England: Addison-Wesley.

    Google Scholar 

  • Bowers, M. R., Groom, K., Ng, W. M., & Zhang, G. (1995). Cluster analysis to minimize sequence dependent changeover times. Mathematical and Computer Modelling, 21(11), 89–95.

    Article  Google Scholar 

  • Burtseva, L., Parra, R. R., & Yaurima, V. (2010). Scheduling methods for hybrid flow shops with setup times. Rijeka: INTECH Open Access Publisher.

    Book  Google Scholar 

  • Cheung, W., & Zhou, H. (2001). Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times. Annals of Operations Research, 107(1–4), 65–81.

    Article  Google Scholar 

  • Dubey, R., Gunasekaran, A., Childe, S. J., Wamba, S. F., & Papadopoulos, T. (2016). The impact of big data on world-class sustainable manufacturing. The International Journal of Advanced Manufacturing Technology, 84(1–4), 631–645.

    Article  Google Scholar 

  • Gawroński, T. (2012). Optimization of setup times in the furniture industry. Annals of Operations Research, 201(1), 169–182.

    Article  Google Scholar 

  • Giglio, D. (2015). Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times. Journal of Scheduling, 18(5), 525–543.

    Article  Google Scholar 

  • Gupta, Sushil K. (1982). N jobs and m machines job-shop problems with sequence-dependent set-up times. The International Journal of Production Research, 20(5), 643–656.

    Article  Google Scholar 

  • Hwang, H., & Sun, J. U. (1998). Production sequencing problem with re-entrant work flows and sequence dependent setup times. International Journal of Production Research, 36(9), 2435–2450.

    Article  Google Scholar 

  • Kalayci, C. B., Polat, O., & Gupta, S. M. (2014). A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem. Annals of Operations Research, 1–34.

  • Lee, J., Kao, H. A., & Yang, S. (2014). Service innovation and smart analytics for industry 4.0 and big data environment. Procedia CIRP, 16, 3–8.

    Article  Google Scholar 

  • Lee, J., Lapira, E., Bagheri, B., & Kao, H. A. (2013). Recent advances and trends in predictive manufacturing systems in big data environment. Manufacturing Letters, 1(1), 38–41.

    Article  Google Scholar 

  • Liu, Z., Wang, Y., Cai, L., Cheng, Q., & Zhang, H. (2016). Design and manufacturing model of customized hydrostatic bearing system based on cloud and big data technology. The International Journal of Advanced Manufacturing Technology, 84(1–4), 261–273.

    Article  Google Scholar 

  • Lockett, A. G., & Muhlemann, A. P. (1972). Technical note–a scheduling problem involving sequence dependent changeover times. Operations Research, 20(4), 895–902.

    Article  Google Scholar 

  • McAfee, A., Brynjolfsson, E., Davenport, T. H., Patil, D. J., & Barton, D. (2012). Big data. The Management Revolution. Harvard Business Review, 90(10), 61–67.

    Google Scholar 

  • Mirabi, M. (2011). Ant colony optimization technique for the sequence-dependent flowshop scheduling problem. The International Journal of Advanced Manufacturing Technology, 55(1–4), 317–326.

    Article  Google Scholar 

  • Nonaka, Y., Erdős, G., Tamás, K., Nakano, T., & Váncza, J. (2012). Scheduling with alternative routings in CNC workshops. CIRP Annals-Manufacturing Technology, 61(1), 449–454.

    Article  Google Scholar 

  • Papadimitriou, Christos H. (1977). The Euclidean travelling salesman problem is NP-complete. Theoretical Computer Science, 4(3), 237–244.

    Article  Google Scholar 

  • Pinedo, Michael L. (2008). Scheduling: Theory, algorithms, and systems. New Jersey: Prentice-Hall.

    Google Scholar 

  • Porter, M. E., & Heppelmann, J. E. (2014). How smart, connected products are transforming competition. Harvard Business Review, 92(11), 64–88.

    Google Scholar 

  • Rao, Y., Huang, G., Li, P., Shao, X., & Daoyuan, Y. (2007). An integrated manufacturing information system for mass sheet metal cutting. The International Journal of Advanced Manufacturing Technology, 33(5–6), 436–448.

    Article  Google Scholar 

  • Reza Hejazi*, S., & Saghafian, S. (2005). Flowshop–scheduling problems with makespan criterion: A review. International Journal of Production Research, 43(14), 2895–2929.

    Article  Google Scholar 

  • Rudek, R. (2012). Scheduling problems with position dependent job processing times: Computational complexity results. Annals of Operations Research, 196(1), 491–516.

    Article  Google Scholar 

  • Spence, Anne M., & Porteus, Evan L. (1987). Setup reduction and increased effective capacity. Management Science, 33(10), 1291–1301.

    Article  Google Scholar 

  • Tao, F., Zhang, L., Nee, A. Y. C., & Pickl, S. W. (2016). Editorial for the special issue on big data and cloud technology for manufacturing. The International Journal of Advanced Manufacturing Technology, 84(1–4), 1–3.

    Article  Google Scholar 

  • von Luxburg, U., Bubeck, S., Jegelka, S., & Kaufmann, M. (1981). Nearest neighbor clustering. Annals of Statistics, 9(1), 135–140.

    Article  Google Scholar 

  • Westphal, S., & Noparlik, K. (2014). A 5.875-approximation for the traveling tournament problem. Annals of Operations Research, 218(1), 347–360.

    Article  Google Scholar 

  • White, Charles H., & Wilson, Richard C. (1977). Sequence dependent set-up times and job sequencing. The International Journal of Production Research, 15(2), 191–202.

    Article  Google Scholar 

  • Witten, Ian H., & Frank, Eibe. (2005). Data mining: Practical machine learning tools and techniques. Burlington: Morgan Kaufmann.

    Google Scholar 

  • Zandin, K. B. (Ed.). (2001). Maynard’s industrial engineering handbook. New York: McGraw-Hill.

    Google Scholar 

  • Zhong, R. Y., Lan, S., Xu, C., Dai, Q., & Huang, G. Q. (2016). Visualization of RFID-enabled shopfloor logistics Big Data in Cloud Manufacturing. The International Journal of Advanced Manufacturing Technology, 84(1–4), 5–16.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Petri Helo.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Ahmadov, Y., Helo, P. A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing. Ann Oper Res 270, 5–24 (2018). https://doi.org/10.1007/s10479-016-2304-3

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10479-016-2304-3

Keywords

Navigation