Development of a manufacturing method for precast elements of reinforced-concrete pipes of the Zagorsk pumped-storage station using electric heating of the concrete mix

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. Guide to Winter Concreting with the Use of the Thermos Method [in Russian] NIIZhB, Moscow (1975).

  2. V. M. Milonov and V. N. Goryachev, Calculation of Nonuniform Heating of Thick-Walled Reinforced-Concrete Members [in Russian], Stroiizdat, Moscow (1972).

    Google Scholar 

  3. N. V. Yudina, V. S. Luk'yanov, I. I. Denisov, et al., Author's Certificate 476, 994 (USSR), “Method of manufacturing concrete structures,” Byull. Izobret., No. 26 (1975).

  4. Recommendations on Calculation of the Permissible Temperature Differences when Removing Precast Reinforced-Concrete Elements from Chambers and Measures to Increase Them [in Russian], TsNIIS Mintransstroya, Moscow (1971).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 10–13, March, 1982.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yudina, N.V., Osipov, A.D., Slozhenikin, V.V. et al. Development of a manufacturing method for precast elements of reinforced-concrete pipes of the Zagorsk pumped-storage station using electric heating of the concrete mix. Hydrotechnical Construction 16, 126–131 (1982). https://doi.org/10.1007/BF01439952

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01439952

Keywords

Navigation