Skip to main content
Log in

Surveying works for assembling the tracks of the inclined gate on the upstream face of the arch dam of the Inguri hydroelectric station

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 11–12, April, 1982.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kuznetsov, G.I. Surveying works for assembling the tracks of the inclined gate on the upstream face of the arch dam of the Inguri hydroelectric station. Hydrotechnical Construction 16, 196–199 (1982). https://doi.org/10.1007/BF01427166

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01427166

Keywords

Navigation