8-4-8-4 SCHEME

  • Reference work entry

It is method of scheduling the plant to work with two eight hour shifts separated by two four hour time blocks for maintenance, tool change, restocking, long setups and so on.

See Integrated preventive maintenance; Lean manufacturing implementation; Maintenance management models; Preventive maintenance; Total productive maintenance.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   539.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Editor information

P. M. Swamidass

Rights and permissions

Reprints and permissions

Copyright information

© 2000 Kluwer Academic Publishers

About this entry

Cite this entry

(2000). 8-4-8-4 SCHEME . In: Swamidass, P.M. (eds) Encyclopedia of Production and Manufacturing Management. Springer, Boston, MA . https://doi.org/10.1007/1-4020-0612-8_2

Download citation

  • DOI: https://doi.org/10.1007/1-4020-0612-8_2

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-0-7923-8630-8

  • Online ISBN: 978-1-4020-0612-8

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics