Skip to main content

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 532.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Battersby, A. (1967). Network Analysis for Planning and Scheduling, 2nd ed., Macmillan, London.

    Google Scholar 

  2. Clark, W. (1952). The Gantt Chart: A Working Tool for Management, Pitman Publishing, New York.

    Google Scholar 

  3. Moder, J.J., Phillips, C.R., and Davis, E.W. (1983). Project Management with CPM, PERT, and Precedence Diagramming, 3rd ed., Van Nostrand Reinhold, New York.

    Google Scholar 

  4. Moore, F.G. (1967). Manufacturing Management, 4th ed., Irwin/McGraw-Hill, Burr Ridge, Illinois.

    Google Scholar 

  5. Nahmias, S. (1997). Production and Operations Analysis, 3rd ed., Irwin/McGraw-Hill, Burr Ridge, Illinois.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2001 Kluwer Academic Publishers

About this entry

Cite this entry

Nahmias, S. (2001). Gantt charts . In: Gass, S.I., Harris, C.M. (eds) Encyclopedia of Operations Research and Management Science. Springer, New York, NY. https://doi.org/10.1007/1-4020-0611-X_375

Download citation

  • DOI: https://doi.org/10.1007/1-4020-0611-X_375

  • Published:

  • Publisher Name: Springer, New York, NY

  • Print ISBN: 978-0-7923-7827-3

  • Online ISBN: 978-1-4020-0611-1

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics