Volume 27, Issue 2-3, June 2005
ISSN:
0171-6468 (Print)
1436-6304 (Online)
In this issue (14 articles)
-
OriginalPaper
Lean buffering in serial production lines with non-exponential machines
Emre Enginarlar, Jingshan Li, Semyon M. Meerkov Pages 195-219 -
OriginalPaper
Analysis of flow lines with Cox-2-distributed processing times and limited buffer capacity
Stefan Helber Pages 221-242 -
OriginalPaper
Performance evaluation of production lines with finite buffer capacity producing two different products
M. Colledani, A. Matta, T. Tolio Pages 243-263 -
OriginalPaper
Integrated quality and quantity modeling of a production line
Jongyoon Kim, Stanley B. Gershwin Pages 287-314 -
OriginalPaper
An analytical method for the performance evaluation of echelon kanban control systems
Stelios Koukoumialos, George Liberopoulos Pages 339-368 -
OriginalPaper
Closed loop two-echelon repairable item systems
L. Spanjers, J. C. W. van Ommeren, W. H. M. Zijm Pages 369-398 -
OriginalPaper
A review and comparison of hybrid and pull-type production control strategies
John Geraghty, Cathal Heavey Pages 435-457 -
OriginalPaper
Planning order releases for an assembly system with random operation times
Sven Axsäter Pages 459-470

Continue reading...
To view the rest of this content please follow the download PDF link above.