An ISM approach for modelling the enablers in the implementation of Total Productive Maintenance (TPM) Rajesh AttriSandeep GroverDeepak Kumar Original Article 31 March 2012 Pages: 313 - 326
Cost benefit analysis of a two dissimilar unit cold standby system with Weibull failure and repair laws Rakesh GuptaPankaj KumarAmit Gupta Original Article 10 May 2012 Pages: 327 - 334
Software metrics for effective project management Kanhaiya Jethani Case Study 25 May 2012 Pages: 335 - 340
Availability, MTTF and cost analysis of a system having two units in series configuration with controller V. V. SinghS. B. SinghC. K. Goel Original Article 02 June 2012 Pages: 341 - 352
System modeling and analysis of a combined cycle power plant Nikhil DevSamsherS. S. Kachhwaha Original Article 04 August 2012 Pages: 353 - 364
Analysis of barriers of total productive maintenance (TPM) Rajesh AttriSandeep GroverDeepak Kumar Original Article 14 August 2012 Pages: 365 - 377
Parameter estimation of Lindley distribution with hybrid censored data Puneet Kumar GuptaBhupendra Singh Original Article 14 August 2012 Pages: 378 - 385
Parallel architecture coding: link failure–recovery mechanism (PAC: LF–RM) Nitin RakeshVipin Tyagi Original Article 14 August 2012 Pages: 386 - 396
Job scheduling in a yam flour producing company in Benin City A. O. Odior Case Study 27 September 2012 Pages: 397 - 403
Manufacturing system’s effectiveness measurement by using combined approach of ANP and GTMA Sanjeev GoyalSandeep Grover Original Article 31 October 2012 Pages: 404 - 423
Profit analysis of a 2-out-of-2 redundant system with single standby and degradation of the units after repair Jitender KumarM. S. KadyanS. C. Malik Original Article 16 November 2012 Pages: 424 - 434