First results of inspection of structural components at the Sayano-Shushenskaya HPP after the failure of 17 August 2009 E. N. BellendirYu. D. SemenovV. G. Shtengel’ Hydrotechnical Construction 18 March 2011 Pages: 335 - 341
The bed of the sayano-shushenskaya hpp: structure, properties, and condition O. K. Voronkov OriginalPaper 18 March 2011 Pages: 342 - 347
Status of water-development works at the sayano-shushenskaya hpp during operation in the winter of 2009 – 2010 A. A. Khrapkov OriginalPaper 18 March 2011 Pages: 348 - 355
Analytical substantiation of the safety of modern water-development works and characteristics of consideration of effects due to production equipment during an earthquake Yu. B. MgalobelovA. V. Deineko OriginalPaper 18 March 2011 Pages: 356 - 361
Assignment of safety criteria to the stability of earthen slopes of retaining structures A. A. PodvysotskiiA. P. Dolgikh OriginalPaper 18 March 2011 Pages: 362 - 364
Strength analysis of massive reinforced-concrete structures using the method of equivalent shells A. P. DolgikhA. A. Podvysotskii OriginalPaper 18 March 2011 Pages: 365 - 368
Mathematical model of the behavior of the rock mass enclosing chamber workings at the Rogunskaya HPP V. V. Orekhov OriginalPaper 18 March 2011 Pages: 369 - 373
Approximation of the depression curve of the inflow to an ideal trench V. N. BukhartsevM. R. Petrichenko OriginalPaper 22 March 2011 Pages: 374 - 377
90-MW single-shaft power generating steam-gas unit based on the GTÉ-65 gas turbine and K-30-60 steam turbine A. S. LebedevO. V. AntonyukV. A. Konashkov Thermal Power Stations 18 March 2011 Pages: 378 - 381
Combustion of baltic oil shales in boilers with fluidized bed combustion D. NeshumayevA. OtsA. Prikk OriginalPaper 18 March 2011 Pages: 382 - 385
Wet-steam erosion of steam turbine disks and shafts N. V. AverkinaI. V. ZheleznyakV. I. Shishkin OriginalPaper 22 March 2011 Pages: 386 - 393
A study of drum boiler baffles with an amine water regime V. A. BogachevA. V. KirilinaB. É. Shkol’nikova OriginalPaper 22 March 2011 Pages: 394 - 399
Development and study of boilers with a ring furnace using different coals A. S. FomichevO. V. Pilipenko OriginalPaper 22 March 2011 Pages: 400 - 405
Synchronization on run-down at the start-up of high-power synchronous and asynchronous compensators V. I. DovganyukI. Ya. DovganyukP. V. Sokur Power Systems and Electric Networks 22 March 2011 Pages: 406 - 410
Thyristor starters for ASK-100 asynchronized compensators B. Z. DrobkinM. V. ProninA. G. Vorontsov OriginalPaper 19 March 2011 Pages: 411 - 415
Laser technology for determining the geometry of a hydroelectric generator rotor under load D. V. KulikovYu. A. AnikinV. G. Meledin OriginalPaper 19 March 2011 Pages: 416 - 420