Causes of the failure of the no. 2 hydraulic generating set at the Sayano-Shushenskaya HPP: criticality of reliability enhancement for water-power equipment I. G. Belash Hydrotechnical Construction 22 September 2010 Pages: 165 - 170
Tectonophysical aspects of the stress-strain state of large concrete dams A. N. MarchukN. A. Marchuk OriginalPaper 22 September 2010 Pages: 171 - 175
Local scouring and condition of channel stabilization in tail race of Kama HPP A. B. VekslerL. Yu. DreizinaN. N. Prosvetova OriginalPaper 22 September 2010 Pages: 176 - 186
Approximate estimation of depth of flooding of land along the tail race during a breach of the thrust front at low-head hydroprojects G. M. KaganovV. I. VolkovI. A. Sekisova OriginalPaper 22 September 2010 Pages: 187 - 191
Index method for determination of turbine efficiency during full-scale tests N. I. Zubarev OriginalPaper 22 September 2010 Pages: 192 - 194
Probable maximum flood (PMF): basic information and problems with the procedure used for its calculation in Russia A. N. ZhirkevichA. E. Asarin OriginalPaper 22 September 2010 Pages: 195 - 201
Abnormal operating modes and reliability of modern hydraulic generating sets F. L. Kogan Events 22 September 2010 Pages: 202 - 207
Modernization of heat exchangers in steam turbine units taking features of their operation at specific thermal power plants into account A. Yu. RyabchikovK. É. AronsonN. V. Zhelonkin Thermal Power Stations 22 September 2010 Pages: 208 - 212
Use of coal blends at thermal power plants A. N. AlekhnovichV. V. Bogomolov OriginalPaper 22 September 2010 Pages: 213 - 219
PGU-230 steam-gas unit design for combined cycle operation at the Heller thermal power plant A. V. DavydovYu. A. RadinF. Guyash OriginalPaper 22 September 2010 Pages: 220 - 226
Low-temperature swirl combustion of different kinds of fuel in a BKZ-210-13.8 boiler at the Kirov TÉTs-4 heating and electric power plant K. A. Grigor’evV. E. SkuditskiiV. V. Osmanov OriginalPaper 22 September 2010 Pages: 227 - 230
Methods for utilization of the heat in smokestack ventilator air at thermal power plants S. K. ZiganshinaA. A. Kudinov OriginalPaper 22 September 2010 Pages: 231 - 236
Criteria for constructing remote protection with monitoring of current increases from power swinging and asynchronous behavior A. S. Shalimov Power Systems and Electric Networks 22 September 2010 Pages: 237 - 240
Research and development in the field of generator flaw detection Yu. N. Samorodov OriginalPaper 22 September 2010 Pages: 241 - 248
Measurement of the temperature of a stator winding with fiber-optic sensors in bench tests of a turbogenerator É. I. GurevichA. A. LyaminI. S. Shelemba OriginalPaper 22 September 2010 Pages: 249 - 254