Designing and Performing Water Drawdown Operations in the Construction of Major Power Plants E. A. LokhankovaV. A. Nepomnyashchii OriginalPaper Pages: 389 - 393
Designing and Constructing Antileakage Devices in the Foundations of the Bureya Dam E. S. ArgalG. G. Tuzhikhin OriginalPaper Pages: 394 - 401
Cementation Operations in the Building of the Kousar Dam, Iran G. G. TuzhikhinA. V. Kolichko OriginalPaper Pages: 402 - 405
Building Antileakage Structures in Hard-Rock Foundations of Far North Power Plants V. I. FedoseevI. N. ShishovV. N. Frumkin OriginalPaper Pages: 406 - 411
Refinement of Method of Building Grout Curtains in Permanently Frozen Rock Beds of Water-Development Works V. N. FrumkinV. I. FedoseevM. M. Sherman OriginalPaper Pages: 412 - 420
Determination of Optimal Blast Parameters for Construction of Blast-Created Rock-Fill Dams M. B. ÉtkinA. E. Azarkovich OriginalPaper Pages: 421 - 427
Generalized Representation of Seismic Process for Dynamic Calculation of the Effect of Explosions M. I. Shuifer OriginalPaper Pages: 428 - 431
Selection of Efficient Process Flow Charts for Construction of Lengthy Tunnels M. G. Bikineev OriginalPaper Pages: 432 - 435
Investigations of the Penetrability of Cement Grout into a Cavity Having a Small Opening V. A. AshikhmenL. E. Pronina OriginalPaper Pages: 436 - 440