The Boguchany Hydroelectric Power Plant: Expediency of Completion and Prospects for Utilization V. P. Grebenshchikov OriginalPaper Pages: 207 - 212
Use of Expert and Systems Analyses in Selecting Contractors for Construction and Assembly Work N. T. Kaveshnikov OriginalPaper Pages: 213 - 220
Preparation of the Foundation Bed for Structures of the No. 3 Hydroelectric Power Plant in the Lower Cherek Series V. P. Nikonorov OriginalPaper Pages: 221 - 224
Numerical Modeling of the Interaction Between a Soil Mass and Concrete Structures I. U. Madzhidov OriginalPaper Pages: 225 - 226
Reliability in Radial-Axial Turbine Rotors S. V. IvanovV. E. Babachenko OriginalPaper Pages: 227 - 231
Thrust Bearing Operation in Toktogul HES Hydrogenerators B. B. Aitkeev OriginalPaper Pages: 232 - 233
Repairing PL Turbine Rotor Chambers for Repair and Upgrading N. Yu. DmitrievE. M. DzyubanovG. V. Safonov OriginalPaper Pages: 234 - 239
Transfer Pipes as a Good Means of Preventing Hydraulic Shocks A. V. KhokhlovV. A. Khokhlov OriginalPaper Pages: 244 - 247
Current State of Construction of the Three Gorges Hydrosystem G. G. LapinS. P. Paremud OriginalPaper Pages: 260 - 264
Social and Ecological Aspects of the Three Gorges Project A. E. AsarinG. G. Lapin OriginalPaper Pages: 265 - 267