Background

Due to the complexity of many public health interventions, it is notoriously difficult to uncover underlying mechanisms surrounding an intervention’s effect or lack thereof. Process evaluations address this ‘black box’ of effectiveness [1] by providing important information to help explain how and why outcomes occurred [1,2,3]. As such, conducting process evaluations alongside intervention effectiveness trials is recommended [1, 3, 4]. The findings may reduce research waste; save valuable time and resources of health service providers; and provide decision makers with direction, particularly for intervention scale-up and dissemination in other contexts [3, 5].

Implementation interventions aiming to enhance the uptake of evidence-based policies or practices are often quite complex [6]. Although some interventions use only one or two strategies to assist implementation, many consist of multiple strategies that target numerous implementation determinants [7]. To date, there are over 70 discrete implementation strategies documented [8], each of which is multifaceted in nature [6]. For example, the single strategy ‘conduct educational meetings’ may involve more than one stakeholder group, mode of delivery, setting and/or occurrence. These complexities pose a challenge determining which strategy, or combination of strategies, most likely led to the outcomes of implementation intervention studies (and how). Given that implementation science is a relatively new area of science, little is known about the most efficient and effective approaches to achieve implementation of evidence-based policies or practices in various contexts [7]. Robust process evaluations of packaged implementation strategies hold considerable potential to contribute to this scant evidence base.

This paper describes the mixed methods process evaluation undertaken as part of a research initiative optimising a package of implementation strategies to improve schools’ implementation of a government physical activity policy. In response to poor physical activity policy implementation by schools worldwide [9,10,11,12,13,14,15,16,17,18,19], and limited research about strategies to support schools to address this, Nathan et al. developed the ‘Physically Active Children in Education (PACE)’ intervention [20]. PACE consisted of eight implementation strategies, each chosen using the Theoretical Domain Framework (TDF) and the Behaviour Change Wheel (BCW) to overcome identified barriers [21], to support school’s compliance with an Australian state-level physical activity policy [22]. In a series of randomised and controlled trials (RCTs), PACE consistently improved policy implementation by schools [17, 23] alongside high reports of fidelity and perceived satisfaction by stakeholders [17]. Furthermore, its meaningful impact was maintained at a lower cost to the health service provider when several implementation strategies were adapted to reduce the in-person contact time used to support schools (i.e., Adapted PACE) [24]. Although effective, little was known about which PACE implementation strategies, in either their original or adapted format, were “most commonly needed, feasible to deploy, and effective across implementation efforts” [25]. A greater understanding of each implementation strategy could inform further optimisation processes [26, 27] to improve PACE for delivery to the remaining 400+ schools in the health service region [28] and for broader scale-up. Additionally, this information could contribute to a scant evidence base regarding discrete implementation strategies employed both in schools and other settings.

We conducted a mixed methods process evaluation alongside a cluster randomised implementation trial to explore the implementation of the eight discrete PACE implementation strategies from the perspective of school stakeholders and PACE delivery personnel. This included a comparison of PACE and Adapted PACE, to highlight any qualitative differences when delivered with reduced in-person support. The specific objectives were:

  1. A.

    To quantitatively measure each strategy in regards to key implementation indicators including dose delivered, fidelity, adoption and acceptability (implementation outcomes [29]);

  2. B.

    To qualitatively explore factors that influenced program implementation (barriers and facilitators); and

  3. C.

    To assess the importance of each strategy using outcomes from both the quantitative and qualitative data sets.

Methods

Research design

This process evaluation accompanies the Adapted PACE cluster randomised noninferiority trial [24] undertaken from October 2018 – December 2019 (Australian New Zealand Clinical Trials Registry: ACTRN12619001229167). We used a convergent mixed methods triangulation research design with quantitative and qualitative data from participants in both active trial arms collected simultaneously and weighted equally (QUAN+QUAL) [30, 31]. The Medical Research Council (MRC) guidance on the process evaluations of complex interventions [3], and the evaluation roadmap for physical activity interventions developed by McKay et al. [29], informed study design, planning and execution.

The Adapted PACE noninferiority trial

Full details of the Adapted PACE cluster randomised noninferiority trial is published elsewhere [24]. Briefly, the trial was conducted in 48 primary schools in NSW, Australia. Following consent and completion of baseline data collection, an independent statistician used a computerised random number function to block randomise schools in a 1:1 ratio to receive either PACE or Adapted PACE. Table 1 includes an overview of the eight implementation strategies (listed numerically) and their components (alphabetised), and adaptations made for Adapted PACE. In short, strategy 1 (ongoing support for the in-school champion [ISC]) and 2a (principal meeting) were delivered via email/telephone rather than in-person, and strategy 5 (educational outreach visit) was delivered by an ISC rather than an external project officer.

Table 1 Description of PACE implementation strategies and the joint display of quantitative implementation indicators (adoption and acceptability), usefulness and relevant qualitative themes for each

Consistent with the previous PACE trials [17, 23], the primary outcome measure used to assess program impact was teachers’ mean minutes of total physical activity (physical education [PE], sport, energisers or active lessons) implemented across the school week. Both groups saw improvements in the minutes of physical activity teachers implemented per week at follow-up, and there was a high probability of no meaningful difference between the effect of original PACE and Adapted PACE. A cost minimisation analysis conducted from the health service provider perspective showed an estimated reduction (in AUD) of $373 (Uncertainty Interval = $178, $573) per school to deliver Adapted PACE compared to PACE. On the basis of these findings, we concluded that Adapted PACE is a cost-efficient alternative that is “as good as” [32] PACE in assisting schools’ implementation of a physical activity policy.

Data collection

To ensure a full range of perspectives, we sought to obtain data from all parties involved in the delivery and implementation of strategies: PACE project officers (a PE teacher and health promotion practitioner; schools’ primary source of contact) and school stakeholders targeted by strategies (principals, ISC and teachers). Quantitative data were collected from project records maintained by project officers throughout the study period and surveys of school stakeholders conducted immediately following intervention delivery at 12-month follow-up (Oct-Dec 2019). Qualitative data were collected via semi-structured interviews of project officers and a subsample of ISC also at 12-month follow-up. Figure 1 provides an overview of data collection methods and corresponding analytic procedures used to address each research objective.

Fig. 1
figure 1

An overview of the convergent mixed method analytic procedure used for this study, including method of data collection and analysis to address each research objective. Quantitative data collection measures and method of analysis for research objective A is displayed on the left. Qualitative data collection measures and method of analysis for research objective B is displayed on the right. Both sides converge for the mixed methods procedure and interpretation for research objective C

Project records

Project officers documented the implementation of strategies using an Excel spreadsheet modified from previous trials of PACE [17, 20]. This included the expended time and mode of delivery (in-person, email or telephone) they employed to deliver strategies, as well as the school-level response such as staff engagement and attendance at training. These records enabled assessment of implementation outcomes (research objective A) as defined by McKay et al. [29], including dose delivered (intended units delivered), fidelity (the extent to which strategies were implemented as prescribed) and adoption (proportion and representativeness of school stakeholders that utilised strategies) (Additional file 1). School characteristics were also recorded to provide contextual information.

School stakeholder surveys

All consenting school stakeholders completed a paper survey modified from previous trials [17, 20]. In this study, these surveys were used to obtain respondent characteristics, inform implementation indicators [29] (research objective A) and assess usefulness of strategies (research objective C). Additional file 1 provides an overview of the measures used to assess the different indicators for each strategy. Briefly, principal surveys included measures of adoption for schools’ mandated change (e.g., if their school had a physical activity policy). Teacher surveys included measures of acceptability (e.g., the extent to which respondents agreed that the staff training was acceptable in assisting them to schedule physical activity); adoption (e.g., whether they had used PACE resources); and usefulness (e.g., whether the resources provided on the online portal were useful). ISC surveys were an expansion of the teacher survey, and included measures of usefulness for select strategies, inquiring the extent to which they were perceived as ‘useful’ for program implementation.

Semi-structured interviews of project officers

All project officers involved in the delivery of PACE (N = 6) were interviewed using a semi-structured interview guide developed following guidelines [31]. Open-ended questions explored project officer’s perspectives of program implementation by schools, including any barriers and facilitators to doing so (research objective B). Project officers were also asked to rank the top three strategies that they perceived as essential for successful program implementation and provide a rationale for these choices (research objective C). The facilitator used prompts to explore differences between PACE and Adapted PACE.

Semi-structured interviews of ISC

We purposively sampled ISC using a maximum variation approach [33] with a minimum target sample size of eight ISC: four from PACE schools and four from Adapted PACE schools with at least one in each group representing low and high levels of program engagement. Following recommendations for qualitative sampling [33, 34], project officers carried out recruitment by email invitation until we reached data saturation (i.e., sampling to the point of redundancy) to ensure sufficient depth of data for a robust analysis. Interviews offered in-person or by telephone were scheduled in advance with consenting ISC. They were conducted using a semi-structured interview guide developed following guidelines [31]. Open-ended questions explored participant’s experiences with PACE and factors that influenced implementation by schools (research objective B). Each participant received a $30 grocery gift card as a token of appreciation for their time.

Data analysis

Quantitative and qualitative data were analysed separately and then merged for interpretation as per Creswell et al. [30] (Fig. 1).

Quantitative data analysis

An independent statistician used project records and survey data to produce descriptive statistics (mean, SD and proportions) to address each research objective.

Qualitative data analysis

Interviews were audio-recorded and transcribed verbatim. Interview facilitators checked transcripts for accuracy, corrected as necessary and anonymised any identifiable comments. The final copies were entered into QSR NVivo [35] for inductive thematic analysis using the standard approach reported by Braun and Clarke [36]. First, two experienced members of the research team (i) independently coded a subset of transcripts, (ii) checked for agreeance and resolved discrepancies with a third researcher, and (iii) developed a combined code scheme. One of the researchers then applied the code scheme to the remaining transcripts, discussing new codes with the other researcher and updating where necessary. The analysis pair then looked for patterns within the final codes and generated a list of themes that emerged in relation to research objective B. The proposed list of themes was reviewed, modified where required and finalised with names and definitions for each. This process was guided by a consensual qualitative research process [37] inclusive of ongoing discourse and confirmation with other members of the PACE evaluation and delivery team. In addition, one member of the research team searched project officer transcripts and recorded for each, the top three strategies reported as essential for successful program implementation (research objective C).

Mixed methods analysis

Quantitative and qualitative data were weighted equally due to their shared contribution in addressing evaluation objectives. Each data set were integrated [30, 38] using common methods for data integration. In the first method, known as ‘following a thread’ [38], we used preliminary findings from each data set to form hypothesis warranting further exploration, identify key themes, and/or interpret the other data set. In the second method of data integration, we compared and integrated the findings from each data set according to ‘triangulation protocol’ [38]. Specifically, we developed a side-by-side joint display table [39] with quantitative and qualitative findings juxtaposed in relation to each implementation strategy, facilitating cross-data comparison and convergence including areas of agreement, dissonance, or silence (when a theme from one data set is not found in another) [38]. We reported an integrative review of results derived from this process in the form of theoretical statements referred to as meta-inferences [40].

Results

At 12-month follow-up, a total of 33 principals (33/48; response rate = 69%), 51 ISC (51/57 from 41 schools [some schools had > 1 ISC]; response rate = 89%) and 260 teachers (across all 48 schools) completed surveys; and 11 ISC took part in an interview (Fig. 2). Table 2 provides an overview of the characteristics of schools, principals and teachers, including a breakdown between groups.

Fig. 2
figure 2

An overview and timeline of the PACE noninferiority trial [24] process evaluation. This shows when the process evaluation data was collected (at follow-up) in relation to the entire research trial timeline. It also shows schools’ fidelity of each implementation strategy – listed in order of delivery – for each of PACE and Adapted PACE schools

Table 2 Overview of school, principal and teacher characteristics at 12-month follow-up

Research objective A: implementation indicators

Dose delivered and fidelity

Project officers delivered each strategy to all schools (dose delivered = 100%). Fig. 2 details fidelity of each implementation strategy. There was at least 95% fidelity for at least one component of each strategy at all schools with the exception of 71% fidelity of the educational outreach visit at Adapted PACE schools.

Adoption and acceptability

Table 1 includes a comprehensive description of the adoption and acceptability of strategies by targeted stakeholders. Overall the PACE implementation strategies were highly adopted, with no less than 83% adoption by schools and/or stakeholders to at least one component of each strategy. Some strategy components had low adoption (≤50%), in particular strategy 2b (school executives develop a school physical activity policy) with 39% of principals indicating an existing physical activity policy at their school. Other components with low adoption were those related to the online portal. For example, 50% of schools had at least one teacher view the professional learning videos available on the online portal and 43% of surveyed teachers reported accessing the online portal resources. There was little variation between PACE and Adapted PACE in regards to strategy adoption. Adapted PACE had 25% lower adoption to strategy 5 (staff training session) although three schools were ‘unknown’, and 49% lower adoption to strategy 8b (ISC develop further equipment packs).

The implementation strategies were considered highly acceptable by stakeholders. More than 50% of teachers agreed or strongly agreed that all but one strategy were acceptable in assisting them to schedule physical activity. The information on the online portal was considered acceptable by 43% of surveyed teachers. There was little variation between PACE and Adapted PACE schools in regards to strategy acceptability, with the exception of strategy 5 (staff training session), with nearly 20% fewer teachers at Adapted PACE schools indicating acceptability for both the overall session and content.

Research objective B: influences of implementation

Thematic analysis revealed several influential factors of implementation (facilitators and barriers). Each theme fell within one of three identified categories: external policy landscape, inner organisational context/structure (schools) or PACE characteristics and processes. This fits within three of the five broad domains of the Consolidated Framework for Implementation Research (CFIR): outer setting, inner setting, and intervention characteristics [41]. Figure 3 provides an overview of themes and subthemes that emerged within each category, and Table S3 describes each and includes sample quotes.

Fig. 3
figure 3

An overview of the influential factors of implementation that emerged through thematic analysis, falling within three broad categories: external policy landscape, inner organisational context/structure of schools, and PACE characteristics and processes

External policy landscape

The external policy landscape consisted of the NSW Department of Education Sport and Physical Activity Policy [22], and the Personal Development, Health and Physical Education (PDHPE) syllabus released by NSW Education Standards Authority (NESA) in 2018 [42]. For the most part, these government mandates appeared to facilitate program implementation by necessitating that schools provided physical activity. The new syllabus was a barrier for staff that perceived accommodating further scheduling changes as burdensome.

Inner organisational context/structure (schools)

Several themes emerged related to the inner organisational context/structure of schools. Facilitators included teacher’s positive physical activity values and beliefs; executives’ support of PACE and accordingly, teachers’ provision of school day physical activity; and schools with a culture conducive to physical activity that perceived PACE as a useful addition. Barriers included the limited time and competing demands of staff; staff turnover; teacher’s negative physical activity values and beliefs; schools with a culture conducive to physical activity that perceived PACE as unnecessary; and schools without a physical activity culture that did not assign value to it.

The most prominent inner setting theme was “ISC power-interest” whereby the level of program implementation at each school was proportional to the power and interest of the ISC. This corresponds to stakeholder analysis theory from the organizational strategic management literature, in which stakeholders with high power (ability to influence others due to their position within an organization or devolution) and high interest are considered most salient to achieve objectives. Using pre-defined stakeholder classifications [43], our data showed that ISC ‘Players’ (high power and high interest) were consistently associated with greater implementation of PACE strategies. Conversely, schools with ISC that had low power and/or low interest (‘Subjects’, ‘Context Setters’, and ‘Crowd Members’) were challenged to implement some PACE strategies (Fig. 4).

Fig. 4
figure 4

A power-interest matrix that was adapted from Eden & Ackermann, 1998, pg. 349 [43] to show the different categories of in-school champions in the current study with example quote(s) provided for each. Traffic light colours are used to show the likelihood of successful implementation (of strategies) experienced. In-school champion ‘Players’ are shown in green due to their high likelihood of successful implementation. In-school champion ‘Context Setters’ and ‘Subjects’ are shown in yellow due to their potential for successful implementation with further assistance. In-school champion ‘Crowd Members’ are shown in red as they were unlikely to experience successful implementation and faced several challenges

PACE characteristics and processes

The final themes relating to PACE characteristics and processes were implementation facilitators: (i) the adaptable and flexible model providing a variety of physical activity options for teachers; (ii) the observable benefits of the program on students; and (iii) the engaging nature of the intervention via practical hands-on training sessions, expertise and energetic support from project officers, and the provision of quality resources.

Research objective C: importance of strategies

Table 1 is the joint-display used to address research objective C, with quantitative and qualitative findings juxtaposed in relation to each strategy.

Strategy 1: external, ongoing support

This was not considered within the top three for ‘most important strategy’ by any project officer, although the project officer characteristics (e.g., energetic expertise) contributing to an engaging innovation, was a theme for facilitating implementation:

PACE ISC 62: And we also were lucky enough to have [PO] to come in, and he showed how you could do it easily linked to maths and easily get it within your classrooms for other things as well, which was really good. He was really inspirational. His energy was amazing and the staff really liked having him there … when [PO] came with his energy and made it look so simple, a lot of people instantly started doing it.

Those schools with ISC ‘Players’ appeared to rely less on this strategy, particularly Adapted PACE ISC that successfully delivered the staff training themselves:

Adapted PACE ISC 107: … we don't need micro-managing but we also don't need onerous stuff. Every now and then is great and that's fine and email conversation is perfect … so we have a conversation and then we [ISC] keep that alive in our school.

This strategy had high rates of adoption (all but one school engaged in correspondence with project officers) and reported acceptability by ISC (87%). Qualitative data revealed that limited time and competing demands of staff was a key implementation barrier; suggesting that strategies such as this one which demands little of stakeholders’ time and energy (with responsibility falling on the health service provider) may be highly adopted and acceptable by stakeholders.

Metainferences: This strategy is easily executed and assists with successful program implementation. It is highly important for schools without ISC ‘Players’.

Strategy 2: mandate change

This was considered the most important strategy (ranked first) by 5/6 project officers and all interviewed ISC referred to the importance of executive support, except those who were an executive themselves. As such, the presence of a supportive executive within schools was a theme for facilitating implementation:

PACE ISC 121: … because if you're doing the whole school stuff, then everyone needs to be on board and the best way for this is the executive to lead the way. So whoever's in charge, like one of your deputies or your [assistant principal] are involved and leading it, it's much more likely to be implemented in the classrooms. Yeah, they need to be on board from the start.

Executive support also equipped ISC with the ‘power’ necessary to successfully implement strategies:

Project officer 06: The [ISC] who had those executive support or were executives, they were a lot more positive about the program … there was definitely more change in the school and more successful with the entire program.

Several interviewed project officers and ISC indicated that executives drove the physical activity culture of schools; another theme that facilitated program implementation. In the quantitative findings, 84% of ISC reported that principal support to schedule physical activity was useful/extremely useful. This strategy was also associated with several positive implementation indicators: 100% of schools had a school executive provide verbal commitment to the program during an initial meeting; 80% of surveyed school principals reported a school-level physical activity policy either existing or in the process of being developed; 84% communicated their support for the program to the broader school community; and 72% indicated that PACE was a school priority. However over one quarter (30%) of surveyed teachers did not feel that they had support from their school executive. Further exploration of the qualitative data showed agreeance with these quantitative findings. Whilst executive support was reportedly provided at most schools, there were select schools where it was considerably less prevalent or non-existent:

Project officer 03: You have some [executives] that'll just go past their desk and they just flick it to, “oh this will go to our sports person” and they don't even look at it again. They don't even come to the staff meeting … We had a mix of schools where that would happen, where we get that kind of high adoption or low adoption.

Poor executive support was associated with low ISC power, making them a ‘Crowd Member’ or ‘Subject’ and thus hindering their ability to perform responsibilities and implement the program. It was also associated with a school culture that was non-conducive to physical activity in which PACE was insufficient to instigate change. Both of these were identified as key barriers to program implementation.

Metainferences: This strategy is highly important for successful implementation and is also linked to other important strategies. It may be poorly adopted by some schools.

Strategy 3: identify and prepare ISC

This was considered an important strategy by all project officers; ranked first by one project officer and within the top three by the other five project officers. This strategy was strongly related to the qualitative theme of ISC power-interest; identifying an ISC ‘Player’ with a high level of power and interest from the onset appeared to be beneficial, if not essential, for program implementation:

Project Officer 02: It really depends on who the school champion is and who you connected with as to how the school takes it on board … So if the school champion is completely on board and can evoke change and can deliver, get the staff on board.

The one-day workshop was also considered an important piece contributing to successful program implementation, as it presented an opportunity to enhance ISC interest in the program and power (via self-efficacy) to deliver within their respective school. It also contributed to the engaging innovation via experiential learning and outlined the adaptable/flexible choice-based model – both of which emerged as themes for facilitating implementation. Importantly, the workshop appeared to prepare Adapted PACE ISC to deliver the staff training themselves:

Adapted PACE ISC 66: Yeah, there was so much in that [workshop] and it was really practical and me, at that time, I wasn't probably an overly sports person at that stage, but I did feel confident that when I left I could teach it because you came away and it was an actual practical workshop.

Of the surveyed ISC, 78% indicated that having an ISC was useful/extremely useful. From the teacher perspective, 73% indicated that the assistance from their ISC to implement PACE was acceptable. These indicators show that some ISC may not have been engaged in their role. This is consistent with the qualitative findings – although most ISC were ‘Players’, there were select cases with low power and/or interest (‘Context Setters’, ‘Crowd Members’ or ‘Subjects’) which hindered program implementation:

Adapted PACE ISC 83: [I] could have been delivering it better...It's been probably half a year since I've kind of checked in about that. Things just get in the way. We've got one [executive] … and then they send me to a hundred other things and I'm only spread so thin.

Metainferences: This strategy is highly important for successful program implementation. It may be poorly implemented by some schools.

Strategy 4: develop a formal implementation blueprint

This was not considered one of the top three most important strategies; however project officers noted that it was incorporated into the full day ISC workshop. This strategy contributed to the engaging innovation via quality resources (qualitative theme and sub-theme) that facilitated implementation. A few interviewed project officers also mentioned that such school documents may be used to “handover” information to new staff, thus addressing the barrier of staff turnover (qualitative theme). Of the surveyed stakeholders, 77% of ISC indicated that developing guiding documents such as this was useful/extremely useful and 66% of teachers indicated that it was acceptable in assisting them to schedule physical activity.

Metainferences: This strategy is very easy to execute (included in strategy 3b) and may assist some schools with program implementation.

Strategy 5: educational outreach visits

This was considered an important strategy (top three) by 4/6 project officers. It corresponded to several identified implementation facilitators: strategies to enhance teachers’ attitudes, beliefs and level of support; an explanation of the choice-based model; and an engaging innovation via experimental learning to engage staff:

PACE ISC 62: At first, [staff] were like, "No, there's no way we can fit this in." But then they started realizing that you can incorporate it into other things. And we do it a lot of the time without even thinking about it. So yeah, they were really receptive … I think the staff felt that they had a better grip and handle on what they were doing with the hours.

Implementation indicators for this strategy were high for the overall sample (> 80% adoption and > 70% acceptability) however compared to PACE schools, Adapted PACE schools had lower adoption (96% vs 71%) and acceptability (81% vs 64%). The use of an ISC to deliver this strategy in Adapted PACE may impede implementation in some schools. Although the majority of ISC felt adequately prepared to deliver this strategy themselves, 18% did not. This is in agreeance with both data sets showing select cases of Adapted PACE ISC that did not proceed to deliver this strategy. This may be due to their limited time/competing demands or leaving the school before delivering the strategy (ISC turnover) – both identified barriers of program implementation. However, qualitative data positioned ISC power-interest as the primary factor that influenced implementation of this strategy at Adapted PACE schools. ISC ‘Players’ successfully delivered this strategy whereas those with low power and low interest struggled or failed to do so:

Project officer 01: … say in [Adapted PACE] the school champion has been able to go back to the school, organise a time to have the whole school meeting on the agenda, and then provide the presentation [educational outreach] the whole school and teachers have a lot more of an idea … and definitely I think if you've got the support of the executive team. So I know in some of those [Adapted PACE] schools there was an executive that was a school champion, they were able to obviously help get it on the agenda, push it into a staff meeting, organise it.

PACE used energetic and knowledgeable, external project officers to deliver this strategy which was identified as an implementation facilitator. Regardless, 12% of ISC at PACE schools did not report this strategy as being useful and 18% of teachers did not report it as acceptable. This may be due to several of the identified implementation barriers that are applicable to both intervention groups (PACE and Adapted PACE) such as low executive support, negative attitudes/beliefs of staff, or schools that already prioritised physical activity and felt PACE was unnecessary:

Adapted PACE ISC 114: I implemented daily fitness prior to even going away to the [ISC workshop] so we're still currently doing that … it hasn't really enriched what we're doing.

Metainferences: This strategy is important for successful program implementation. ISC ‘Players’ (influenced by strategy 2 and 3) are well positioned to deliver this strategy themselves. Delivery by a project officer may be needed for schools with an ISC ‘Subject’, ‘Context Setter’ or ‘Crowd Member’.

Strategies 6, 7 and 8: educational materials, success stories and equipment pack

The resources were considered important (top three) by 2/6 project officers. The quality resources contributing to an engaging innovation emerged as an implementation facilitator, with several interviewed ISC and project officers referring to their usefulness for teachers:

PACE ISC 122: Yeah, I think the resource is perfect … We can go to them if we ever really need something … it gave us a lot more tools to be able to do it and just physically not having to go and find the resources.

Quantitative data showed partial implementation for each resource: 65% of surveyed teachers found the online portal useful (43% personally accessed it) and 57% considered the equipment pack acceptable in assisting them to schedule physical activity. The qualitative data expanded on this, showing that the use of resources differed by school depending what they needed and/or found most useful. For example, some schools found the online portal most useful whereas others emphasised the equipment pack and did not use the online portal at all.

Metainferences: The resources are easily executed and may assist schools with program implementation. The importance of each resource varied by school; a range of options permit schools to select and access those that are most useful for them.

Summary of metainferences

A synthesis of metainferences for the importance of each strategy led to the conceptual model displayed in Fig. 5. No strategies appeared to be discretionary as they differed in adoption, acceptability and usefulness on a school-by-school basis. What worked best and was needed in one school was not necessarily the same for another. However, a few strategies may be considered extremely important as they resulted in improved implementation of the overall program, in addition to remaining strategies. Specifically, nominating an ISC ‘Player’ (via strategy 3a) and reinforcing this by providing them with the power (via strategy 2) and enhanced interest (via strategy 3b) to engage in responsibilities. Schools with an ISC ‘Player’ were more likely to successfully implement PACE whereas schools with an ISC ‘Crowd Member’ faced implementation challenges and required greater support from the other strategies.

Fig. 5
figure 5

A conceptual model distinguishing pathways for successful implementation based on a synthesis of meta-inferences for strategy importance. Discrete PACE strategies are outlined on the top row with those considered ‘most important’ distinguished. The flow of arrows from left to right shows where there was greater ‘need’ for strategies depending on what category of in-school champion was present at the school. Longer arrows represent less reliance on other strategies

Discussion

Studies exploring, comparing and contrasting implementation strategies for school-based physical activity interventions are rare. We had a novel opportunity to assess the implementation of eight discrete implementation strategies, previously examined through a series of randomised controlled, and noninferiority trials, which collectively improved schools’ compliance with a state-level physical activity policy. The results corroborated the noninferiority trial findings of Adapted PACE being considered “as good as” PACE for increasing teachers’ scheduled minutes of physical activity [24]. The quantitative implementation indicators were generally high for schools in both groups and the barriers and facilitators identified qualitatively were impartial to group allocation. Using state-of-the art mixed methods data integration techniques, we developed meta-inferences for the importance of each discrete implementation strategy and from that, an emergent conceptual model suggesting a path for successful implementation. Although the majority of strategies were important (4/6), two (mandating change and identifying and preparing an ISC) and a related contextual factor (ISC power-interest) emerged as critical to implementation. The findings and related recommendations to optimise PACE are discussed in the context of the literature following.

Our meta-inferences highlighted the importance of the ISC power-interest as a central component to successful implementation. Specifically, we found that schools with an ISC ‘Player’ had higher levels of implementation strategy implementation compared to those with an ISC ‘Crowd Member’. This is supported by stakeholder analysis theory [43] and recommendations to ensure that champions of school-based physical activity programs have the skills, knowledge and disposition to assume the responsibilities expected of them [44]. Further, a 2018 review of champions in healthcare-related implementation identified specific, similar characteristics associated with champions’ effectiveness, including enthusiasm and energy to drive the program, strong educator and presentation skills, having political acumen, a personal belief in the initiative, and being respected and well-liked [45]. Champion attributes may profoundly affect implementation of health interventions, and also the likelihood of their successful scale-up [46, 47]. In the 2007 World Health Organization (WHO) framework for scaling up public health interventions, Simmons and Shiffman [47] state that successful scale-up is more likely with “effective and motivated leaders who command authority and have credibility”. Identifying an ISC ‘Player’ should be a priority of PACE and where this is not possible, every effort should be taken to improve the nominee’s low power and/or interest via the ISC workshop and executive support. Frameworks and measures to identify and classify stakeholders [48, 49] may be a useful starting point for developing guidelines to systematically identify ideal ISC candidates at schools.

Mandating change also emerged as the most important strategy. Specifically, executive support facilitated the implementation of not only the overall program, but also the adoption of other strategies. As the administrative leader within schools, executives have the potential to influence implementation of health programs via endorsement, providing oversight and accountability, and/or enacting formal requirements [50]. In a 2021 evaluation of a school-based participatory health intervention, the level of leadership engagement by school administrators strongly distinguished between high and low implementation schools [51]. Similarly, an evaluation of a multi-strategy school smoking prevention program found that high- and medium- implementation schools had higher levels of administrative leadership than low implementation schools (77.3 and 83.3% vs 42.9%) [52]. The link between executive support and implementation in schools underpins that efforts are needed to address the occasional poor adoption of PACE by some school executives, although this may be naturally addressed under the external policy landscape in NSW (the Department of Education policy and the new PE syllabus). Such “macro-systemic sources of influence” create administrative pressure for schools to implement health programs [50] and may increase executive support of PACE over time. In Canada for example, the AS! BC intervention was rolled out in primary schools in the context of a Provincial Daily Physical Activity policy being implemented. Over three quarters of primary school principals (76%) reported an increased priority assigned to physical activity over a 3 year period due to a combination of AS! BC and the Provincial policy [53].

During intervention design, each PACE strategy was chosen using a robust, theory-based process to overcome identified barriers of the target behaviour [20]. Our findings endorse the final multi-strategy approach, showing that the majority of PACE strategies were important and even those considered less important remained considerably useful for implementation by some schools. This is likely due to the wide variation in factors that influence implementation of physical activity programs in schools [54] including those in the current study. In a series of RCTs undertaken to improve a multi-strategy intervention to assist schools to implement a government nutrition policy, the research team found that removing perceptibly nonessential strategies (to reduce delivery costs) forfeited the intervention effect [55]. From the current findings no PACE strategy appears dispensable; thus those identified as most important should be emphasised in efforts made to improve implementation. It is also important to note that many “less important” strategies were easily implemented within existing infrastructure and represent little opportunity cost to the health service provider and/or schools.

Although there were relatively few implementation barriers to PACE, ‘available time/competing demands of staff’ was prominent, with overt mention in nearly every interview and impacting each of principals, ISC and teachers. Accordingly, PACE strategies with the highest adoption and acceptability were those requiring the least amount of time and effort from targeted stakeholders. In a 2015 systematic review of factors influencing the implementation of school-based physical activity interventions, the most prevalent barrier was time (e.g., competing instructional requirements) [54]. Strategies to assist schools to implement school day physical activity should account for the limited time of staff, although this may be challenging in the context of scale-up which often relies more on organizations for implementation support [47]. This underscores the importance of using ISC ‘Players’, as school staff are more likely to prioritise and deliver a program that they value despite time constraints [54].

This study has several notable limitations. First, stakeholder surveys were finalised prior to our deciding to use a mixed methods approach, which resulted in less congruency between the qualitative and quantitative data collection methods than we would have liked. A prospectively designed mixed methods process evaluation would improve on this in the future. Second, there is a risk of positive response bias from ISC who may have perceived interviewers as associated with PACE delivery personnel, despite clear indication of their separation from the delivery team. Third, although our inductive, data-driven qualitative approach allowed a rich description of the data without constraint to any pre-existing framework [33, 36], future qualitative inquiry in the implementation science field could adopt a more pragmatic approach such as incorporating a framework-driven analysis [56]. Fourth, an essential ingredient within the conceptual model is ISC power-interest. This is based on a comprehensive integration of multiple data sources and rigorous analyses, however a formal comparison of quantitative intervention implementation scores and assignment to a power-interest category for each school is necessary to substantiate our findings. Lastly, although we purposefully sampled for interviews to ensure we had perspectives from a range of schools, we interviewed fewer ISC from the ‘low engagement school’ category due to recruitment challenges. Regardless, we met our total target sample and we were able to triangulate findings across school sites and supplement with project officer’s insight as ‘key informants’ [33, 34], thus achieving sufficient depth and breadth of data for schools of all implementation levels.

Conclusion

Adapted PACE is the preferred model for delivery at-scale due to its ability to reach a greater proportion of the population at a lower cost to the health service provider, and with an acceptable effect on policy implementation [24]. This study reinforces this and shows that identification and selection of ISC who are ‘Players’ and demonstration of executive support are very important (if not essential) for successful policy implementation and consequential impact. These findings expose opportune ways to optimise PACE with minimal adaptations and at no additional cost to the health service provider. Given these strategies are commonly employed to improve the implementation of policies and practices in the school setting [57], our findings may contribute to improving implementation of school health interventions broadly.