1 Introduction

Soft rock mines widely distribute in China (Niu et al. 2011) and extend to the depth at a speed of 8 m/a. The coal and rock masses in the deep mine are characterized by “three highs and one disturbance”. The large deformation and failure of surrounding rocks and the floor heave of the roadway etc. seriously affect the safe production of the coal mine (He et al. 2005, 2006; He 2014). Therefore, the supporting problem of such roadway restricts the development of coal mine (Bai et al. 2008). Owning to differences of the geological structure, mining depth, and surrounding rock properties, a variety of roadway-controlling technologies have been proposed. However, these technologies fail to be promoted and applied widely. The high-stress soft-rock roadway controlling technology in the deep mine has been the hot research focus. Lots of existing studies have been made to improve the surrounding rock strength, the supporting material strength, and the coupling of surrounding rock with support and got fruitful achievements (Bai et al. 2007; Kang et al. 2010). However, the equalized yielding support technology for the high-stress soft-rock roadway has been rarely reported (Cheng 2004; Shen and Li 2005). In this study, the south wing rail roadway on the second level in Yunjialing coal mine in China was used as an example to analyze the characteristics, deformation rule, and deformation characteristics of the surrounding rocks. On this basis, it proposed the equalized yielding support technology for the roadway with high stress and soft rocks. Field industrial experiment suggested the equalized yielding support technology could avoid the uncontrollable deformation of surrounding rocks and applied uniform stresses on the internal support in the section. The surrounding rock controlling effect of the support technology was significant.

2 Basic conditions of test roadway

The second level in Yunjialing coal mine refer to −150 to −450 m in depth respectively. The south wing rail roadway is 650–750 m deep and 850 m long. The strata in this roadway basically include carbonaceous mudstone, sand- mudstone, and fine sandstone with developed joints. Since these strata are vulnerable to bulking deformation, the roadway exhibits a poor overall stability. Figure 1 is a histogram of the surrounding rocks on the two levels.

Fig. 1
figure 1

Histogram of the surrounding rocks

The roadway in this study was originally supported using bolt-beam-mesh-cable. The bolt used the screw-thread steel bolt spaced by 800 mm × 700 mm and connected by #14 steel ladder beam; the specification of top cable was 17.8 mm × 8000 mm, while the side cable was 17.8 mm × 4500 mm; the tray of the bolt was 10 mm × 100 mm × 100 mm, while that of the cable was 10 mm × 300 mm × 300 mm; the steel bar mesh was welded using 8 steel. During the construction, the bolt and cable were applied with a pretension force of 80 and 100 kN, respectively. I-steel was used to strengthen the support on local crushing area. The roadway was completed on September 2008 and experienced two maintenances subsequently. However, the roadway is still in large deformation, which is beyond the normal use.

3 Deformation and failure characteristics of roadway with high stress and soft rocks

3.1 Support failure

The roadway was completed on December 2008. However, most of roadway was repaired for twice 1 year later. Through field observation and geological condition analysis, the deformation and failure law of the roadway was concluded as follows:

  1. (1)

    The surrounding rocks show fierce deformation, poor stability, and high ground stress. Shortly after the excavation and the two maintenances, the arch angle of the roadway deformed greatly and even the surrounding rocks tend to be instable. Figure 2 illustrates the roadway failure effect.

    Fig. 2
    figure 2

    Failure of roadway surrounding rocks. a Failure of the roadway. b Failure of the wall

  2. (2)

    The surrounding rocks are rheological. The mine pressure observation after the two maintenances suggest that the surrounding rocks from the surface to the depth of 8 m moved significantly. Moreover, after the roadway maintenances, the roadway movements spent 80 days to turn stable. The roof and floor of the roadway had a deformation of 560 mm on average, while the two sides converged by 890 mm on average. The deformation of the two sides exceeded the deformation of roof and floor in this roadway.

3.2 The causes for roadway deformation

  1. (1)

    The complex geological conditions. The south wing rail roadway passes through several strata, including mudstone, san-mudstone, fine sandstone, and coal seam. The ground stresses of two holes were measured by using the stress relieving method in the substation of the mining area at two levels. The maximum principal stresses are 19 and 18.52 MPa respectively; while the minimum principal stresses are 9.12 and 8.63 MPa; the intermediate principal stresses are 16.25 and 15.67 MPa, respectively. Both the maximum and minimum principal stresses are horizontal principal stresses. The maximum principal stresses are at NE85.9 and NE87.1°. The intermediate principal stresses are vertical principal stresses in downward directions. So the roadway is in near south-north direction, with the maximum horizontal principal stress of 19 MPa in the near east–west direction. The axial direction of the roadway is approximately perpendicular to the maximum horizontal principal stress direction. This situation is unfavorable for the roadway maintenance.

  2. (2)

    The hydrophilic expansion of the surrounding rocks. The mineral compositions in the rocks, such as kaolinite and montmorillonite, were in high contents. In case of water accumulating in the roadway during roadway repairment, the deformation of corresponding position would be intensified and expanded. These components contain amounts of expansive clay minerals, which have poor water stability and are liable to weathering and deliquescence.

  3. (3)

    The anchorage structure fails to form the active bearing as soon as possible. The key for the active control of the soft roadway support is to improve the residual strength of loose rocks to give full play to the active bearing capacity of the surrounding rocks. Mine pressure observation shows that the cable can achieve a pretension of 100 kN, while the bolt has a pretension force of 30–40 kN generally. Therefore, the shallow anchoring structure formed by bolt and surrounding rocks present insufficient active bearing capacity. Moreover, the cable support is generally lagged behind of heading end by certain distance. The anchoring structure formed by the bolt, cable, the surrounding rocks fail to control intense surrounding rock deformation due to the insufficient overall active bearing capacity at the initial stage of the excavation. Therefore, serious deformation of the surrounding rocks appears and calls for repeated maintenances.

  4. (4)

    The overall uneven stressing of bolt and cable. The stressing of bolt and cable on the spandrel of the roadway is as high as 85 % of breaking force. While the stresses on the bolt and cable on other positions are merely 50 % of the breaking force.

Figure 3 illustrates the stress distribution of traditional bolt-mesh supporting and equalized yielding support, as well as the stress states of bolts and cables. It can be found that there was little difference in the stress distribution of roadway surrounding rock by using these two supporting schemes, except that the uneven high-stress zone formed in the deep roadway floor. However, there were great difference being found in the stress states of bolts and cables. The stress of the bolts in the whole section of the roadway with traditional bolt-mesh supporting was uneven, where the stress of the vault of roadway was great, and that of the two sides of roadway and floor bolt was small. In terms of the stress state of cables, it reflected that the stress of cables at the shallow section was great, while that of the cables at the deep section was small. On the contrary, the stress of bolts and cables in the roadway with equalized yielding support was relatively even. It suggested that the stress of bolts and cables in the section was more even and reasonable after yielding to reduce the fractures of local bolts and cables.

Fig. 3
figure 3

The contrast of traditional bolt-mesh supporting and equalized yielding support. a Traditional bolt support of roadway. b Qualized yielding support of roadway

4 Equalized yielding pressure support technology for roadway with high stress and soft rocks

4.1 Equalized yielding support theory

The support of the soft-rock roadway in the deep mine are likely to be stressed unevenly. The bolt-mesh-cable coupling can eliminate the nonuniform stressing condition of the support structure through the coupling of the bolt mesh and surrounding rocks. The coupling way coordinates the deformation of the surrounding rocks and realizes the integration of the supporting and the uniform distribution of the load. Finally, the stability of the surrounding rocks can be achieved. The support of the soft-rock roadway in the deep mine is basically characterized the coupling of the strength and rigidity of the surrounding rocks with the support, as shown in Fig. 4 (Ren 2010; Lu et al. 2011).

Fig. 4
figure 4

Coupling support theory

The mechanism of equalized yielding support is as follows: due to the redistribution of stress, the stress concentrated at part of roadway after the excavation and support of roadway. Meanwhile, the surrounding rocks deformed sharply so that the stress of the bolts and cables at this part increased. Once the stress reached the yielding limit of bolts and cables, they yielded through the deformation of yield rings. At the same time, the high stress of surrounding rock gradually transferred to the neighboring bolts and cables. When the bolts and cables reached the yielding limit, they yielded immediately so that the high stress of surrounding rock passed on to the bolts and cables around. The process cycled in this way until the deformation of roadway surrounding rock stabilized. Thereby, the stress of bolts and cables was even, as seen in Fig. 5.

Fig. 5
figure 5

Evolution model of qualized yielding support of roadway. a Initial stage of bolt support of roadway. b Yielding pressure stage of local roadway. c Equalized pressure of bolts and cables of whole roadway

4.2 Equalized yielding support plan

Basing on the characteristics and causes of the deformation and failure of the roadway, the support technology in this study aims to control the local violent deformation, improve the overall bearing ability of the support structure, and realize the equalized stress on the support. The bolt with high strength and cable bearing high pretension force were used to bear the pressure on the anchoring structure. Moreover, yielding ring was employed to realize the uniform stress on the support components. The secondary grouting in the surrounding rocks can further improve the self-bearing ability of the surrounding rocks and thus to keep the stability of the roadway constantly. Figures 6 and 7 show the section of the supporting way, and the yielding ring respectively.

Fig. 6
figure 6

Support parameter of roadway. a The first support. b The second reinforcing-grouting

Fig. 7
figure 7

Yelding ring and auxiliary components of bolts and cables

(1) First support.

The bolt with ultra-high strength of 20 mm × 2800 mm, lengthening anchorage length of 1400 mm, pretension force of 80 kN, and tensile strength of 250 kN was used. The protective metal mesh was in specification of 6.5 mm × 100 mm × 80 mm. The bolts were connected using the reinforced bar ladder beam of 14 mm. The tray was a square high-strength plate in size of 200 mm × 200 mm × 10 mm and strength of 280 kN above. The bolts were spaced by 800 mm × 800 mm.

The roof is supported by the nest bolt of 18.9 mm × 8000 mm; the two sides were supported using nest cables of 18.9 mm × 4500 mm, with anchorage of 2.2 m long and pretension force of 100 kN; the tray for the anchor rope was the spheroidal stray of 300 mm × 300 mm × 12 mm with high-strength. The cables were spaced by 1810 mm × 1600 mm.

The pressure yielding pipe was prepared by the thread steel with high strength. The anchor yielding ring is 20 mm long; the pressure yielding pipe of the anchor cable is 30 mm in length. And the yielding values of the anchor bolt and the anchor cable are designed to be 15 and 18 tonnes, respectively. If yielding ring is used in coal roadway, the length of the yielding ring needs to be properly increased according to the measured value of surrounding rock deformation in the field roadway so as to adapt to the deformation.

(2) Second reinforcing-grouting in the surrounding rocks.

The grouting anchor rode was 2000 mm long. The bolt for base angle grouting was 3000 mm long and spaced by 1350 mm × 1600 mm. The grouting in the surrounding rocks was implemented after the first support. #525 portland cement and ACZ-I cement grout additive were utilized as grouting material. The amount of additive is 8 % of that of cement; water cement ratio is 2:1; the grouting pressure is controlled at 3–5 MPa. The grouting amount is determined by considering three perspectives: the grouting requires to be ceased in the cases when grouting pressure reaches 3–5 MPa, or the cement more than two bags is grouted. The grouting also has to be stopped when cement leakage occurs in the rear grouting pipe or the zone around the grouting hole in the grouting process.

4.3 Numerical simulation on the equalized yielding support

According to the geological conditions of the south rail roadway on second level, a numerical model of 50 m × 50 m × 50 m (length × width × height) was established using FLAC3D numerical simulation software. The sides and bottom of the model were set with limited displacement boundary. The upper surface of the model was free boundary and was applied with the vertical load of 19 MPa. The bolts and cables were simulated using cable unit. Section 4.2 shows the support parameters. The simulation steps include excavation, support, and grouting. Given the role that grouting played in improving the strength of surrounding rock, so simulation grouting was realized by improving the cohesion force and friction angle of surrounding rock.

As seen in Fig. 8, in the case of using equalized yielding support plan, the roof and floor are shown a cumulative deformation of 6 cm, while the two sides show a cumulative deformation of 10 cm. The large deformation of the roof and bottom are mainly observed in vault and the shallow surrounding rocks within 1.5 m of the roadway. By reinforcing, roadway floor show smaller deformation and deformation influencing area. The large deformation on the two sides of the roadway is concentrated on the stringcourse of the roadway. Moreover, the influences of horizontal deformation in the surrounding rocks are larger than that of the roof and floor.

Fig. 8
figure 8

Deformation of qualized yielding support of roadway

As shown in Fig. 9, the horizontal stress concentration of the surrounding rocks in the roadway mainly distributes in the deep surrounding rocks of the roof and floor of the roadway. The maximum horizontal stress is 4 m away from the roof. The stress in the roadway maximizes at 35.82 MPa, with a stress concentration coefficient of 1.36. The vertical stress concentration area of the surrounding rocks of the roadway is mainly in the slope angel on the middle-to-low part of the two sides, with a maximum stress of 26.76 MPa and the stress concentration coefficient of 1.53. Especially, the concentration of the vertical stress on the two slope angles of the roadway requires to be given priority in the making controlling measures. In case of the deformation and failure, grouting needs to be applied in time. In addition, the bolt and cable are under the stress of 136 and 204 kN, respectively, which are both in the stressing ranges of them. The grouting reinforces the strength of the surrounding rocks in the roadway. The shallow surrounding rocks are in high strength and are conductive to maintain the stability of the roadway. Therefore, the equalized yielding support plan proposed is proved to be effective.

Fig. 9
figure 9

Stress distribution of qualized yielding support of roadway

Figure 10 shows the deformation of roadway by traditional bolt-mesh supporting. It is obvious that the roadway surrounding rock deformed greatly owing to the unreasonable support parameters and without reinforcing the surrounding rocks by grouting. The subsidence of the roadway roof was up to 60.67 cm and the floor heave was 18.12 cm. In addition, the maximum deformation occurred at the waist line of the two sides of roadway with accumulative deformation of 83.68 cm. It can be known that the deformation of the roadway with traditional bolt-mesh supporting was greater than that of the roadway by equalized yielding support.

Fig. 10
figure 10

Deformation of traditional bolt support of roadway

5 Field industrial test and analysis on test results

The exampled roadway was repaired by using equalized yielding support plan. The test roadway was 200 m long. In field, the roadway section was firstly repaired so as to meet the requirements of the designed section. Then, the first support was applied. Five days later, the secondary grouting reinforcement was conducted.

5.1 Displacement on the roadway surface

The displacement of the surrounding rocks after maintenance is shown in Fig. 11. It can be seen that the deformation of the surrounding rocks attenuates rapidly and tends to be stable 26 days later. After the roadway deformation tends to be stable, the two sides, and roof and floor move close by 161 and 42 mm respectively. This technology controls the deformation of the surrounding rocks in the deep roadway with high stress and soft rocks and ensures the stability of the surrounding rocks in the roadway.

Fig. 11
figure 11

Deformation of roadway

5.2 Stressing analysis on the anchor rod and anchor rope

Figure 12 shows the stress variations of the bolt and cable. Before the secondary grouting reinforcement, the stresses on the bolt and cable increase rapidly. The stresses on the supports in the section are sequenced in a decreasing order: spandrel > vault > two sides. The yielding ring fails to shift the pressure. After grouting, the stress on the support grows slowly. Three days later after the grouting, the cable on the spandrel shifts the stress to the vault. The bolt on the vault functions on the 6th day after the grouting. The cable on the spandrel begins to convert the stress on the 5th day after the grouting to the vault. The cable on the vault functions on the 6th day after the grouting. Thirty days after the roadway maintenance, the stress on the support basically is constant. The stress on the cable lies in 176–191 kN, while that on the bolt is in 125–137 kN. The stresses on the bolt and cable on the both sides are both lower than yielding values.

Fig. 12
figure 12

Force of bolts and cables

6 Conclusions

  1. (1)

    The serious deformation of the south wing rail roadway mainly results from the high stress environment, the perpendicular roadway axis direction of the roadway to the maximum horizontal principal stress, the high-content swelling mineral(such as kaolinite) in the rocks, and the poor self-stabilization ability of the surrounding rocks etc.

  2. (2)

    According to the pressure law of the roadway, this study integrated the equalized yielding support with the grouting reinforcement and used a bolt-mesh-cable + anchor grouting support technology.

  3. (3)

    The roof and both sides of the roadway deformed by 42 mm and 161 mm respectively; in the section, the bolt and cable were uniformly stressed in the normal working state. The deformation of the surrounding rocks in the roadway could be controlled effectively.