Abstract
The most important goals pursued by the automotive industry for a long time are the quality and the delivery time. In order to ensure that such premises are fulfilled, it is necessary that these companies have machines with fast production cycles and versatile layouts, able to adapt to the production of a large number of different parts. At the same time, for some production lines to spend the shortest possible time, it is necessary that there are devices able to quickly perform the transposition from one stage of production to the next one, freeing operators to more attractive and personalized tasks. Thus, simultaneously it is possible to reach higher production cadences, with the corresponding financial gains, as well as an increase in workers motivation, which will be more productive. In this work, a novel concept of interconnection system between different manufacturing processes is presented in order to overcome the usual waste of time. Moreover, it is intended to show that, by replacing some robotized operation by cheaper automatic systems, it is possible to reduce the cycle time and improve the quality of the parts delivery from one operation to the next one. A case study is also presented corroborating this idea and showing how this principle can be applied in the field. The case study intends to show a novel device able to link the wire bending process and the further stage, the polymer over-injection process, in cushions and suspension mats for automotive seats.
Similar content being viewed by others
References
Antoniolli I, Guariente P, Pereira T, Pinto Ferreira L, Silva FJG (2017) Standardization and optimization of an automotive components production line. Procedia Manuf 13:1120–1127. https://doi.org/10.1016/j.promfg.2017.09.173
Guariente P, Antoniolli I, Pinto Ferreira L, Pereira T, Silva FJG (2017) Implementing autonomous maintenance in an automotive components manufacturer. Procedia Manuf 13:1128–1134. https://doi.org/10.1016/j.promfg.2017.09.174
Hu SJ (2013) Evolving paradigms of manufacturing: from mass production to mass customization and personalization. Procedia CIRP 7:3–8. https://doi.org/10.1016/j.procir.2013.05.002
Michalos G, Makris S, Papakostas N, Mourtzis D, Chryssolouris G (2010) Automotive assembly technologies review: challenges and outlook for a flexible and adaptive approach. CIRP J Manuf Sci Technol 2:81–91. https://doi.org/10.1016/j.procir.2016.11.109
Staats BR, James D, Upton DM (2011) Lean principles, learning and knowledge work: evidence from a software services provider. J Oper Manag 29(5):376–390. https://doi.org/10.1016/j.jom.2010.11.005
Costa RJS, Silva FJG, Campilho RDSG (2017) A novel concept of agile assembly machine for sets applied in the automotive industry. Int J Adv Manuf Technol 91(9–12):4043–4054. https://doi.org/10.1007/s00170-017-0109-4
Holweg M (2008) The evolution of competition in the automotive industry. In: Glenn P, Graves AP (eds) Build to order: the road to the 5-day car. Springer, Berlin, pp 13–34. ISBN 978-1-84800-225-8
Larsson A (2002) The development and regional significance of the automotive industry: supplier parks in western Europe. Int J Urb Reg Res 26(4):767–784. https://doi.org/10.1111/1468-2427.00417
Shah R, Ward PT (2007) Defining and developing measures of lean production. J Oper Manag 25(4):785–805. https://doi.org/10.1016/j.jom.2007.01.019
Yang MG, Hong P, Modi SB (2011) Impact of lean manufacturing and environmental management on business performance: an empirical study of manufacturing firms. Int J Prod Econ 129(2):251–261. https://doi.org/10.1016/j.ifacol.2016.07.552
Eroglu C, Hofer C (2011) Lean, leaner, too lean? The inventory-performance link revisited. J Oper Manag 29(4):356–369. https://doi.org/10.1016/j.jom.2010.05.002
Scherrer-Rathje M, Boyle TA, Deflorin P (2009) Lean, take two! Reflections from the second attempt at lean implementation. Bus Horiz 52(1):79–88. https://doi.org/10.1016/j.bushor.2008.08.004
Losonci D, Demeter K, Jenei I (2011) Factors influencing employee perceptions in lean transformations. Int J Prod Econ 131(1):30–43
Araújo LMB, Silva FJG, Campilho RDSG, Matos JA (2017) A novel dynamic holding system for thin metal plate shearing machines. Robot Comput Integr Manuf 44:242–252. https://doi.org/10.1016/j.rcim.2016.06.006
Treville S, Shapiro RD, Hameri AP (2004) From supply chain to demand chain: the role of lead time reduction in improving demand chain performance. J Oper Manag. https://doi.org/10.1016/j.jom.2003.10.001
Salvador F, Forza C, Rungtusanatham M (2002) Modularity, product variety, production volume, and component sourcing: theorizing beyond generic prescriptions. J Oper Manag 20(5):549–575. https://doi.org/10.1016/S0272-6963(02)00027-X
Sullivan WG, McDonald TN, Van Aken EM (2002) Equipment replacement decisions and lean manufacturing. Robot Comput Integr Manuf 18(3–4):255–265. https://doi.org/10.1016/S0736-5845(02)00016-9
Mishina K (1995) Toyota motor manufacturing, U.S.A., Inc. vol 2(3)
Li J, Nakano M, Cai W, Furmans K, Patchong A (2010) Guest editorial: automation in automotive manufacturing. IEEE Trans Autom Sci Eng 7(4):721–723. https://doi.org/10.1109/TASE.2010.2051510
Groover MP (2000) Automation, production systems, and computer-integrated manufacturing, 2nd edn. Prentice Hall, New Jersey. ISBN 0-13-239321-2
Rizzoni G (2005) Introduction to electrical engineering. In: Principles and applications of electrical engineering, McGraw-Hill. Cap. 1, pp 1–8. ISBN: 0-07-322033-7
Nunes PMS, Silva FJG (2013). Increasing flexibility and productivity in small assembly operations: a case study In: Azevedo A (ed) Advances in sustainable and competitive manufacturing systems 23rd international conference on flexible automation and intelligent manufacturing, Springer, Switzerland, pp 329–340. https://doi.org/10.1007/978-3-319-00557-7_27
Ford M (2009) The lights in the tunnel: automation, accelerating technology and the economy of the future. Acculant Publishing, USA. ISBN 1-4486-5981-7
Abreu P (2002). Robótica Industrial M.Sc. thesis, Faculty of Engineering, University of Porto, Porto. (in Portuguese)
Wise E (2005) Robotics demystified. McGraw-Hill, New York. ISBN 0-07-143678-2
Araújo WFS, Silva FJG, Campilho RDSG, Matos JA (2017) Manufacturing cushions and suspension mats for vehicle seats: a novel cell concept. Int J Adv Manuf Technol 90:1539–1545. https://doi.org/10.1007/s00170-016-9475-6
Costa MJR, Gouveia RM, Silva FJG, Campilho RDSG (2017) How to solve quality problems by advanced fully-automated manufacturing systems. Int J Adv Manuf Technol. https://doi.org/10.1007/s00170-017-0158-8
Moreira BMDN, Gouveia RM, Silva FJG, Campilho RDGS (2017) A novel concept of production and assembly processes integration. Procedia Manuf 11:1385–1395. https://doi.org/10.1016/j.promfg.2017.07.268
Lavvafi H, Lewandowski JR, Lewandowski JJ (2014) Flex bending fatigue testing of wires, foils, and ribbons. Mater Sci Eng A 601:123–130. https://doi.org/10.1016/j.msea.2014.02.015
Gupta Shikha, Pelton Alan R, Weaver Jason D, Gong Xiao-Yan, Nagaraja Srinidhi (2015) High compressive pre-strains reduce the bending fatigue life of nitinol wire. J Mech Behav Biomed Mater 44:96–108. https://doi.org/10.1016/j.jmbbm.2014.12.007
Zhang D, Feng C, Chen K, Wang D, Ni X (2017) Effect of broken wire on bending fatigue characteristics of wire ropes. Int J Fatigue 103:456–465. https://doi.org/10.1016/j.ijfatigue.2017.06.024
Pal U, Mukhopadhyay G, Sharma A, Bhattacharya S (2018) Failure analysis of wire rope of ladle crane in steel making shop. Int J Fatigue 116:149–155. https://doi.org/10.1016/j.ijfatigue.2018.06.019
Cao X, Wu W (2018) The establishment of a mechanics model of multi-strand wire rope subjected to bending load with finite element simulation and experimental verification. Int J Mech Sci 142–143:289–303. https://doi.org/10.1016/j.ijmecsci.2018.04.051
Bonneric M, Aubin V, Durville D (2018) Finite element simulation of a steel cable—rubber composite under bending loading: influence of rubber penetration on the stress distribution in wires. Int J Solids Struct. https://doi.org/10.1016/j.ijsolstr.2018.10.023
Rosa C, Silva FJG, Ferreira LP (2017) Improving the quality and productivity of steel wire-rope assembly lines for the automotive industry. Procedia Manuf 11:1035–1042. https://doi.org/10.1016/j.promfg.2017.07.214
Rosa C, Silva FJG, Ferreira LP, Campilho R (2017) SMED methodology: the reduction of setup times for Steel Wire-Rope assembly lines in the automotive industry. Procedia Manuf 13:1034–1042. https://doi.org/10.1016/j.promfg.2017.09.110
Rosa C, Silva FJG, Ferreira LP, Pereira T, Gouveia R (2018) Establishing standard methodologies to improve the production rate of assembly lines used for low added-value products. Procedia Manuf 17:555–562. https://doi.org/10.1016/j.promfg.2018.10.096
NR 10: 2004 standard—Segurança em Instalações e Serviços em Electricidade. http://www.ccb.usp.br/arquivos/arqpessoal/1360237189_nr10atualizada.pdf. Accessed 26 Feb 2018
NR 12: 2016 standard—machinery and work equipment safety. http://www.braziliannr.com/brazilian-regulatory-standards/nr12-machinery-and-work-equipment-safety/. Accessed 26 Feb 2018
Acknowledgements
The authors wish to thank Mr. Mário Cardoso from PR METAL, Lda., for his collaboration and commitment in providing the necessary data when this project started, giving the necessary inputs every time they were needed during the case study development.
Author information
Authors and Affiliations
Corresponding author
Additional information
Technical Editor: Fernando Antonio Forcellini, Dr.
Rights and permissions
About this article
Cite this article
Magalhães, A.J.A., Silva, F.J.G. & Campilho, R.D.S.G. A novel concept of bent wires sorting operation between workstations in the production of automotive parts. J Braz. Soc. Mech. Sci. Eng. 41, 25 (2019). https://doi.org/10.1007/s40430-018-1522-9
Received:
Accepted:
Published:
DOI: https://doi.org/10.1007/s40430-018-1522-9