Skip to main content
Log in

Evaluating Project Managers by an Interval Decision-Making Method Based on a New Project Manager Competency Model

  • Research Article - Systems Engineering
  • Published:
Arabian Journal for Science and Engineering Aims and scope Submit manuscript

Abstract

Selecting the competent project manager is one of the key factors for project success. This paper focuses on two main objectives: (1) presenting a project manager competency model in three dimensions of knowledge, performance and behavioral competency criteria and (2) proposing a proper interval decision-making method for evaluating project managers and selecting the competent project manager based on the presented competency model. The proposed evaluation method utilizes a goal programming technique to calculate interval weights of criteria and uses TOPSIS technique with interval weights and judgment data to rank candidate project managers and select the best of them.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Project Management Institute (PMI): A Guide to the Project Management Body of Knowledge, 4th edn. Newtown Square, PA (2008)

  2. Müller, R.; Turner, R.: Leadership competency profiles of successful project managers. Int. J. Project Manage. 28(5), 437–448 (2010)

    Article  Google Scholar 

  3. Gaddis, P.O.: The project manager. In: Augustine, N.R. (ed.) Managing Projects and Programs, pp. 145–162. Harvard Business School Press, Boston (1959)

  4. Archibald, R.D.: Managing High-Technology Programs and Projects. Wiley, New York (1975)

    Google Scholar 

  5. Einsiedel, A.J.A.: Profile of effective project managers. Project Manage. J. 18(5), 51–53 (1987)

    Google Scholar 

  6. Posner, B.Z.: What it takes to be a good project manager. Project Manage. J. 18(1), 51–53 (1987)

    Google Scholar 

  7. Thamhain, H.J.: Developing project management skills. Project Manage. J. 22(3), 39–45 (1991)

    Google Scholar 

  8. Pettersen, N.: Selecting project managers: an integrated list of predictors. Project Manage. J. 22(2), 21–26 (1991)

    MathSciNet  Google Scholar 

  9. Crawford, L.: Senior management perceptions of project management competence. Int. J. Project Manage. 23(1), 7–16 (2005)

    Article  Google Scholar 

  10. Suikki, R.; Tromstedt, R.; Haapasalo, H.: Project management competence development framework in turbulent business environment. Technovation 26(5–6), 723–738 (2006)

    Article  Google Scholar 

  11. Wu, W.W.; Lee, Y.T.: Developing global managers’ competencies using the fuzzy DEMATEL method. Expert Syst. Appl. 32(2), 499–507 (2007)

    Article  Google Scholar 

  12. Ahadize, D.K.; Proverbs, D.G.; Olomolaiye, P.: Towards developing competency-based measures for construction project managers: should contextual behaviours be distinguished from task behaviours? Int. J. Project Manage. 26(6), 631–645 (2008)

    Article  Google Scholar 

  13. Patanakul, P.; Milosevic, D.: A competency model for effectiveness in managing multiple projects. J. High Technol. Manage. Res. 18(2), 118–131 (2008)

    Article  Google Scholar 

  14. Liu, J.; Chen, H.; Jiang, J.J.; Klein, G.: Task completion competency and project management performance: the influence of control and user contribution. Int. J. Project Manage. 28(3), 220–227 (2010)

    Article  Google Scholar 

  15. Shahhosseini, V.; Sebt, M.H.: Competency-based selection and assignment of human resources to construction projects. Sci. Iranica Trans. A Civil Eng. 18(2), 163–180 (2011)

    Article  Google Scholar 

  16. Australian Institute of Project Management (AIPM): National competency standards for Project management. Split Junction, NSW (1996)

  17. Australian Institute of Project Management (AIPM): Professional Competency Standards for Project Management (PCSPM). Split Junction, NSW (2008)

  18. Boston University Corporate Education Center: Project Management Competency Model. http://www.butrain.com/mdp/CompModel.asp (2003)

  19. International Project Management Association (IPMA): IPMA Competency Baseline, 3rd edn. Netherlands (2006)

  20. Project Management Institute: Project Manager Competency Development Framework, 2nd edn. Project Management Institute (PMI), Newtown Square, PA (2007)

  21. Parry, S.B.: Just what is competency? (And why should you care?). Training 35(6), 58–64 (1998)

    Google Scholar 

  22. Spencer, L.M.; Spencer, S.M.: Competency at Work: Models for Superior Performance. Wiley, New York (1993)

  23. Hong-hua, X.; Yan-hua, W.: Training system design for middle-level manager in coal enterprises based on post competency model. In: The 6th International Conference on Mining Science & Technology, Procedia Earth and Planetary Science, pp. 1764–1771 (2009)

  24. Amiri, M.; Zandieh, M.; Vahdani, B.; Yazdani, M.; Soltani, R.: A Hybrid MCDM model with interval weights and data for convention site selection. J. Appl. Sci. 8(15), 2678–2686 (2008)

    Article  Google Scholar 

  25. Wang, Y.M.; Elhag, T.M.S.: A goal programming method for obtaining interval weights from an interval comparison matrix. Eur. J. Oper. Res. 177(1), 458–471 (2007)

    Article  MATH  Google Scholar 

  26. Wang, Y.M.; Yang, J.B.; Xu, D.L.: Interval weight generation approaches based on consistency test and interval comparison matrices. Appl. Math. Comput. 167(1), 252–273 (2005)

    Article  MATH  MathSciNet  Google Scholar 

  27. Jahanshahloo, G.R.; Hosseinzadeh Lotfi, F.; Izadikhah, M.: An algorithmic method to extend TOPSIS for decision-making problems with interval data. Appl. Math. Comput. 175(2), 1375–1384 (2006)

    Article  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mehdi Yazdani.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Sadeghi, H., Mousakhani, M., Yazdani, M. et al. Evaluating Project Managers by an Interval Decision-Making Method Based on a New Project Manager Competency Model. Arab J Sci Eng 39, 1417–1430 (2014). https://doi.org/10.1007/s13369-013-0631-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13369-013-0631-0

Keywords

Navigation