Skip to main content
Log in

Risk and reliability assessment for electrical distribution systems and impacts of regulations with examples from Sweden

  • Research Article
  • Published:
International Journal of Systems Assurance Engineering and Management Aims and scope Submit manuscript

Abstract

The introduction of performance based tariff regulations, and higher media and political pressure have increased the need for well-performed asset management in the operation and planning of electrical distribution systems. In this paper quantitative reliability assessment methods are proposed as a tool to meet these new incentives. Electrical distribution systems have compared to other technical systems several special characteristics which are important to take into consideration when introducing reliability analysis methods. Moreover, the paper gives a brief discussion on the effects and the importance of customer participation in improving system reliability by providing additional system operating reserve from the market perspective. Finally, the paper discusses the reliability analysis with the reliability test systems, and stresses the usefulness of generally known test systems for such assessments. The ideas of future work on development of these test systems to address the changing power systems are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3

Similar content being viewed by others

References

  • Allan R, Billinton R, Sjarief I, Goel L, So KS (1991) A reliability test system for educational purposes—basic distribution system data and results. IEEE Trans Power Syst 6(2):813–820

    Article  Google Scholar 

  • Andersson G et al (2005) Causes of the 2003 major grid blackouts in North America and Europe, and recommended means to improve system dynamic performance. IEEE Trans Power Syst 20(4):1922–1928

    Article  Google Scholar 

  • Arnold N, Tuan LA (2006) Interruptible load and demand response: worldwide picture and the situation in Sweden. 38th IEEE North American power symposium, SIU Carbondale, Illinois, September

  • Bertling L (2002) Reliability-centered maintenance for electric power distribution systems. Doctoral thesis, Royal Institute of Technology (KTH), School of Electrical Engineering, ISBN 91-7283-345-9, Stockholm

  • Bertling L, Larsson M, Wallnerström CJ (2005) Evaluation of the customer value of component redundancy in electrical distribution systems. IEEE PowerTech, St. Petersburg

    Google Scholar 

  • Billinton R (2004) Historic performance-based distribution system risk assessment. IEEE Trans Power Syst 19:1759–1765

    Article  Google Scholar 

  • Billinton R, Allan R (1996) Reliability evaluation of power systems, 2nd edn. Plenum, New York

    Google Scholar 

  • Billinton R, Jonnavithula S (1996) A test system teaching overall power system reliability assessment. IEEE Trans Power Syst 11(4):1670–1676

    Article  Google Scholar 

  • Billinton R, Sankarakrishnan A (1994) Adequacy assessment of composite power systems with HVDC links using Monte Carlo simulations. IEEE Trans Power Syst 9(3)

  • CIGRE TF 38-02-08 (1995) Long term dynamics phase II

  • Cigré Working Group 601 of Study Committee C4 (2010) Review of the current status of tools and techniques for risk-based and probabilistic planning in power systems

  • Fritz P (2006) Market design project: demand response resources in Sweden—a summary. Elforsk rapport 06:41. http://www.elforsk.se/

  • IEEE Reliability Test System Task Force (1979) IEEE reliability test system. IEEE Trans PAS 98:2047–2054

    Google Scholar 

  • IEEE Reliability Test System Task Force (1999) The IEEE reliability test system-1996. A report prepared by the reliability test system task force of the application of probability methods subcommittee. IEEE Trans Power Syst 14(3):1010–1020

    Article  Google Scholar 

  • Janjic AD, Popovic DS (2007) Selective maintenance schedule of distribution network based on risk management approach. IEEE Trans Power Syst 22:597–604

    Article  Google Scholar 

  • Kwok S (1988, Nov) Reliability evaluation of distribution systems. Master of Science dissertation, Victoria University of Manchester

  • Larsson M (2005) The network performance assessment model. Licentiate Thesis, KTH, Stockholm, Sweden, TRITA-ICS-0501

  • Lindskoug S (2006) Demonstration project: consumer reactions to peak prices. Elforsk rapport 06:40. http://www.elforsk.se/

  • Mielczarski W et al (ed) (2005) Development of electricity markets. Lodz, ISBN 83-921636-2-1

  • Mielczarski W et al (ed) (2006) Complex electricity markets. Warsaw, ISBN 83-921636-7-2

  • Nilsson J, Bertling L (2007) Maintenance management of wind power systems using condition monitoring systems—life cycle cost analysis for two case studies. IEEE Trans Energy Convers 22(1):223–229

    Article  Google Scholar 

  • Nordgård DE (2010) Risk analysis for decision support in electricity distribution system asset management—methods and frameworks for analyzing intangible risks. Doctoral Thesis, Department of Electrical Power Engineering, Norwegian University of Science and Technology

  • OPSI (2005) The electricity (standards of performance) regulations 2005. ISBN 011072741X

  • Setréus J, Wallnerström CJ, Bertling L (2007) A comparative study of regulation policies for interruption of supply of electrical distribution systems in Sweden and UK. CIRED, Vienna

    Google Scholar 

  • The Swedish law for the electric power system, Chap 4, (“Ellagen”), (In Swedish) (1997:857), Sweden, including updates until 2010

  • Tuan LA, Bhattacharya K (2003) Competitive framework for procurement of interruptible load services. IEEE Trans Power Syst 18(2):889–897

    Article  Google Scholar 

  • Wallnerström CJ (2008) On risk management of electrical distribution systems and the impact of regulations. Licentiate Thesis, KTH, Sweden

  • Wallnerström CJ, Bertling L (2007) A sensitivity study of the Swedish network performance assessment model investigating the effects of changes in input data. CIRED, Vienna

    Google Scholar 

  • Wallnerström CJ, Bertling L (2008) Investigation of the Robustness of the Swedish network performance assessment model. IEEE Trans Power Syst 23(2):773–780

    Article  Google Scholar 

  • Wallnerström CJ, Bertling L (2009) Risk management applied to electrical distribution systems. CIRED, Prague

    Google Scholar 

  • Wallnerström CJ, Bertling L (2010) Laws and regulations of Swedish power distribution systems 1996–2010—Learning from novel approaches as less good experiences. Accepted to CIRED Workshop, Lyon, France

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Carl Johan Wallnerström.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Wallnerström, C.J., Bertling, L. & Tuan, L.A. Risk and reliability assessment for electrical distribution systems and impacts of regulations with examples from Sweden. Int J Syst Assur Eng Manag 1, 87–95 (2010). https://doi.org/10.1007/s13198-010-0017-6

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13198-010-0017-6

Keywords

Navigation