Abstract
Inventory Management and production planning are essential tasks for every company in the industry. Therefore, the development of a large set of Economic Order Quantity (EOQ) models is needed. In this paper, a Fuzzy Rough (Fu-Ro) multi-item Economic Production Quantity (EPQ) model is developed with constant demand, infinite production rate having flexibility and reliability consideration in production process and demand dependent unit production cost and shortages under the restrictions on storage area. Some of the inventory parameters are considered as trapezoidal fuzzy rough numbers and the model is formulated following cost minimization principle. Then by geometric programming (GP) technique we solve the problem. The model is illustrated through numerical example.
Similar content being viewed by others
References
Abou-el-ata, M.O., Kotb, K.AM.: Multi-item inventory model with varying holding cost under two restrictions: a geometric programming approach. Prod. Plan. Control. 8, 608–611 (1997)
Balkhi, Z.T., Foul, A.: A multi-item production lot size inventory model with cycle dependent parameters. Int. J. Mathe. Model. Meth. Appl. Sci. 3, 94–104 (2009)
Bjork, K.M., Carlsson, C.: The effect of flexible lead times on a paper producer. Int. J. Prod. Econ. 107, 139–150 (2007)
Bjork, K.M.: A multi-item fuzzy economic production quantity problem with a finite production rate. Int. J. Prod. Econ. 135, 702–707 (2012)
Cheng, T.C.E.: An economic order quantity model with demand dependent unit cost. Eur. J. Oper. Res. 39, 252–256 (1989)
Dubois, D., Prade, H.: Possibility theory: an approach to computerized processing of uncertainty. Plenum, New York (1988)
Dubois, D., Prade, H.: Fuzzy numbers: an overview, Analysis of Fuzzy Information 2, 3–39 (1988)
Dubois, D., Prade, H.: Rough fuzzy sets and fuzzy rough sets. Int. J. Gen. Syst. 17, 191–208 (1990)
Dubois, D., Prade, H.: Twofold fuzzy sets and rough setssome issues in knowledge representation. Fuzzy Sets Syst. 23, 3–18 (1987)
Duffin, R.J., Peterson, E.L., Zener, C.: Geometric programming. Wiley, New York (1967)
Hariri, A.M.A., Abou-el-ata, M.O.: Multi-item production lot-size inventory model with varying order cost under a restriction: a geometric programming approach. Prod. Plan. Control. 8, 179–182 (1997)
Hartley, R.: An existence and uniqueness theorem for an optimal inventory problem with forecasting Original Research Article. J. Math. Anal. Appl. 66, 346–353 (1978)
Morsi, N.N., Yakout, M.M.: Axiomatics for fuzzy rough sets. Fuzzy Sets Syst. 100, 327–342 (1998)
Islam, S., Roy, T.K.: A fuzzy EPQ model with flexibility and reliability consideration and demand dependent unit production cost under a space constraint: a fuzzy geometric programming approach. Appl. Math. Comput. 176, 531–544 (2006)
Islam, S., Roy, T.K.: Fuzzy multi-item economic production quantity model under space constraint: a geometric programming approach. Appl. Math. Comput. 184, 326–335 (2007)
Lee, H., Yao, J.S.: Economic production quantity for fuzzy demand quantity and fuzzy production quantity. Eur. J. Oper. Res. 109, 203–211 (1998)
Leung, K.N.F.: A generalized geometric programming solution to an economic production quantity model with flexibility and reliability considerations. Eur. J. Oper. Res. 176, 240–251 (2007)
Maity, K.: Possibility and necessity representations of fuzzy inequality and its application to two warehouse production-inventory problem. Appl. Math. Model. 35, 1252–1263 (2011)
Mandal, N.K., Roy, T.K., Maiti, M.: Inventory model of deteriorating items with a constraint: a geometric programming approach. Eur. J. Oper. Res. 173, 191–210 (2006)
Mondal, M., Maity, A.K., Maiti, M.K., Maiti, M.: A production-repairing inventory model with fuzzy rough coefficients under inflation and time value of money. Appl. Math. Model. 17, 26–48 (2012)
Shi, Y., Yao, L., Xu, J.: A probability maximization mode based on rough approximation and its application to the inventory problem. Int. J. Approx. Reason. 52, 261–280 (2011)
Taleizadeh, A.A., Sadjadi, S.J., Niaki, S.T.A.: Multiproduct EPQ model with single machine, backordering and immediate rework process. Eur. J. Ind. Eng. 5, 388–411 (2011)
Xu, J., Zhao, L.: A class of fuzzy rough expected value multi-objective decision making model and its application to inventory problems. Comput. Math. Appl. 56, 2107–2119 (2008)
Xu, J., Zhou, X.: Fuzzy link multiple-objective decision making. Springer-Verlag, Berlin (2009)
Xu, J., Zhao, L.: A multi-objective decision-making model with fuzzy rough coefficients and its application to the inventory problem. Inf. Sci. 180, 679–696 (2010)
Zadeh, L.A.: Fuzzy sets as a basis for a theory of possibility. Fuzzy Sets Syst. 1, 3–28 (1978)
Zadeh, L.A.: Toward a generalized theory of uncertainty (GTU) an outline. Inf. Sci. 172, 1–40 (2005)
Acknowledgment
Second author Dr. Kalipada Maity thanks Minor research Project (PSW- 092, 12/13) under UGC, Govt. of India.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Jana, D.K., Maity, K. & Roy, T.K. Multi-item production inventory model with fuzzy rough coefficients via geometric programming approach. OPSEARCH 50, 475–490 (2013). https://doi.org/10.1007/s12597-013-0122-9
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12597-013-0122-9