Skip to main content
Log in

Analyzing the Key Drivers of Contractors’ Temporary Competitive Advantage in the Competition of International High-speed Rail Projects

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

After temporary competitive advantage (TCA) being proposed, this concept has received a lot of attention from academia and industry. For international HSR contractors, how to form their TCA and win out over the competition for new projects is crucial, while only a few studies focus on this issue. This research aims to develop a TCA system that reflects the characteristics of high-speed rail (HSR) contractors in the corporation and project levels. At first, exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) was conducted to explore and examine the key drivers and their relationships with contractors’ TCA. The results revealed that experience-mining advantage was the most critical factor of the six common factors. Next, common factors were divided into three dimensions and discussed in-depth, including resource-based TCA (i.e., technical resource and social image) which had the highest significance, followed by performance-based TCA (experience-mining advantage and risk-controlling performance), and action-based TCA (i.e., funding strategy and organizational management). Finally, two case study projects were selected to investigate the competitive situation between CRH (China Railway High-speed) and Shinkansen (Japan) in the international HSR market. This study not only provides suggestions for contractors to improve their TCA in international HSR projects, but also contributes to the theoretical framework for the TCA theory.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Agnihotri, R. and Rapp, A. (2011). “Perspectives on competitive intelligence within business: A tactical tool for sales-people to gain a competitive advantage.” The Marketing Review, Vol. 11, No. 4, pp. 363–380, DOI: https://doi.org/10.1362/146934711x13210328715948.

    Google Scholar 

  • Albalate, D. and Bel, G. (2012). “High-speed rail: Lessons for policy makers from experiences abroad.” Public Administration Review, Vol. 72, No. 3, pp. 336–349, DOI: https://doi.org/10.1111/j.1540-6210.2011.02492.x.

    Google Scholar 

  • Alzahrani, J. I. and Emsley, M. W. (2013). “The impact of contractors’ attributes on construction project success: A post construction evaluation.” International Journal of Project Management, Vol. 31, No. 2, pp. 313–322, DOI: https://doi.org/10.1016/j.ijproman.2012.06.006.

    Google Scholar 

  • Aznar, B., Pellicer, E., Davis, S., and Ballesteros-Pérez, P. (2017). “Factors affecting contractor’s bidding success for international infrastructure projects in Australia.” Journal of Civil Engineering and Management, Vol. 23, No. 7, pp. 880–889, DOI: https://doi.org/10.3846/13923730.2017.1341955.

    Google Scholar 

  • Brentani, U. D. and Kleinschmidt, E. J. (2015). “The impact of company resources and capabilities on global new product program performance.” Project Management Journal, Vol. 46, No. 1, pp. 12–29, DOI: https://doi.org/10.1002/pmj.21470.

    Google Scholar 

  • Chan, L. L. M., Shaffer, M. A., and Snape, E. (2004). “In search of sustained competitive advantage: The impact of organizational culture, competitive strategy and human resource management practices on firm performance.” International Journal of Human Resource Management, Vol. 15, No. 1, pp. 17–35, DOI: https://doi.org/10.1080/0958519032000157320.

    Google Scholar 

  • Chang, T., Deng, X., Hwang, B. G., and Zhao, X. (2018). “Political risk paths in international construction projects: Case study from Chinese construction enterprises.” Advances in Civil Engineering, Vol. 2018, Article ID 6939828, pp. 1–11, DOI: https://doi.org/10.1155/2018/6939828.

    Google Scholar 

  • Chang, T., Deng, X., Zuo, J., and Yuan, J. (2017). “Political risks in Central Asian countries: Factors and strategies.” Journal of Management in Engineering, Vol. 34, No. 2, pp. 04017059, DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000588.

    Google Scholar 

  • Chen, S. F., Wang, S., and Chen, C. Y. (2012). “A simulation study using EFA and CFA programs based the impact of missing data on test dimensionality.” Expert Systems with Applications, Vol. 39, No.4, pp. 4026–4031, DOI: https://doi.org/10.1016/j.eswa.2011.09.085.

    MathSciNet  Google Scholar 

  • Cottrell, D. S. (2006). “Contractor process improvement for enhancing construction productivity.” Journal of Construction Engineering & Management, Vol. 132, No. 2, pp. 189–196, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(189).

    Google Scholar 

  • D’Aveni, R. A., Dagnino, G. B., and Smith, K. G. (2010). “The age of temporary advantage.” Strategic Management Journal, Vol. 31, No. 13, pp. 1371–1385, DOI: https://doi.org/10.1002/smj.897.

    Google Scholar 

  • Deng, X., Low, S. P., Li, Q., and Zhao, X. (2014). “Developing competitive advantages in political risk management for international construction enterprises.” Journal of Construction Engineering and Management, Vol. 140, No. 9, pp. 1–10, DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000836.

    Google Scholar 

  • Derfus, P. J., Maggitti, P. G., Grimm, C. M., and Smith, K. G. (2008). “The red queen effect: Competitive actions and firm performance.” Academy of Management Journal, Vol. 51, No. 1, pp. 61–80, DOI: https://doi.org/10.5465/amj.2008.30708624.

    Google Scholar 

  • Doloi, H., Iyer, K. C., and Sawhney, A. (2011). “Structural equation model for assessing impacts of contractor’s performance on project success.” International Journal of Project Management, Vol. 29, No. 6, pp. 687–695, DOI: https://doi.org/10.1016/j.ijproman.2010.05.007.

    Google Scholar 

  • Du, S., Bhattacharya, C. B., and Sen, S. (2011). “Corporate social responsibility and competitive advantage: Overcoming the trust barrier.” Management Science, Vol. 57, No. 9, pp. 1528–1545, DOI: https://doi.org/10.1287/mnsc.1110.1403.

    Google Scholar 

  • Engwall, M. and Jerbrant, A. (2003). “The resource allocation syndrome: The prime challenge of multi-project management?” International Journal of Project Management, Vol. 21, No. 6, pp. 403–409, DOI: https://doi.org/10.1016/s0263-7863(02)00113-8.

    Google Scholar 

  • Floyd, F. J. and Widaman, K. F. (1995). “Factor analysis in the development and refinement of clinical assessment instruments.” Psychological Assessment, Vol. 7, No. 3, pp. 286–299, DOI: https://doi.org/10.1037/1040-3590.7.3.286.

    Google Scholar 

  • Ghapanchi, A. H., Wohlin, C., and Aurum, A. (2014). “Resources contributing to gaining competitive advantage for open source software projects: An application of resource-based theory.” International Journal of Project Management, Vol. 32, No.1, pp. 139–152, DOI: https://doi.org/10.1016/j.ijproman.2013.03.002.

    Google Scholar 

  • Glass, A. J. and Saggi, K. (2010). “Multinational firms and technology transfer.” Social Science Electronic Publishing, Vol. 104, No. 4, pp. 495–513, DOI: https://doi.org/10.1111/1467-9442.00298.

    Google Scholar 

  • Green, Jr., K. W., Whitten, D., and Inman, R. A. (2008). “The impact of logistics performance on organizational performance in a supply chain context.” Supply Chain Management: An International Journal, Vol. 13, No. 4, pp. 317–327, DOI: https://doi.org/10.1108/13598540810882206.

    Google Scholar 

  • Harrigan, K. R. and Diguardo, M. C. (2017). “Sustainability of patent-based competitive advantage in the US communications services industry.” The Journal of Technology Transfer, Vol. 42, No. 6, pp. 1334–1361, DOI: https://doi.org/10.1007/s10961-016-9515-2.

    Google Scholar 

  • Huang, W. H., Tserng, H. P., Liao, H. H., Yin, S. Y., Chen, P. C., and Lei, M. C. (2013). “Contractor financial prequalification using simulation method based on cash flow model.” Automation in Construction, Vol. 35, No. 11, pp. 254–262, DOI: https://doi.org/10.1016/j.autcon.2013.05.004.

    Google Scholar 

  • Hwang, B. G., Zhao, X., and Chin, E. W. (2017). “International construction joint ventures between Singapore and developing countries.” Engineering Construction & Architectural Management, Vol. 24, No. 2, pp. 209–228, DOI: https://doi.org/10.1108/ECAM-03-2015-0035.

    Google Scholar 

  • Joliffe, I. T. and Morgan, B. J. (1992). “Principal component analysis and exploratory factor analysis.” Statistical Methods in Medical Research, Vol. 1, No. 1, pp. 69–95, DOI: https://doi.org/10.1177/096228029200100105.

    Google Scholar 

  • Kamminga, P. E., Meer-Kooistra, J. V. D. (2007). “Management control patterns in joint venture relationships: A model and an exploratory study.” Accounting Organizations & Society, Vol. 32, No. 1, pp. 131–154, DOI: https://doi.org/10.1016/j.aos.2006.03.002.

    Google Scholar 

  • Kamruzzaman, M. and Takeya, H. (2008). “Influence of technology responsiveness and distance to market on capacity building.” International Journal of Vegetable Science, Vol. 14, No. 3, pp. 216–231, DOI: https://doi.org/10.1080/19315260802164848.

    Google Scholar 

  • Keung, C. and Shen, L. (2017). “Network strategy for contractors’ business competitiveness.” Construction Management and Economics, Vol. 35, Nos. 8–9, pp. 482–497, DOI: https://doi.org/10.1080/01446193.2017.1329539.

    Google Scholar 

  • Kim, D. S., Baek, D. H., and Yoon, W. C. (2010). “Development and evaluation of a computer-aided system for analyzing human error in railway operations.” Reliability Engineering & System Safety, Vol. 95, No. 2, pp. 87–98, DOI: https://doi.org/10.1016/j.ress.2009.08.005.

    Google Scholar 

  • Kim, D. S., and Yoon, W. C. (2013). “An accident causation model for the railway industry: Application of the model to 80 rail accident investigation reports from the UK.” Safety Science, Vol. 60, No. 12, pp.57–68, DOI: https://doi.org/10.1016/j.ssci.2013.06.010.

    Google Scholar 

  • Lavie, D. (2006). “The competitive advantage of interconnected firms: an extension of the resource-based view.” Academy of Management Review, Vol. 31, No. 3, pp. 638–658, DOI: https://doi.org/10.5465/APBPP.2002.7516490.

    Google Scholar 

  • Leavy, B. (2014). “Strategy, organization and leadership in a new ‘transient-advantage’ world.” Strategy & Leadership, Vol. 42, No. 4, pp. 3–13, DOI: https://doi.org/10.1108/sl-05-2014-0038.

    Google Scholar 

  • Liang, X., Lu, X., and Wang, L. (2012). “Outward internationalization of private enterprises in China: The effect of competitive advantages and disadvantages compared to home market rivals.” Journal of World Business, Vol. 47, No. 1, pp. 134–144, DOI: https://doi.org/10.1016/j.jwb.2011.02.002.

    Google Scholar 

  • Lu, W., Shen, L., and Yam, M. (2008). “Critical success factors for competitiveness of contractors: A China study.” Journal of Construction Engineering & Management, Vol. 134, No. 12, pp. 972–982, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:12(972).

    Google Scholar 

  • Maccallum, R. C., Widaman, K. F., Preacher, K. J., and Hong, S. (2001). “Sample size in factor analysis: The role of model error.” Multivariate Behavioral Research, Vol. 36, No. 4, pp. 611–637, DOI: https://doi.org/10.1207/S15327906MBR3604_06.

    Google Scholar 

  • McGrath, R. G. (2013). “Continuous reconfiguration in the transient advantage economy.” Strategy & Leadership, Vol. 41, No. 5, pp. 19–24, DOI: https://doi.org/10.1108/SL-05-2013-0039.

    Google Scholar 

  • Melykh, K. and Melykh, O. (2016). “Implication of environmental certification and CSR for companies’ sustainable performance in developing countries.” Journal of Sustainable Development, Vol. 9, No. 3, pp. 160–169, DOI: https://doi.org/10.5539/jsd.v9n3p160.

    Google Scholar 

  • Mu, S., Hu, C., Chohr, M., and Peng, W. (2014). “Assessing risk management capability of contractors in subway projects in mainland China.” International Journal of Project Management, Vol. 32, No. 3, pp. 452–460, DOI: https://doi.org/10.1016/j.ijproman.2013.08.007.

    Google Scholar 

  • Obloj, T. and Obloj, K. (2006). “Diminishing returns from reputation: Do followers have a competitive advantage?” Corporate Reputation Review, Vol. 9, No. 4, pp. 213–224, DOI: https://doi.org/10.1057/palgrave.crr.1550029.

    Google Scholar 

  • O’Shannassy, T. (2008). “Sustainable competitive advantage or temporary competitive advantage: Improving understanding of an important strategy construct.” Journal of Strategy and Management, Vol. 1, No. 2, pp. 168–180, DOI: https://doi.org/10.1108/17554250810926357.

    Google Scholar 

  • Oyewobi, L. O., Windapo, A. O., James, R. O. B. (2015). “An empirical analysis of construction organisations’ competitive strategies and performance.” Built Environment Project & Asset Management, Vol. 5, No. 4, pp. 417–431, DOI: https://doi.org/10.1108/BEPAM-10-2013-0045.

    Google Scholar 

  • Porter, M. (1985). Competitive advantage creating and sustaining superior performance, New York, Free Press.

    Google Scholar 

  • Ram, J., Wu, M. L., and Tagg, R. (2014). “Competitive advantage from ERP projects: Examining the role of key implementation drivers.” International Journal of Project Management, Vol. 32, No. 4, pp. 663–675, DOI: https://doi.org/10.1016/j.ijproman.2013.08.004.

    Google Scholar 

  • Rendon, R., Apte, U., and Dixon, M. (2015). “Contractor past performance information: An analysis of assessment narratives and objective ratings.” Developmental Neuroscience, Vol. 22, No. 22, pp. 384–92.

    Google Scholar 

  • Santos-Vjande, M. L., López-Sánchez, J. Á., and Trespalacios, J. A. (2012). “How organizational learning affects a firm’s flexibility, competitive strategy, and performance.” Journal of Business Research, Vol. 65, No. 8, pp. 1079–1089, DOI: https://doi.org/10.1016/j.jbusres.2011.09.002.

    Google Scholar 

  • Scheepbouwer, E., Gransberg, D. D., and Puerto, C. L. D. (2017). “Construction engineering management culture shift: Is the lowest tender offer dead?” Frontiers of Engineering Management, Vol. 4, No. 1, pp. 49–57, DOI: https://doi.org/10.15302/J-FEM-2017014.

    Google Scholar 

  • Shen, L. Y., Lu, W. S., and Yam, M. C. (2006). “Contractor key competitiveness indicators: A China study.” Journal of Construction Engineering & Management, Vol. 132, No. 4, pp. 416–424, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:4(416).

    Google Scholar 

  • Shen, L. Y., Ochoa, J. J., Zhang, X. and Yi, P. (2013). “Experience mining for decision making on implementing sustainable urbanization — An innovative approach.” Automation in Construction, Vol. 29, pp. 40–49, DOI: https://doi.org/10.1016/j.autcon.2012.07.001.

    Google Scholar 

  • Shenkar, O. (2012). “Beyond cultural distance: Switching to a friction lens in the study of cultural differences.” Journal of International Business Studies, Vol. 43, No. 1, pp. 12–17, DOI: https://doi.org/10.1057/jibs.2011.42.

    Google Scholar 

  • Sun, Q., Feng, X., and Kai, B. (2011). “Operation and organization management of high-speed railway in Japan.” Journal of Transportation Systems Engineering & Information Technology, Vol. 11, No. 5, pp. 11–16, DOI: https://doi.org/10.1016/s1570-6672(10)60138-9.

    Google Scholar 

  • Tabachnick, B. G. and Fidell, L. S. (2001). Computer-assisted research design and analysis, Allyn and Bacon, Boston.

    Google Scholar 

  • Tan, Y., Shen, L., and Yao, H. (2011). “Sustainable construction practice and contractors’ competitiveness: A preliminary study.” Habitat International, Vol. 35, No. 2, pp. 225–230, DOI: https://doi.org/10.1016/j.habitatint.2010.09.008.

    Google Scholar 

  • Tarawneh, S. A. (2014). “Marketing for service quality — contractors’ perception: UAE case study.” European Journal of Business & Management, Vol. 6, No. 16, pp. 94–101.

    Google Scholar 

  • Thomas, L. G. and D’Aveni R. (2009). “The changing nature of competition in the us manufacturing sector, 1950–2002.” Strategic Organization, Vol. 7, No. 4, pp. 387–431, DOI: https://doi.org/10.1177/1476127009348561.

    Google Scholar 

  • Thompson, B., Grimm, L. G., and Yarnold, P. R. (2000). Ten commandments of structural equation modeling, American Psychological Association, Washington DC, USA.

    Google Scholar 

  • Utsunomiya, M. and Hodota, K. (2011). “Financial lessons from Asian experience in constructing and operating high speed train networks.” Transportation,, Vol. 38, No. 5, pp. 753–764, DOI: https://doi.org/10.1007/s11116-011-9348-7.

    Google Scholar 

  • Velásquez, T. A. (2012). “The science of corporate social responsibility (CSR): Contamination and conflict in a mining project in the southern Ecuadorian Andes.” Resources Policy, Vol. 37, No. 2, pp. 233–240, DOI: https://doi.org/10.1016/j.resourpol.2011.10.002.

    Google Scholar 

  • Vogel, R. and Güttel, W. H. (2013). “The dynamic capability views in strategic management: A bibliometric review.” International Journal of Management Reviews, Vol. 15, No. 4, pp. 426–446, DOI: https://doi.org/10.1111/ijmr.12000.

    Google Scholar 

  • Weerawardena, J. and Mavondo, F. T. (2011). “Capabilities, innovation and competitive advantage.” Industrial Marketing Management, Vol. 40, No. 8, pp. 1220–1223, DOI: https://doi.org/10.1016/j.indmarman.2011.10.012.

    Google Scholar 

  • Wei, Y. and Miraglia, S. (2017). “Organizational culture and knowledge transfer in project-based organizations: Theoretical insights from a Chinese construction firm.” International Journal of Project Management, Vol. 35, No. 4, pp. 571–585, DOI: https://doi.org/10.1016/j.ijproman.2017.02.010.

    Google Scholar 

  • Wen, Q. and Qiang, M. (2016). “Enablers for organizational project management in the Chinese context.” Project Management Journal, Vol. 47, No. 1, pp. 113–126, DOI: https://doi.org/10.1002/pmj.21565.

    MathSciNet  Google Scholar 

  • Wright, P. M., Mcmahan, G. C., and Mcwilliams, A. (2016). “Human resources and sustained competitive advantage: A resource-based perspective.” International Journal of Human Resource Management, Vol. 5, No. 2, pp. 301–326, DOI: https://doi.org/10.1080/09585199400000020.

    Google Scholar 

  • Wu, H. Y., Lin, Y. J., Chien, F. L., and Hung, Y. M. (2011). “A study on the relationship among supplier capability, partnership and competitive advantage in Taiwan’s semiconductor industry.” International Journal of Electronic Business Management, Vol. 9, No. 2, pp. 122–138.

    Google Scholar 

  • Zhang, S. (2012). “International competitiveness of China’s wind turbine manufacturing industry and implications for future development.” Renewable and Sustainable Energy Reviews, Vol. 16, No. 6, pp. 3903–3909, DOI: https://doi.org/10.1016/j.rser.2012.03.006.

    Google Scholar 

  • Zhang, N., Deng, X., Zhao, X., and Chang, T. (2019). “Exploring the Sources of contractors’ competitive advantage on international HSR construction projects.” International Journal of Civil Engineering, Vol. 17, No. 7, pp. 1115–1129, DOI: https://doi.org/10.1007/s40999-018-0373-1.

    Google Scholar 

  • Zhou, P. F., Han, B. M., and Zhang, Q. (2014). “Survey on high-speed railway train plan design issues.” Applied Mechanics and Materials. Trans Tech Publications, pp. 489–492.

    Google Scholar 

Download references

Acknowledgements

The study was financed by the National Natural Science Foundation of China (Grant No.71771052). The authors thank the respondents from both the industry and academia who have assisted the research by completing the interviews or questionnaires about contractors’ TCA in the competition of international HSR projects. The authors also thank the anonymous reviewers for their helpful comments and suggestions in enhancing this paper.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Xiaopeng Deng.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zhou, Q., Deng, X., Jin, R. et al. Analyzing the Key Drivers of Contractors’ Temporary Competitive Advantage in the Competition of International High-speed Rail Projects. KSCE J Civ Eng 23, 4579–4591 (2019). https://doi.org/10.1007/s12205-019-0602-4

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-019-0602-4

Keywords

Navigation