The selection of a general contractor for construction works is one of the most important decisions made throughout the entire construction project. It may be decisive in the success or failure of the project (e.g. delays in the commissioning of works, exceeding the budget, low quality of works). The article presents a method for supporting group decision-making in the contractor qualification process. The proposed method is a development of Mikhailov’s approach to Fuzzy Analytic Hierarchy Process. It consists in the aggregation of the decision makers’ judgments using type-2 fuzzy sets, allowing for inaccuracy of the decision-maker’s assessment. The use of an unbiased estimator of standard deviation for determining compromise evaluation enables the small size of the expert group and deviations in their evaluations to be taken into consideration. The quality of the solution obtained through this method was compared with the results obtained by means of Mikhailov’s Fuzzy Preference Programming and Enea & Piazza Method. The use of the proposed method generated better results for this example of preparing a ranking of contractors than the two other methods discussed. The method presented herein may also be proposed for solving decision-making problems in other spheres.
Similar content being viewed by others
References
Alonso, J. M. and Lamata, M. T. (2006). “Consistency in the analytic hierarchy process: A new approach.” International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems, Vol. 14, No. 4, pp. 445–459, DOI: 10.1142/S0218488506004114.
Altuzarra, A., Moreno-Jimenez, J. M., and Salvador, M. (2010). “Consensus building in AHP–group decision making: A bayesian approach.” Operations Research, Vol. 58, No. 6, pp. 1755–1773, DOI: 10.1287/opre.1100.0856.
Asan, U., Soyer, A., and Bozdag, E. (2016). “An interval type-2 fuzzy prioritization approach to project risk assessment.” Journal of Multiple-Valued Logic & Soft Computing, Vol. 26, No. 6, pp. 541–577.
Ballesteros-Pérez, P., Skitmore, M., Pellicer, E., and González-Cruz, M. C. (2015). “Scoring rules and abnormally low bids criteria in construction tenders: A taxonomic review.” Construction Management and Economics, Vol. 33, No. 4, pp. 259–278, DOI: 10.1080/01446193.2015.1059951.
Basak, I. and Saaty, T. L. (1993). “Group decision making using the Analytic Hierarchy Process.” Mathematical and Computer Modelling, Vol. 17, Nos. 4–5, pp. 101–109, DOI: 10.1016/0895-7177(93)90179-3.
Beynon, M. J. (2005). “A method of aggregating in DS/AHP for group decision-making with non-equivalent importance of individuals in the group.” Computers & Operations Research, Vol. 32, No. 7, pp. 1881–1896, DOI: 10.1016/j.cor.2003.12.004.
Buckley, J. J. (1985). “Fuzzy hierarchical analysis.” Fuzzy Sets and Systems, Vol. 17, No. 3, pp. 233–247, DOI: 10.1016/0165-0114(85)90090-9.
Chang, Ch.-W., Wu, Ch.-R., and Lin, H.-H. (2009). “Applying fuzzy hierarchy multiple attribute to construct an expert decision making process.” Expert System with Applications, Vol. 36, No. 4, pp. 7363–7368, DOI: 10.1016/j.eswa.2008.09.026.
Chang, D.-Y. (1996). “Applications of the extent analysis method on fuzzy AHP.” European Journal of Operational Research, Vol. 95, No. 3, pp. 649–655, DOI: 10.1016/0377-2217(95)00300-2.
Chen, A.-M., and Lee, L.-W. (2010). “Fuzzy multiple attributes group decision-making based on the ranking values and the arithmetic operations on interval type-2 fuzzy sets.” Expert Systems with Applications, Vol. 37, No. 1, pp. 824–833, DOI: 10.1016/j.eswa.2009.06.094.
Chen, S. J., Hwang, C. L., and Hwang, F. P. (1992). Fuzzy multiple attribute decision making: methods and applications, Springer-Verlag, Berlin, DOI: 10.1007/978-3-642-46768-4.
Cheng, E. W. L. and Li, H. (2004). “Contractor selection using the analytic network process.” Construction Management and Economics, Vol. 22, No. 10, pp. 1021–1032, DOI: 10.1080/0144619042000202852.
Chiao, K.-P. (2011). “Multiple criteria group decision making with triangular interval type-2 fuzzy sets.” IEEE International Conference on Fuzzy Systems, Taipei, pp. 2575–2582, DOI: 10.1109/FUZZY.2011.6007590.
Cho, Y. G., and Cho, K. T. (2008). “A loss function approach to group preference aggregation in the AHP.” Computer & Operations Research, Vol. 35, No. 3, pp. 884–892, DOI: 10.1016/j.cor.2006.04.008.
Enea, M. and Piazza, T. (2004). “Project selection by constrained fuzzy AHP.” Fuzzy Optimization and Decision Making, Vol. 3, No. 1, pp. 39–62, DOI: 10.1023/B:FODM.0000013071.63614.3d.
Escobar, M. T., and Moreno-Jimenez, J. M. (2007). “Aggregation of individual preference structures in AHP-group decision making.” Group Decision and Negotiation, Vol. 16, No. 4, pp. 287–301, DOI: 10.1007/s10726-006-9050-x.
Groselj, P., Malovrh, S. P., and Stirn, L. Z. (2001). “Methods based on data envelopment analysis for deriving group priorities in analytic hierarchy process.” Central European Journal of Operations Research, Vol. 19, No. 3, pp. 267–284, DOI: 10.1007/s10100-011-0191-x.
Groselj, P., Strin, L. Z., Ayrilmis, N., and Kuzman, M. K. (2015). “Comparison of some aggregation techniques using group analytic hierarchy process.” Expert Systems with Applications, Vol. 42, No. 4, pp. 2198–2204, DOI: 10.1016/j.eswa.2014.09.060.
Groselj, P. and Zadnik, S. (2012). “Acceptable consistency of aggregated comparison matrices in analytic hierarchy process.” European Journal of Operational Research, Vol. 223, No. 2, pp. 417–420, DOI: 10.1016/j.ejor.2012.06.016.
Hatush, Z. and Skitmore, M. (1997). “Evaluating contractor prequalification data: Selection criteria and project success factors.” Construction Management and Economics, Vol. 15, No. 2, pp. 129–147, DOI: 10.1080/01446199700000002.
Hatush, Z. and Skitmore, M. (1998). “Contractor selection using multicriteria utility theory: An additive model.” Building and Environment, Vol. 33, Nos. 2–3, pp. 105–115, DOI: 10.1016/S0360-1323(97)00016-4.
Hwang, J. S. and Kim, Y. S. (2016). A Bid decision-making model in the initial bidding phase for overseas construction projects.” KSCE Journal of Civil Engineering, Vol. 20, No. 4, pp. 1189–1200, DOI: 10.1007/s12205-015-0760-y.
Ishizaka, A. and Labib, A. (2011). “Review of the main developments in the analytic hierarchy process.” Expert Systems with Applications, Vol. 38, No. 11, pp. 14336–14345, DOI: 10.1016/j.eswa.2011.04.143.
Jaskowski, P., Biruk, S., and Bucon, R. (2010). “Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment.” Automation in Construction, Vol. 19, No. 2, pp. 120–126, DOI: 10.1016/j.autcon.2009.12.014.
Kahraman, C., Oztaysi, B., Sari, I. U., and Turanoglu, E. (2014). “Fuzzy analytic hierarchy process with interval type-2 fuzzy sets.” Knowledge-Based Systems, Vol. 59, pp. 48–57, DOI: 10.1016/j.knosys.2014.02.001.
Lin, Ch. and Kou, G. (2015). “Bayesian revision of the individual pairwise comparison under consensus in AHP-GDM.” Applied Soft Computing, Vol. 35, pp. 802–811, DOI: 10.1016/j.asoc.2015.02.041.
Liu, B., Huo, T., Liao, P.-Ch., Yuan, J., Sun., J., and Hu., X. (2017). “A special Partial Least Squares (PLS) path decision modelling for bid evaluation of large construction projects.” KSCE Journal of Civil Engineering, Vol. 21, No. 3, pp. 579–592, DOI: 10.1007/s12205-016-0702-3.
Mendel, J. M. (2007). “Type-2 fuzzy sets and systems: An overview.” IEEE Computational Intelligence Magazine, Vol. 2, No. 2, pp. 20–29, DOI: 10.1109/MCI.2007.357235.
Mendel, J. M., John, R. I., and Liu, F. L. (2006). “Interval type-2 fuzzy logical systems made simple.” IEEE Transactions on Fuzzy Systems, Vol. 14, No. 6, pp. 808–821, DOI: 10.1109/TFUZZ.2006.879986.
Mikhailov, L. (2003). “Deriving priorities from fuzzy pairwise comparison judgments.” Fuzzy Sets and Systems, Vol. 134, No. 3, pp. 365–385, DOI: 10.1016/S0165-0114(02)00383-4.
Mikhailov, L. (2004). “Group prioritization in AHP by fuzzy preference programing method.” Computers & Operations Research, Vol. 31, No. 2, pp. 293–301, DOI: 10.1016/S0305-0548(03)00012-1.
Minchin, R. E. and Smith, G. R. (2005). “Quality-based contractor rating model for qualification and bidding purposes.” Journal od Management in Engineering, Vol. 21, No. 1, pp. 38–43, DOI: 10.1061/(ASCE)0742-597X(2005)21:1(38).
Nieto-Morote, A. and Ruz-Vila, F. (2012). “A fuzzy multi-criteria decision-making model for construction contractor prequalification.” Automation in Construction, Vol. 25, pp. 8–19, DOI: 10.1016/j.autcon.2012.04.004.
Ossadnik, W., Schinke, S., and Kaspar, R. H. (2016). “Group aggregation techniques for analytic network process: A comparative analysis.” Group Decision and Negotiation, Vol. 25, No. 2, pp. 421–457, DOI: 10.1007/s10726-015-9448-4.
Padhi, S. S., and Mohapatra, P. K. (2010). “Centralized bid evaluation for awarding of construction projects–A case of India government.” International Journal of Project Management, Vol. 28, No. 3, pp. 275–284, DOI: 10.1016/j.ijproman.2009.06.001.
Plebankiewicz, E. (2009). “Contractor prequalification model using fuzzy sets.” Journal of Civil Engineering and Management, Vol. 15, No. 4, pp. 377–385, DOI: 10.3846/1392-3730.2009.15.377-385.
Plebankiewicz, E. and Dziadosz, A. (2006). Wybrane zagadnienia prekwalifikacji wykonawców robót budowlanych.” Przeglad budowlany, No. 5, pp. 45–49.
Ramanathan, R. and Ganesh, L. S. (1994). “Group preference aggregation methods employed in AHP: An evaluation and an intrinsic process for deriving members.” European Journal of Operational Research, Vol. 79, No. 2, pp. 249–265, DOI: 10.1016/0377-2217(94)90356-5.
Saaty, T. L. (1980). The Analytic Hierarchy Process. McGraw-Hill, New York.
Saaty, T. L. (1989). “Group decision making and the AHP.” in: Golden, B. L., Wasil, E. A., and Harker, P. T. (Eds.), The Analytic Hierarchy Process, Springer, Heidelberg, pp. 59–67, DOI: 10.1007/978-3-642-50244-6_4.
Saaty, T. L. (2013). “The modern science of multicriteria decision making and its practical applications: The AHP/ANP approach.” Operations Research, Vol. 61, No. 5, pp. 1101–1118, DOI: 10.1287/opre.2013.1197.
Saaty, T. L. and Tran, L. T. (2007). “On the invalidity of fuzzifying numerical judgments in the Analytic Hierarchy Process.” Mathematical and Computer Modelling, Vol. 46, Nos. 7–8, pp. 962–975, DOI: 10.1016/j.mcm.2007.03.022.
Saaty, T. L., and Vargas, L. G. (2007). “Dispersion of group judgments.” Mathematical and Computer Modelling, Vol. 46, Nos. 7–8, pp. 918–925, DOI: 10.1016/j.mcm.2007.03.004.
San Cristobal, J. R. (2012). “Contractor selection using multicriteria decision-making methods.” Journal of Construction Engineering and Management, Vol. 138, No. 6, pp. 751–758, DOI: 10.1061/(ASCE)CO.1943-7862.0000488.
Tang, L. Ch., Goh, T. N., Yam, H. S., and Yoap, T. (2006). Six Sigma. Advanced tools for black belts and master black belts. John Wiley & Sons, p. 78.
Taormina, R. and Chau, K.-W. (2015). “Data-driven input variable selection for rainfall–runoff modeling using binary-coded particle swarm optimization and Extreme Learning Machines.” Journal of Hydrology, Vol. 529, No. 3, pp. 1617–1632, DOI: 10.1016/j.jhydrol.2015.08.022.
Topcu, Y. I. (2004). “A decision model proposal for construction contractor selection in Turkey.” Building and Environment, Vol. 39, No. 4, pp. 469–481, DOI: 10.1016/j.buildenv.2003.09.009.
Trzaskalik, T. (2014). Wielokryterialne wspomaganie decyzji, Metody i zastosowania, PWE, Warszawa.
Turskis, Z. (2008). “Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique.” Technological and Economic Development, Vol. 14, No. 2, pp. 224–239, DOI: 10.3846/1392-8619.2008.14.224-239.
Ulubeyli, S. and Kazaz, A. (2016). “Fuzzy multi-criteria decision making model for subcontractor selection in international construction projects.” Technological and Economic Development of Economy, Vol. 22, pp. 210–234, DOI: 10.3846/20294913.2014.984363.
Vaidya, O. S. and Kumar, S. (2006). “Analytic hierarchy process: An overview of applications.” European Journal of Operational Research, Vol. 169, No. 1, pp. 1–29, DOI: 10.1016/j.ejor.2004.04.028.
van der Honert, R. C., and Lootsma, F. A. (1996). “Group preference aggregation in the multiplicative AHP–the model of the group decision process and Pareto optimality.” European Journal of Operational Research, Vol. 96, No. 2, pp. 363–370, DOI: 10.1016/0377-2217(95)00345-2
van der Honert, R.C. (1998). “Stochastic group preference modelling in the multiplicative AHP: A model of group consensus.” European Journal of Operational Research, Vol. 110, No. 1, pp. 99–111, DOI: 10.1016/S0377-2217(97)00243-9.
van Laarhoven, P. J. M., and Pedrycz, W. (1983). “Fuzzy extension for Saaty’s priority theory.” Fuzzy Sets and Systems, Vol. 11, Nos. 1–3, pp. 229–241, DOI: 10.1016/S0165-0114(83)80082-7.
Wang, W., Chau, K., Xu, D., and Chen, X.-Y. (2015). “Improving Forecasting Accuracy of Annual Runoff Time Series Using ARIMA Based on EEMD Decomposition.” Water Resources Management, Vol. 29, No. 8, pp. 2655–2675, DOI: 10.1007/s11269-015-0962-6.
Wang, Y.-M., Luo, Y., and Hua, Z. (2008). “On the extent analysis method for fuzzy AHP and its applications.” European Journal of Operational Research, Vol. 186, No. 2, pp. 735–747, DOI: 10.1016/j.ejor.2007.01.050.
Xu, Z. and Liao, H. (2014). “Intuitionistic Fuzzy Analytic Hierarchy Process.” IEEE Transactions on Fuzzy Systems, Vol. 22, No. 4, pp. 749–761, DOI: 10.1109/TFUZZ.2013.2272585.
Zadeh, L. A. (1965). “Fuzzy sets.” Information and Control, Vol. 8, No. 3, pp. 338–353, DOI: 10.1016/S0019-9958(65)90241-X.
Zadeh, L. A. (1975). “The concept of linguistic variable and its application to approximate reasoning-I.” Information Sciences, Vol. 8, No. 3, pp. 199–249, DOI: 10.1016/0020-0255(75)90036-5.
Zavadskas, E. K., Vilutiene, T., Turskis, Z., and Tamosaitiene, J. (2010). “Contractor selection for construction works by applying SAW-G and TOPSIS grey techniques.” Journal of Business Economics and Management, Vol. 11, No. 1, pp. 181–187, DOI: 10.3846/jbem.2010.03.
Zhang, S. and Chau, K.-W. (2009). Dimension Reduction Using Semi-Supervised Locally Linear Embedding for Plant Leaf Classification. In Emerging Intelligent Computing Technology and Applications (pp. 948–955). Springer, Berlin, Heidelberg, DOI: 10.1007/978-3-642-04070-2_100.
Zimmermann, J.-J. (2001). Fuzzy set theory – and its application (4th Ed.). Springer Science + Business Media, New York, DOI: 10.1007/978-94-010-0646-0.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Tomczak, M., Jaśkowski, P. Application of Type-2 Interval Fuzzy Sets to Contractor Qualification Process. KSCE J Civ Eng 22, 2702–2713 (2018). https://doi.org/10.1007/s12205-017-0431-2
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-017-0431-2