Abstract
The software stage-effort estimation can be used to dynamically adjust software project schedule, further to help make the project finished on budget. This paper presents a grey model Verhulst based method for stage-effort estimation during software development process, a bias correction technology was used to improve the estimation accuracy. The proposed method was evaluated with a large-scale industrial software engineering database. The results are very encouraging and indicate the method has considerable potential.
Similar content being viewed by others
References
Shepperd M J. Evaluating Software Project Prediction Systems[C]//11th IEEE International Software Metrics Symposium (METRICS 2005). Como, Italy, September 19–22, 2005.
Deng Julong. Control Problems of Grey Systems[J]. Systems & Control Letters, 1982, 1(5):288–294.
Song Qinbao, Shepperd M J, Carolyn M. Using Grey Relational Analysis to Predict Software Effort with Small Data Sets[C]// 11th IEEE International Software Metrics Symposium(METRICS 2005), Como, Italy, September 19–22, 2005.
Wang Yifan. On-Demand Forecasting of Stock Prices Using a Real-Time Predictor[J]. IEEE Transactions on Knowledge and Data Engineering, 2003, 15(4):1033–1037.
Shen D H, Du J C. Grey Model for Asphalt Pavement Performance Prediction[C]//2004 IEEE Intelligent Transportation systems Conference. Washington D.C., October 3–6, 2004.
Huang S J, Huang C L. Control of an Inverted Pendulum Using Grey Prediction Model[J]. IEEE Transactions on Industry Applications, 2000, 36(2):452–458.
Luo R C, Chen T M, Su K L. Target Tracking Using a Hierarchical Grey-Fuzzy Motion Decision-Making Method[J]. IEEE Transactions on Systems, Man and Cybernetics, Part A, 2001, 31(3):179–186.
Su S L, Su Y C, Huang J F. Grey-Based Power Control for DS-CDMA Cellular Mobile Systems[J]. IEEE Transactions on Vehicular Technology, 2000, 49(6):2081–2088.
Jou J M, Chen P Y, Sun J M. The Gray Prediction Search Algorithm for Block Motion Estimation[J]. IEEE Transactions on Circuits and Systems for Video Technology, 1999, 9(6):843–848.
MacDonell S G, Shepperd M J. Using Prior-Phase Effort Records for Reestimation During Software Projects[C]//9th IEEE International Software Metrics Symposium (Metrics 2003). Sydney, Australia, September 3–5, 2003:73–86.
Kulkarni A, Greenspan J B, Kriegman D A, et al. A Generic Technique for Developing a Software Sizing and Effort Estimation Model[C]//Proc COMPSAC’88, Chicago, IL, October 3–6, 1988:151–161.
Deng Julong. Introduction to Grey System Theory[J]. The Journal of Grey System, 1989, 1(1):1–24.
Liu Sifeng, Dang Yaoguo, Fang Zhigeng. Grey System Theory and Application[M]. Beijing: Science Press, 2004(Ch).
Author information
Authors and Affiliations
Corresponding author
Additional information
Foundation item: Supported by the National Natural Science Foundation of China (60673124), the National High Technology Research and Development Program of China (863 Program)(2006AA01Z183).
Biography: WANG Yong(1971–), male, Ph.D. candidate, research direction: software engineering and data mining.
Rights and permissions
About this article
Cite this article
Wang, Y., Song, Q. & Shen, J. Grey prediction based software stage-effort estimation. Wuhan Univ. J. of Nat. Sci. 12, 927–931 (2007). https://doi.org/10.1007/s11859-007-0015-y
Received:
Issue Date:
DOI: https://doi.org/10.1007/s11859-007-0015-y