Abstract

Fetr6 is an underground mine using the stope-and-pillar mining method. As there was some evidence regarding pillar failure in this mine, improving works such as roof support and replacing existing pillars with concrete pillars (CP) were carried out. During the construction of the second CP, in the space between the remaining pillars, one of the pillars failed leading to the progressive failure of other pillars until 4 000 m2 of mine had collapsed within a few minutes. In this work, this phenomenon is described by applying both numerical and empirical methods and the respective results are compared. The results of numerical modelling are found to be closer to the actual condition than those of the empirical method. Also, a width-to-height (W/H) ratio less than 1, an inadequate support system and the absence of a detailed program for pillar recovery are shown to be the most important causes of the Domino failure in this mine.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. ZIPF R K. Toward pillar design to prevent collapse of room and pillar mines [R]. NIOSH — Spokane Research Laboratory, 2011.

  2. SWANSON P L, BOLER F. The magnitude 5.3 seismic event and collapse of the solvay trona mine: Analysis of pillar/floor failure stability [R]. U S Bureau of Mines OFR 86-95, 1995.

  3. ZIPF R K. Pillar design to prevent collapse of room-and-pillar mines, [M]// W. HUSTRULID and R L BULLOCK, eds, Underground mining methods handbook. Littleton, CO, Society for Mining, Metallurgy, and Exploration, 1982.

    Google Scholar 

  4. BRYAN A, BRYAN J G, FOUCHE J. Some problems of strata control and support in pillar workings [J]. The Mining Engineer, 1966, 123: 238–254.

    Google Scholar 

  5. SHEOREY P R, BARAT D, MUKHERJEE K P, PRASAD R K, DAS M N, BANERJEE G, DAS K. Application of the yield pillar technique for successful depillaring under stiff strata [J]. Int J of Rock Mech and Min Sci & Geomech, 1995, 32,(7): 699–708.

    Article  Google Scholar 

  6. GALVIN J. A review of coal pillar design in australia [C]// Proceedings of the Workshop on Coal Pillar Mechanics and Design, Santa Fe: US Bureau of Mines Inform. 1992: 196–213.

  7. ZIPF R K, SWANSON P L. Description of a Large Catastrophic Failure in a South western Wyoming Trona Mine, Paper in Rock Mechanics for Industry [C]// Proceedings of the 37th U S Rock Mechanics Symposium, Balkema, 1999:293–298.

  8. FARYAB COMPANY Ltd. Fetr-6 underground mine design, Technical report [R]. 2008.

  9. BROWN E T. Rock characterization testing and monitoring, ISRM suggested methods [M]. New York: Pergamon Press, 1981.

    Google Scholar 

  10. BIENIAWSKI Z T. Engineering Rock Mass Classification [M]. New York: J. Willey, 1989.

    Google Scholar 

  11. ITASCA Consulting Group, Verification Problems & Example Applications, 3-Dec, ver 2.0 [EB/OL], www.itascacg.com, 1999.

  12. BIENIAWSKI Z T. Ground control, 2nd ed [M]//, HARTMAN H L, ed. Mining Engineering Handbook. Littleton, CO: Society for Mining, Metallurgy, and Exploration, 1992:897–937.

    Google Scholar 

  13. HOEK E, BROWN E T. Underground excavations in rock [M]. London: Institution of Mining and Metallurgy, 1980, 527.

    Google Scholar 

  14. ESTERHUIZEN G S, DOLINAR D R, ELLENBERGER J L. Pillar strength in underground stone mines in the united states [J]. International Journal of Rock Mechanics & Mining Sciences, 2011, 48: 42–50.

    Article  Google Scholar 

  15. WHITTAKER B N, REDDISH D J. Subsidence, occurrence, prediction and control [M]. Waltham: Elsevier Science Publishers, 1989: 173–201.

    Google Scholar 

  16. ESTERHUIZEN G S, DOLINAR D R; ELLENBERGER J L, PROSSER L J. Pillar and roof span design guidelines for underground stone mines [R]. Department Of Health And Human Services, NIOSH, IC 9526, 2011.

  17. GONZALEZ-NICIEZAL C, LVAREZ-FERNANDEZ M I A, MENENDEZ-DIAZ A, LVAREZ-VIGIL A E A. A comparative analysis of pillar design method and its application to marble mines [J]. Rock Mech. Rock Eng, 2006.

  18. BIENIAWSKI Z T. The effect of specimen size on compressive strength of coal [J]. Int J of Rock Mech And Min Sci, 1968, 5, 325–335.

    Article  Google Scholar 

  19. MALAN D F, NAPIER J A L. The design of stable pillars in the bushveld complex mines: A problem solved? [J]. The Journal of the Southern African Institute of Mining and Metallurgy, 2011, 111: 821–836.

    Google Scholar 

  20. FARMER I W. Room and pillar mining [M]// 2nd ed, HARTMAN H L, ed. Mining Engineering Handbook. Littleton, CO: Society for Mining, Metallurgy, and Exploration, 1992: 1681–1701.

    Google Scholar 

  21. BRADY B H G, BROWN E T. Rock mechanics for underground mining [M]. Boston: Kluwer Academic Pub, 1993, 571.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to S. Dehghan.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Dehghan, S., Shahriar, K., Maarefvand, P. et al. 3-D numerical modelling of Domino failure of hard rock pillars in Fetr6 Chromite Mine, Iran, and comparison with empirical methods. J. Cent. South Univ. 20, 541–549 (2013). https://doi.org/10.1007/s11771-013-1517-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11771-013-1517-8