Abstract
The engineer-to-order industry is under constant pressure to optimise production and handle complexity in the delivery of the right components at the right time. In many cases, e.g. in the building industry, they have to install their components at the construction site. Synchronisation between fabrication and on-site installation is difficult to realise with traditional planning techniques and instruments. The purpose of this study is to outline the potential of real-time-capable production planning and control in engineer-to-order companies as a successful approach to minimise time-dependent combinatorial complexity in the value chain. This research is based on axiomatic design theory in order to explain and confirm the hypothesis of complexity reduction through a near real-time feedback request at the installation site. We have demonstrated this through the information axiom of axiomatic design which states that complexity can be reduced to a minimum through a digitally automated continuous (re-)planning in order to avoid the system range shifting outside of the design range. Thus, the research team has described the first results of an industrial case study to develop a digital software tool to overcome this limitation. Our research contributes to complexity management in engineer-to-order manufacturing companies and further provides future direction towards digitalisation.
Similar content being viewed by others
References
Browne J, Harren J, Shivan J (1996) Production management systems. An integrated perspective. Addison-Wesley, Harlow
Ballard G, Arbulu R (2004) Making prefabrication lean. In: Proceedings of 12th annual conference of the international group for lean construction, Helsingør, pp 3–5
Bertrand JW, Muntslag DR (1993) Production control in engineer-to-order firms. Int J Prod Eco 30:3–22. https://doi.org/10.1016/0925-5273(93)90077-X
Matt DT, Dallasega P, Rauch E (2014) Synchronization of the manufacturing process and on-site installation in ETO companies. Procedia CIRP 17:457–462. https://doi.org/10.1016/j.procir.2014.01.058
Hon KKB (2005) Performance and evaluation of manufacturing systems. CIRP Ann Manuf Technol 54:139–154. https://doi.org/10.1016/S0007-8506(07)60023-7
Efthymiou K, Mourtzis D, Pagoropoulos A, Papakostas N, Chryssolouris G (2016) Manufacturing systems complexity analysis methods review. Int J Comput Integr Manuf 29:1025–1044. https://doi.org/10.1080/0951192X.2015.1130245
Dallasega P, Rauch E, Matt DT (2015) Sustainability in the supply chain through synchronization of demand and supply in ETO-companies. Procedia CIRP 29:215–220. https://doi.org/10.1016/j.procir.2015.02.057
Ballard G, Gregory H (1998) Shielding production: essential step in production control. J Constr Eng Manag 124:11–17. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(11)
Lincoln HF, Syed MA (2011) Modern construction–lean project delivery and integrated practices. CRC Press, Boca Raton
Dallasega P, Rally P, Rauch E, Matt DT (2016) Customer-oriented Production System for Supplier Companies in CTO. Procedia CIRP 57:533–538. https://doi.org/10.1016/j.procir.2016.11.092
Arbulu R (2006) Application of pull and conwip in construction production systems. In: Proceedings of the International Group of Lean Construction IGLC-14, Santiago-Chile, pp 215–226
Papadopoulou PC (2013) Application of lean scheduling and production control in non-repetitive manufacturing systems using intelligent agent decision support. Thesis submitted for the degree of Doctor of Philosophy School of Engineering & Design Brunel University, 2013, pp 20–22
Ghimire S, Luis-Ferreira F, Nodehi T, Jardim-Goncalves R (2017) IoT based situational awareness framework for real-time project management. Int J Comput Integr Manuf 30:74–83. https://doi.org/10.1080/0951192X.2015.1130242
Schuh G, Brosze T, Kompa S, Meier C (2012) Real-time capable production planning and control in the order management of built-to-order companies. In: ElMaraghy H (ed) Enabling manufacturing competitiveness and economic sustainability. Springer, Berlin Heidelberg, pp 557–562
Arica E, Powell DJ (2014) A framework for ICT-enabled real-time production planning and control. Adv Manuf 2:158–164. https://doi.org/10.1007/s40436-014-0070-5
Zöbel D (2008) Echtzeitsysteme. Springer, Berlin
Cundius C, Alt R (2013) Real-time or near real-time? Towards a real-time assessment model. In: Proceedings of the 34th International Conference on Information Systems, Milan, pp 1–18
Georgoulias K, Papakostas N, Makris S, Chryssolouris G (2007) A toolbox approach for flexibility measurements in diverse environments. CIRP Ann Manuf Technol 56:423–426. https://doi.org/10.1016/j.cirp.2007.05.101
Schuh G, Gottschalk S, Höhne T (2007) High resolution production management. Ann CIRP 56:439–442. https://doi.org/10.1016/j.cirp.2007.05.105
Mourtzis D, Vlachou E, Doukas M, Kanakis N, Xanthopoulos N, Koutoupes A (2015) Cloud-based adaptive shop-floor scheduling considering machine tool availability. In: Proceedings of the International Mechanical Engineering Congress & Exposition ASME 2015, Houston, Texas. https://doi.org/10.1115/IMECE2015-53025
Lanza G, Stricker N, Moser R (2013) Concept of an intelligent production control for global manufacturing in dynamic environments based on rescheduling. In: Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, Bangkok, pp 315–319
Georgiadis P, Michaloudis C (2012) Real-time production planning and control system for job-shop manufacturing: A system dynamics analysis. Eur J Oper Res 216:94–104. https://doi.org/10.1016/j.ejor.2011.07.022
Vatankhah Barenji A, Hashemipour M (2017) Real-time building information modeling (BIM) synchronization using radio frequency identification technology and cloud computing system. J Ind Syst Eng 10:61–68
Suh NP (1990) The principles of design. Oxford University Press, New York
Park GJ (2007) Analytic methods for design practice. Springer, London
Matt DT, Rauch E (2011) Continuous improvement of manufacturing systems with the concept of functional periodicity. Key Eng Mater 473:783–790. https://doi.org/10.4028/www.scientific.net/KEM.473.783
Matt DT (2010) Axiomatic design of agile manufacturing systems. In: Aized T (ed) Future manufacturing systems. Intech, Rijeka, pp 179–194
Suh NP (2005) Complexity–theory and applications. Oxford University Press, New York
Matt DT (2010) Functional periodicity as a concept for the (re-)design to agility of production systems. Prod Eng Res Devel 4:363–369. https://doi.org/10.1007/s11740-010-0247-0
Matt DT (2007) Achieving operational excellence through systematic complexity reduction in manufacturing system design. Key Eng Mater 344:865–872. https://doi.org/10.4028/www.scientific.net/KEM.344.865
Arashpour M, Wakefield R, Lee EWM, Chan R, Reza Hosseini M (2016) Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction. Int J Proj Manage 34:1393–1402. https://doi.org/10.1016/j.ijproman.2016.02.004
Dallasega P, Rauch E, Matt DT, Fronk A (2015) Increasing productivity in ETO construction projects through a lean methodology for demand predictability. In: Proceedings of the 2015 International Conference on Industrial Engineering and Operations Management, Dubai, pp 1–11
Dallasega P, Marcher C, Marengo E, Rauch E, Matt DT, Nutt W (2016) A Decentralized and Pull-based Control Loop for On-Demand Delivery in ETO Construction Supply Chains. In: Proceedings of the 24th Annual Conference of the International Group for Lean Construction, Boston, pp 32–42
Dallasega P, Marengo E, Nutt W, Rescic L, Matt DT, Rauch E (2015) Design of a Framework for Supporting the Execution-Management of Small and Medium sized Projects in the AEC-industry. In: Proceedings of the 4th International Workshop on Design in Civil and Environmental Engineering, 2015, pp 30–31
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
The authors declare that there is no conflict of interest regarding the publication of this paper.
Rights and permissions
About this article
Cite this article
Rauch, E., Dallasega, P. & Matt, D.T. Complexity reduction in engineer-to-order industry through real-time capable production planning and control. Prod. Eng. Res. Devel. 12, 341–352 (2018). https://doi.org/10.1007/s11740-018-0809-0
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11740-018-0809-0