Impacts of Ghana’s Bui dam hydroelectricity project on the livelihood of downstream non-resettled communities

  • Original Article
  • Published:
Sustainability Science Aims and scope Submit manuscript

Abstract

Ghana’s socio-economic development, since independence, has been driven by the Akosombo and Kpong dams that provide water (for domestic, agriculture and industrial use) and hydroelectricity. It was hoped that with these past experiences, the Ghana government would be in a better position to manage the livelihood issues of the newly built Bui hydroelectricity dam better. Using a modified political ecology framework, this study examined the implications of the Bui dam project on the livelihoods of the downstream communities, which have received limited scholarly attention. Results from 158 household questionnaire interviews, corroborated by in-depth interviews with relevant stakeholders and focus group discussions indicate a complete lack of compensation package of any form for affected downstream communities. Fishing and farming, the dominant livelihood strategies of the households interviewed, have become unproductive and unsustainable leading to reduced incomes. Additionally, the unregulated activities of small-scale gold miners (galamsey) in the river bed which were made possible after the Bui dam’s construction were cited by most interviewees and focus group discussants for its negative impacts on human and ecological health. In a nutshell, existing livelihoods systems of downstream non-resettled communities post the Bui dam construction have been severely disrupted. Addressing the present challenges facing downstream communities in an integrative and participatory manner should be the top priority of the dam planners and implementers especially the Bui Power Authority and the District Assemblies.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2

Source: Produced by the authors

Fig. 3

Source: Fieldwork (June 2016)

Fig. 4

Source: Fieldwork (June 2016)

Similar content being viewed by others

References

  • Alhassan EH (2013) Hydro-biology and fish production of the Black Volta near the Bui Dam during the pre- and post-impoundment periods. Doctor of Philosophy Dissertation, Department of Marine and Fisheries Sciences, University of Ghana, Legon. http://ugspace.ug.edu.gh/bitstream/123456789/5183/1/Accessed 19 Sept 2017

  • Amornsakchai S, Annez P, Vongvisessomjai S, Choowaew S, Kunurat P, Nippanon J, Schouten R, Sripapatrprasite P, Vaddhanaphuti C, Vidthayanon C, Wirojanagud W (2000) Pak Mun Dam, Mekong River Basin, Thailand. A WCD case study prepared as an input to the World Commission on Dams. WCD, Cape Town

  • Arthur JL (2016) Living with the Bui dam; Implications for community livelihoods. Doctor of Philosophy Dissertation. Department of Geography, University of Victoria. https://dspace.library.uvic.ca/handle/1828/7726. Accessed 28 Sept 2017

  • Atindana SA, Mensah P, Alhassan EH, Ampofo-Yeboah A, Abobi SM, Kongyuure DN, Abarike ED (2015) The socio-economic impact of Bui dam on resettled communities; a case study of Lucene and Agbegikuro communities in the northern region of Ghana. UDS Int J Dev 2(1):45–51

    Google Scholar 

  • Bosshard P (2010) The forgotten downstream victims of large dams. http://www.internationalrivers.org/blogs/227/the-forgotten-downstream-victims-of-large-dams. Accessed 12 May 2016

  • Bryant R (1996) The politics of forestry in Burma. In: Hirsch P, Warren C (eds) Politics and environment in Southeast Asia: resources and resistance. Routledge, London, New York, pp 107–121

    Google Scholar 

  • Bryant R (1997) Beyond the impasse: the power of political ecology in Third World environment research. Area 29(1):5–19. https://doi.org/10.1111/j.1475-4762.1997.tb00003.x

    Article  Google Scholar 

  • Bryant RL, Bailey S (1997) Third world political ecology. Routledge, London, New York

    Google Scholar 

  • Bui Power Authority (BPA) (2011) Leaflet describing the Bui Hydropower Project, background and proposed benefits. Bui Power Authority (BPA), East Legon, Accra

    Google Scholar 

  • Cernea MM (2004) Social impacts and social risks in hydropower programs: preemptive planning and counter-risk measures. Beijing, China: session on social aspects of hydropower development United Nations symposium on hydropower and sustainable development, Beijing, China, 27–29 Oct 2004

  • Dandekar P, Mehta S (2010) Taking action in India on downstream impacts of dams. International Rivers. http://www.internationalrivers.org/resources/taking-action-in-india-on-downstream-impacts-of-dams-1672. Accessed 20 May 2016

  • Dauvergne P (1994) The politics of deforestation in Indonesia. Pac Aff 66(4):497–518. https://doi.org/10.2307/2760676

    Article  Google Scholar 

  • Duflo E, Pande R (2007) Dams. Q. J Econ 122(2):601–646

    Article  Google Scholar 

  • Fink M (2005) Integrating the world commission on dams recommendations in large dam planning processes: the case of Bui, Ghana. Mimeo, Dortmund

    Google Scholar 

  • Fujikura R, Nakayama M (2013) The long-term impacts of resettlement programmes resulting from dam construction projects in Indonesia, Japan, Laos, Sri Lanka and Turkey: a comparison of land-for-land and cash compensation schemes. Int J Water Resour Dev 29(1):4–13. https://doi.org/10.1080/07900627.2012.741032

    Article  Google Scholar 

  • Goldsmith E, Hildyard N (eds) (1986) The social and environmental effects of large dams. Case studies, vol 2. Springer, Camelford

    Google Scholar 

  • Gyau-Boakye P (2001) Environmental Impacts of the Akosombo dam and effects of climate change on the lake levels. Environ Dev Sustain 3:17–29. https://doi.org/10.1023/A:1011402116047

    Article  Google Scholar 

  • Harvey D (1993) The nature of environment: dialectics of social and environmental change. In: Miliband R, Panitch L (eds) real problems, false solutions. A special issue of the Socialist Register. The Merlin Press, London

    Google Scholar 

  • Hensengerth O (2011) Interaction of Chinese Institutions with host Governments in Dam Construction: The Bui Dam in Ghana. Evolution of Dam Policies: Evidence from the Big Hydropower States. German Development Institute, Discussion Paper 3. https://doi.org/10.1007/978-3-642-23403-3_8

  • Hensengerth O (2013) Chinese hydropower companies and environmental norms in countries of the global South: the involvement of Sinohydro in Ghana’s Bui Dam. Environ Dev Sustain 15(2):285–300. https://doi.org/10.1007/s10668-012-9410-4

    Article  Google Scholar 

  • Hensengerth O (2018) China’s investment in African hydropower: how to govern the water-energy nexus? Evidence from Bui Dam in Ghana. In: Siciliano G, Urban F (eds) chinese hydropower development in Africa and Asia: challenges and opportunities for sustainable global dam-building. Routledge, Taylor and Francis, London

    Google Scholar 

  • Hirsch P, Wyatt A (2004) Negotiating local livelihoods: scales of conflict in the Se San River Basin. Asia Pac Viewp 45(1):51–68. https://doi.org/10.1111/j.1467-8376.2004.00227.x

    Article  Google Scholar 

  • Institute of Local Government Studies, & Friedrich-Ebert-Stiftung Ghana (2010) A guide to district assemblies in Ghana. Friedrich-Ebert-Stiftung Ghana, Accra

    Google Scholar 

  • International Water Management Institute (IWMI) (2009) Successes and Challenges of the Akosombo and Kpong Resettlement Schemes: lessons for the Bui scheme. National Public Policy Support for Sustainable Dam Development in Ghana. In: Proceedings of the 1st Annual Meeting of Dam Affected Communities at Akuse Club House Conference Room, Akuse 17 July 2009

  • Kirchherr J, Pohlner H, Charles KJ (2016a) Cleaning up the big muddy: a meta-synthesis of the research on the social impact of dams. Environ Impact Assess 60 (Supplement C):115–125. https://doi.org/10.1016/j.eiar.2016.02.007

    Article  Google Scholar 

  • Kirchherr J, Disselhoff T, Charles K (2016b) Social safeguards, financing and social employment in Chinese infrastructure projects in Africa’s water sector: the case of Ghana’s Bui Dam. Waterlines 35(1):37–58. https://doi.org/10.3362/1756-3488.2016.005

    Article  Google Scholar 

  • Krueger L (2009) Protected areas and human displacement: improving the interface between policy and practice. Conserv Soc 7(1):21–25. https://doi.org/10.4103/0972-4923.54793

    Article  Google Scholar 

  • MacAndrews C (1994) Politics of environment in Indonesia. Asian Surv 4:376–377. https://doi.org/10.1525/as.1994.34.4.00p0385c

    Article  Google Scholar 

  • Mayring P (2000) Qualitative content analysis. http://www.qualitative-research.net/fqs-texte/2-00/2-00mayring-e.htm. Accessed 20 May 2016

  • McKenny B (2001) Economic valuation of livelihood income losses and other tangible downstream impacts from the Yali Falls Dam to the Se San River Basin in 65 Ratanakiri Province, Cambodia. Oxfam America, Phnom Penh, Cambodia

    Google Scholar 

  • Mettle M (2011) Forced resettlement in Ghana: the dam and the affected people. MPhil. Thesis. Department of Geography, Faculty of Social Sciences and Technology Management, Norwegian University of Science and Technology (NTNU), Trondheim, Norway

  • ModernGhana (2009) Bui Dam resettlements: Livelihoods and institutional challenges. Available at https://www.modernghana.com/blogs/250005/31/bui-dam-resettlements-livelihoods-and-institutiona.html. Accessed on 29 Sept 2017

  • Nüsser M (2003) Political ecology of large dams: a critical review. Petermann Geogr Mitt 147(1):20–27

    Google Scholar 

  • Obour PB, Owusu K, Agyeman AE, Ahenkan A, Madrid NÀ (2016) The impacts of dams on local livelihoods: a study of the Bui Hydroelectric Project in Ghana. Int J Water Resour Dev 32(2):286–300. https://doi.org/10.1080/07900627.2015.1022892

    Article  Google Scholar 

  • Okuku EO, Bouillon S, Ochiewo JO, Munyi F, Kiteresi LI, Tole M (2016) The impacts of hydropower development on rural livelihood sustenance. Int J Water Resour Dev 32(2):267–285. https://doi.org/10.1080/07900627.2015.1056297

    Article  Google Scholar 

  • Opare J, Wrigley-Asante C (2008) Assessment of Gender and Agricultural Development Strategy (GADS) Report. Ministry of Food and Agriculture, Accra

    Google Scholar 

  • Owusu K, Obour PB, Nkansah MA (2017) Downstream effects of dams on livelihoods of river-dependent communities: the case of Ghana’s Kpong Dam. Geografisk Tidsskrift 117(1):1–10. https://doi.org/10.1080/00167223.2016.1258318

    Article  Google Scholar 

  • Pearse-Smith SWD (2012) The impact of continued Mekong Basin hydropower development on local livelihoods. Consilience J Sustain Dev 7(1):73–86

    Google Scholar 

  • Peluso NC (1992) Rich Forest, poor people: resources control and resistance in java. University of California Press, Berkeley. https://doi.org/10.1525/california/9780520073777.001.0001

    Book  Google Scholar 

  • Perreault T, Bridge G, McCarthy J (2015) The Routledge handbook of political ecology. Routledge, Abingdon and New York

    Book  Google Scholar 

  • Raschid-Sally L, Akoto-Danso EK, Kalitsi EAK, Ofori BD, Koranteng RT (2008) The resettlement experience of Ghana analyzed via case studies of the Akosombo and Kpong dams. In: Proceedings of the 9th Annual Symposium on Poverty Research, Colombo, Sri Lanka, 2 Dec 2008

  • Richter BD, Postel S, Revenga C, Scudder T, Lehner B, Churchill A, Chow M (2010) Lost in development’s shadow: the downstream human consequences of dams. Water Altern 3:14–42

    Google Scholar 

  • Rosenberg DM, McCully P, Pringle CM (2000) Global-scale environmental effects of hydrological alterations: introduction. Bioscience 50(9):746–751. https://doi.org/10.1641/0006-3568(2000)050[0746:GSEEOH]2.0.CO;2

    Article  Google Scholar 

  • Scudder T (2005) The future of large dams: dealing with social, environmental, institutional and political costs. Earthscan, London

    Google Scholar 

  • Sivongxay A, Greiner R, Garnett ST (2017) Livelihood impacts of hydropower projects on downstream communities in central Laos and mitigation measures. Water Resources and Rural Development 9 (Supplement C):46–55. https://doi.org/10.1016/j.wrr.2017.03.001

    Article  Google Scholar 

  • Stave J, Oba G, Stenseth NC, Nordal I (2005) Environmental gradients in the Turkwel riverine forest, Kenya: hypotheses on dam-induced vegetation change. Forest Ecol Manage 212:184–198. https://doi.org/10.1016/j.foreco.2005.03.037

    Article  Google Scholar 

  • Strobl E, Strobl RO (2011) The distributional impact of large dams: evidence from crop-land productivity in Africa. J Dev Econ 96(2):432–450. https://doi.org/10.1016/j.jdeveco.2010.08.005

    Article  Google Scholar 

  • Tan-Mullins M (2007) The state and its agencies in coastal resources management: the political ecology of fisheries management in Pattani, southern Thailand. Singap J Trop Geogr 28:348–361. https://doi.org/10.1111/j.1467-9493.2007.00314.x

    Article  Google Scholar 

  • Tan-Mullins M, Urban F, Mang G (2017) Evaluating the behaviour of Chinese Stakeholders engaged in large hydropower projects in Asia and Africa. China Q 230:464–488. https://doi.org/10.1017/S0305741016001041

    Article  Google Scholar 

  • Tchotsoua M, Moussa A, Fotsing JM (2008) The socio-economic downstream impact of large dams: a case study from an evaluation of flooding risks in the Benue River Basin Downstream of the Lagdo Dam (Cameroon). GEFAME J Afr Stud 5(1):16–19. http://hdl.handle.net/2027/spo.4761563.0005.101

  • Tilt B, Braun Y, He D (2009) Social impacts of large dam projects: a comparison of international case studies and implications for best practice. J Environ Manage 90:S249–S257. https://doi.org/10.1016/j.jenvman.2008.07.030

    Article  Google Scholar 

  • Tongco M (2007) Purposive sampling as a tool for informant selection. Ethnobot Res Appl 158(2007):147–158. https://doi.org/10.17348/era.5.0.147-158

    Article  Google Scholar 

  • Tsikata D (2006) Living in the shadow of the large dams: long term responses of downstream and lakeside communities of Ghana Volta river project. Brill Academic Publishers, Leiden

    Google Scholar 

  • WCD (2000) Dams and development: a new framework for decision making. Earthscan Publications, London

    Google Scholar 

  • Yankson PWK, Asiedu AB, Owusu K, Urban F, Siciliano G (2017) The livelihood challenges of resettled communities of the Bui Dam project in Ghana and the role of Chinese dam-builders. Dev Policy Rev. https://doi.org/10.1111/dpr.12259

    Article  Google Scholar 

  • Yankson PW, Owusu K, Asiedu AB (2018) The environmental and social governance of the Bui Dam project in Ghana. In: Siciliano G, Urban F (eds) Chinese hydropower development in Africa and Asia: challenges and opportunities for sustainable global dam-building. Routledge, Taylor and Francis, London

    Google Scholar 

Download references

Acknowledgements

The authors would like to thank the Office of Research, Innovation and Development (ORID), University of Ghana (UG) for offering support [Grant Number URF/7/ILG-040/2013-2014] through the 7th UG Research call to support the field work that resulted in the production of this paper.

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Kwadwo Owusu or Yaw Agyeman Boafo.

Ethics declarations

Conflict of interest

The authors declare that they have no conflict of interest.

Additional information

Handled by Siddharth Sareen, University of Bergen, Norway.

Electronic supplementary material

Below is the link to the electronic supplementary material.

Supplementary material 1 (DOCX 14 kb)

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Owusu, K., Asiedu, A.B., Yankson, P.W.K. et al. Impacts of Ghana’s Bui dam hydroelectricity project on the livelihood of downstream non-resettled communities. Sustain Sci 14, 487–499 (2019). https://doi.org/10.1007/s11625-018-0588-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11625-018-0588-8

Keywords

Navigation