Skip to main content
Log in

Deviation correction strategy for the earth pressure balance shield based on shield-soil interactions

  • Research Article
  • Published:
Frontiers of Mechanical Engineering Aims and scope Submit manuscript

Abstract

The control system presently used in shield posture rectification is based on driver experience, which is marginally reliable. The study of the related theory is flawed. Therefore, a decision-making approach for the deviation correction trajectory and posture rectification load for an earth pressure balance (EPB) shield is proposed. A calculation model of posture rectification load of an EPB shield is developed by considering the interactions among the cutter head, shield shell, and ground. The additional position change during the shield attitude correction is highlighted. The posture rectification loads and shield behaviors results can be solved by the proposed method. The influences of the stratum distribution (i.e., bedrock height in the upper-soft and lower-hard strata) on shield behaviors and posture rectification loads are analyzed. Results indicated that the increase of pitch angle in the upper-soft and lower-hard strata causes a sharp rise in vertical displacement. The bedrock height increases the magnitudes of the required posture rectification moments when hr/D > 0.5. For a tunnel with hr/D ≼ 0.5, the variation of hr/D has little effect on the posture rectification moments. Finally, the posture rectifying curves based on the theoretical model are compared with the target ones based on the double circular arc interpolation method. The required results can be obtained regardless of the soil-rock compound stratum distribution. The maximum rectification moment in the rock layer is almost 12.6 times that in the soil layer. Overall, this study provides a valuable reference for moment determination and the trajectory prediction of posture rectification in compound strata.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Abbreviations

a e :

Gradient of the ground reaction curve

c :

Soil cohesive force

C :

A dimensionless parameter of CSM model

d :

Wedge amount of the segment

D :

Shield diameter

F 1 :

Shield gravity

F 2 :

Reaction force of the tail brush on the inner shield surface

F 3 :

Thrust from jacks

F 4 :

Force acting on the cutter head

F 5 :

Force acting on the shield shell

F n :

Normal resistance forces of a single disc cutter

FM 1, FM 2 :

Moments induced by the penetration resistance and earth pressure, respectively

FM 21, FM 22 :

Moments caused by the later pressure of soil on the cutter head and rock on the cutter head, respectively

G :

Gravity of a shield machine

h :

Buried depth of the rock-soil interface

h r :

Height of the bedrock in the tunnel face

H :

Buried depth of the tunnel center

k :

Number of segments

k e :

Coefficient of the subgrade reaction

K e,ij :

Coefficient of earth pressure for an element

K e0, K e max, K e min :

Initial, passive, and active earth pressure coefficients, respectively

l :

Segment length

l s :

Gravity eccentric distance

L :

Shield length

L dev :

Deviation correction mileage

m, n :

Numbers of elements along the length and the ring direction of shield, respectively

M lv :

Moment with respect to the shield center induced by the eccentric gravity

M 4v :

Moment with respect to the shield center on the vertical plane caused by the force acting on the cutter head

M 5h :

Moment with respect to the shield center on the horizontal plane induced by pressure on the shield shell

M 5v :

Moment with respect to the shield center on the vertical plane induced by pressure on the shield shell

\(M_{\rm{h}}^\alpha ,M_{\rm{v}}^\beta \) :

Moments for posture rectification in the horizontal and vertical plane generated by the thrust, respectively

n r :

Number of disc cutters

p :

Penetration per revolution

P 0 :

Pressure of the broken zone

R :

Disc cutter radius

R c :

Radius of the shield shell

R rec :

Radius of deviation correction curve

s e :

Axis deviation in the horizontal (e = h) or the vertical (e = v) direction

s :

Vertical subsidence of the circle center induced by the shield gravity

s v, ∆s h :

Vertical and horizontal displacements of the circle center, respectively

S :

Spacing between disc cutters

t :

Tip width of a disc cutter

U e,ij :

Ground displacement of each element

y i :

Target deviation correction amount at the ring

z ij :

Position on the shell of each element

α :

Yawing angle

β :

Pitch angle

γ 1, γ 2 :

Unit weights of soil and rock, respectively

δ h, δ v :

Horizontal and vertical displacements of the circle center caused by posture rectification, respectivley

η :

Opening ratio of cutterhend

η dev :

The angle of the shield and positive z-axis

η i1 :

Angle of the shield down from the z-axis at the deviation correction segment

λ 1, λ 2 :

Later pressure coefficients of soil and rock, respectively

σ c :

Uniaxial compressive strength

σ e0,ij :

Initial pressure of each element

σ h,ij, σ v,ij :

Horizontal and vertical pressures of each element, respectively

σ n :

Normal pressure on the shield shell

σ t :

Tensile strength

φ :

Internal friction angle of soil

Φ:

Contact angle between the rock and disc cutter

ψ :

A model parameter of CSM model

ω 1 :

Central angle of the first circular arc with a center of O1

ω 2 :

Central angle of the second circular arc with a center of O2

References

  1. Liu X Y, Shao C, Ma H F, Liu R X. Optimal earth pressure balance control for shield tunneling based on LS-SVM and PSO. Automation in Construction, 2011, 20(4): 321–327

    Article  Google Scholar 

  2. Tang X Q, Deng K S, Wang L P, Chen X. Research on natural frequency characteristics of thrust system for EPB machines. Automation in Construction, 2012, 22: 491–497

    Article  Google Scholar 

  3. Shao C, Lan D S. Optimal control of an earth pressure balance shield with tunnel face stability. Automation in Construction, 2014, 46: 22–29

    Article  Google Scholar 

  4. Li X G, Yuan D J. Development of the safety control framework for shield tunneling in close proximity to the operational subway tunnels. SpringerPlus, 2016, 5(1): 527

    Article  Google Scholar 

  5. Lin S S, Shen S L, Zhang N, Zhou A. Modelling the performance of EPB shield tunnelling using machine and deep learning algorithms. Geoscience Frontiers, 2021, 12(5): 101177

    Article  Google Scholar 

  6. Zhang P, Chen R P, Wu H N. Real-time analysis and regulation of EPB shield steering using random forest. Automation in Construction, 2019, 106: 102860

    Article  Google Scholar 

  7. Koopialipoor M, Nikouei S S, Marto A, Fahimifar A, Jahed Armaghani D, Mohamad E T. Predicting tunnel boring machine performance through a new model based on the group method of data handling. Bulletin of Engineering Geology and the Environment, 2019, 78(5): 3799–3813

    Article  Google Scholar 

  8. Elbaz K, Shen S L, Sun W J, Yin Z Y, Zhou A. Prediction model of shield performance during tunnelling via incorporating improved particle swarm optimization into ANFIS. IEEE Access: Practical Innovations, Open Solutions, 2020, 8: 39659–39671

    Article  Google Scholar 

  9. Elbaz K, Shen S L, Zhou A, Yin Z Y, Lyu H M. Prediction of disc cutter life during shield tunneling with AI via the incorporation of a genetic algorithm into a GMDH-type neural network. Engineering, 2021, 7(2): 238–251

    Article  Google Scholar 

  10. Yan T, Shen S L, Zhou A, Lyu H M. Construction efficiency of shield tunnelling through soft deposit in Tianjin, China. Tunnelling and Underground Space Technology, 2021, 112: 103917

    Article  Google Scholar 

  11. Yang J P, Chen W Z, Zhao W S, Tan X J, Tian H M, Yang D S, Ma C S. Geohazards of tunnel excavation in interbedded layers under high in situ stress. Engineering Geology, 2017, 230: 11–22

    Article  Google Scholar 

  12. Berthoz N, Branque D, Wong H, Subrin D. TBM soft ground interaction: experimental study on a 1 g reduced-scale EPBS model. Tunnelling and Underground Space Technology, 2018, 72: 189–209

    Article  Google Scholar 

  13. Baghban Golpasand M R, Do N A, Dias D. Impact of pre-existent Qanats on ground settlements due to mechanized tunneling. Transportation Geotechnics, 2019, 21: 100262

    Article  Google Scholar 

  14. Moeinossadat S R, Ahangari K. Estimating maximum surface settlement due to EPBM tunneling by numerical-intelligent approach—a case study: Tehran subway line 7. Transportation Geotechnics, 2019, 18: 92–102

    Article  Google Scholar 

  15. Zheng G, Tong J B, Zhang T Q, Wang R K, Fan Q, Sun J B, Diao Y. Experimental study on surface settlements induced by sequential excavation of two parallel tunnels in drained granular soil. Tunnelling and Underground Space Technology, 2020, 98: 103347

    Article  Google Scholar 

  16. Liu Z Y, Xue J F, Ye J Z, Qian J G. A simplified two-stage method to estimate the settlement and bending moment of upper tunnel considering the interaction of undercrossing twin tunnels. Transportation Geotechnics, 2021, 29: 100558

    Article  Google Scholar 

  17. Shirlaw J N. Pressurised TBM tunnelling in mixed face conditions resulting from tropical weathering of igneous rock. Tunnelling and Underground Space Technology, 2016, 57: 225–240

    Article  Google Scholar 

  18. Labra C, Rojek J, Oñate E. Discrete/finite element modelling of rock cutting with a TBM disc cutter. Rock Mechanics and Rock Engineering, 2017, 50(3): 621–638

    Article  Google Scholar 

  19. Smolnicki T, Pçkalski G, Jakubik J, Harnatkiewicz P. Investigation into wear mechanisms of the bearing raceway used in bucket wheel excavators. Archives of Civil and Mechanical Engineering, 2017, 17(1): 1–8

    Article  Google Scholar 

  20. Ghorbani S, Kopilov V V, Polushin N I, Rogov V A. Experimental and analytical research on relationship between tool life and vibration in cutting process. Archives of Civil and Mechanical Engineering, 2018, 18(3): 844–862

    Article  Google Scholar 

  21. Macias F J, Nærland J, Espallargas N. Cutter wear mechanisms in hard rock tunnel boring. Geomechanics and Tunnelling, 2018, 11(2): 123–130

    Article  Google Scholar 

  22. Tóth Á, Gong Q M, Zhao J. Case studies of TBM tunneling performance in rock—soil interface mixed ground. Tunnelling and Underground Space Technology, 2013, 38: 140–150

    Article  Google Scholar 

  23. Ma H, Yin L, Gong Q, Wang J. TBM tunneling in mixed-face ground: problems and solutions. International Journal of Mining Science and Technology, 2015, 25(4): 641–647

    Article  Google Scholar 

  24. Wang L T, Yang X, Gong G F, Du J. Pose and trajectory control of shield tunneling machine in complicated stratum. Automation in Construction, 2018, 93: 192–199

    Article  Google Scholar 

  25. Zhou C, Xu H C, Ding L Y, Wei L C, Zhou Y. Dynamic prediction for attitude and position in shield tunneling: a deep learning method. Automation in Construction, 2019, 105: 102840

    Article  Google Scholar 

  26. Mo H H, Chen J S. Study on inner force and dislocation of segments caused by shield machine attitude. Tunnelling and Underground Space Technology, 2008, 23(3): 281–291

    Article  Google Scholar 

  27. Liu W, Zhao T S, Zhou W, Tang J J. Safety risk factors of metro tunnel construction in China: an integrated study with EFA and SEM. Safety Science, 2018, 105: 98–113

    Article  Google Scholar 

  28. Zhang N, Zhang N, Zheng Q, Xu Y S. Real-time prediction of shield moving trajectory during tunnelling using GRU deep neural network. Acta Geotechnica, 2021

  29. Zhu B D, Gong G F, Shi H. Electrohydraulic control of thrust hydraulic system for shield tunneling machine. In: Xie M, Xiong Y, Xiong C, Liu H, Hu Z, eds. Intelligent Robotics and Applications. ICIRA 2009. Lecture Notes in Computer Science, vol 5928. Berlin: Springer, 2009, 482–492

    Google Scholar 

  30. Luo L W, Wang S C, Wang X. Fuzzy control technique in tunneling process of shield machine. Machinery Design & Manufacture, 2010, 3: 125–126 (in Chinese)

    Google Scholar 

  31. Feng H H, Chen K, Zhang B. Application and forecasting of fuzzy control technology in shield tunneling. Tunnel Construction, 2012, 32(S2): 51–55 (in Chinese)

    Google Scholar 

  32. Hu X T, Huang Y A, Yin Z P, Xiong Y L. Driving force planning in shield tunneling based on Markov decision processes. Science China Technological Sciences, 2012, 55(4): 1022–1030

    Article  Google Scholar 

  33. Yue M, Guo L. Double closed-loop adaptive rectification control of a shield tunneling machine with hydraulic actuator dynamics subject to saturation constraint. Journal of Vibration and Control, 2016, 22(2): 309–319

    Article  MATH  Google Scholar 

  34. Wang P, Kong X G, Guo Z K, Hu L. Prediction of axis attitude deviation and deviation correction method based on data driven during shield tunneling. IEEE Access: Practical Innovations, Open Solutions, 2019, 7: 163487–163501

    Article  Google Scholar 

  35. Sugimoto M, Sramoon A. Theoretical model of shield behavior during excavation. I: theory. Journal of Geotechnical and Geoenvironmental Engineering, 2002, 128(2): 138–155

    Google Scholar 

  36. Sugimoto M, Sramoon A, Konishi S, Sato Y. Simulation of shield tunneling behavior along a curved alignment in a multilayered ground. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133(6): 684–694

    Article  Google Scholar 

  37. Shen S L, Du Y J, Luo C Y. Evaluation of the effect of rolling correction of double-o-tunnel shields via one-side loading. Canadian Geotechnical Journal, 2010, 47(10): 1060–1070

    Article  Google Scholar 

  38. Hu X T, Huang Y A, Yin Z P, Xiong Y L. Optimization-based model of tunneling-induced distributed loads acting on the shield periphery. Automation in Construction, 2012, 24: 138–148

    Article  Google Scholar 

  39. Festa D, Broere W, Bosch J W. Kinematic behaviour of a tunnel boring machine in soft soil: theory and observations. Tunnelling and Underground Space Technology, 2015, 49: 208–217

    Article  Google Scholar 

  40. Festa D, Broere W, Bosch J W. An investigation into the forces acting on a TBM during driving-mining the TBM logged data. Tunnelling and Underground Space Technology, 2012, 32: 143–157

    Article  Google Scholar 

  41. Festa D, Broere W, Bosch J. Tunnelling in soft soil: tunnel boring machine operation and soil response. In: Proceedings of International Symposium on Tunnelling and Underground Space Construction for Sustainable Development. Seoul, 2013, 117–120

  42. Shen X, Yuan D J, Jin D L. Influence of shield attitude change on shield-soil interaction. Applied Sciences, 2019, 9(9): 1812

    Article  Google Scholar 

  43. Zhang Z Q, Yan Q S, Zheng Z D, Chen S B. Error estimate of approximate double circular arc interpolated method for curve smoothing. Materials Science Forum, 2004, 471–472: 92–95

    Article  Google Scholar 

  44. Rostami J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. Dissertation for the Doctoral Degree. Golden: Colorado School of Mines, 1997

    Google Scholar 

  45. Sramoon A, Sugimoto M. Development of a ground reaction curve for shield tunneling. In: Proceedings of International Symposium Geotechnical Aspects of Underground Construction in Soft Ground. Rotterdam, 1999, 437–442

  46. Terzaghi K. Stress distribution in dry and in saturated sand above a yielding trap-door. In: Proceedings of the 1st International Conference on Soil Mechanics and Foundation Engineering. Cambridge, 1936, 1: 307–311

    Google Scholar 

Download references

Acknowledgements

This work was supported by the National Key R&D Program of China (Grant No. 2018YFC1505304), the National Major Scientific Instruments Development Project of China (Grant No. 41627801), the State Key Program of National Natural Science Foundation of China (Grant No. 41731288), and the Open Research Fund Program of State Key Laboratory of Permafrost Engineering of China (Grant No. SKLFSE202015).

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Xiangxun Kong or Xianzhang Ling.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Tang, L., Kong, X., Ling, X. et al. Deviation correction strategy for the earth pressure balance shield based on shield-soil interactions. Front. Mech. Eng. 17, 20 (2022). https://doi.org/10.1007/s11465-022-0676-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s11465-022-0676-4

Keywords

Navigation