Abstract
For assemble-to-order enterprises, both order scheduling and mixed-model sequencing need to be taken into consideration in the formulation of order-oriented assembly plan. First, determining production priority for the received orders, and then conducting assembly sequence to the mixed-model products in each order. Order scheduling is aimed to ensure order delivery with the optimization goal of minimal total overdue time, while product sequencing is aimed to minimize the makespan so as to meet the requirement on completion time of the order. In the end, the paper establishes a mixed integer programming model based on an industrial case, and makes programming calculation with Xpress-MP to accomplish an order-oriented assembly plan conforming to actual production.
Similar content being viewed by others
References
Neidigh R O, Harrison T P. Optimizing lot sizing and order scheduling with non-linear production rates. International Journal of Production Research, 2010, 48(8): 2279–2295
Hazır O, Gunalay Y, Erel E. Customer order scheduling problem: a comparative metaheuristics study. International Journal of Advanced Manufacturing Technology, 2008, 37(5–6): 589–598
Erel E, Ghosh J B. Customer order scheduling on a single machine with family setup times: complexity and algorithms. Applied Mathematics and Computation, 2007, 185(1): 11–18
Hsu S Y, Liu C H. Improving the delivery efficiency of the customer order scheduling problem in a job shop. Computers and Industrial Engineering, 2009, 57(3): 856–866
Finch B J, Luebbe R L. Response to ‘theory of constraints and linear programming: a re-examination’. International Journal of Production Research, 2000, 38(6): 1465–1466
Mosadegh H, Zandieh M, Ghomi S. Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines. Applied Soft Computing, 2012, 12(4): 1359–1370
Fattahi P, Beitollahi Tavakoli N, Fathollah M, Roshani A, Salehi M. Sequencing mixed-model assembly lines by considering feeding lines. International Journal of Advanced Manufacturing Technology, 2012, 61(5–8): 677–690
Bautista J, Cano A. Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules. European Journal of Operational Research, 2011, 210(3): 495–513
Giard V, Jeunet J. Optimal sequencing of mixed models with sequence-dependent setups and utility workers on an assembly line. International Journal of Production Economics, 2010, 123(2): 290–300
Drexl A, Kimms A, Matthiessen L. Algorithms for the car sequencing and the level scheduling problem. Journal of Scheduling, 2006, 9(2): 153–176
Mansouri S A. A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. European Journal of Operational Research, 2005, 167(3): 696–716
De Lit P, Latinne P, Rekiek B, Delchambre A. Assembly planning with an ordering genetic algorithm. International Journal of Production Research, 2001, 39(16): 3623–3640
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Wang, B., Guan, Z., Chen, Y. et al. An assemble-to-order production planning with the integration of order scheduling and mixed-model sequencing. Front. Mech. Eng. 8, 137–145 (2013). https://doi.org/10.1007/s11465-013-0251-0
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11465-013-0251-0