Mathematical Models of Inter-plant Economical Operation of a Cascade Hydropower System in Electricity Market

  • Published:
Water Resources Management Aims and scope Submit manuscript

Abstract

Regional operation of the electricity market has begun in China. With the development of China’s market economy, hydropower will enter the arena of bidding for connection to the grid in light of “fair, impartial and open” principles. For the electricity market, the solution of an inter-plant economical operation of a cascade hydropower system is extremely important. If a hydropower company is incapable of predicting the generation capability and the amount of generation of hydropower stations as well as the risk-rate corresponding to various generation amounts, then there is no information available to the hydropower company to refer to when it makes future agreements in a certain period. This paper develops mathematical models of (1) total minimum stored energy consumption and (2) total minimum water consumption for a cascade hydropower system. The models provide a solution to the problem of rational distribution of next-day’s generating schedule in a cascade hydropower system awarded a contract in the bidding for connection to the grid. A case study is conducted to verify the effectiveness and applicability of the methodology.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Bi Y-X, Li Z-H (2004) Corporate reform and restructuring of China largest hydro power enterprise. In: Innovation and entrepreneurship for sustainable development, Proceedings of IEEE international engineering management conference, vol 1, 18–21, Singapore, Oct 2004, pp 158–162

  • Birger M, Anders G, Asbjorn G (2001) Integrated risk management of hydro power scheduling and contract management. IEEE Trans Power Syst 16(2):216–221. doi:10.1109/59.918289

    Article  Google Scholar 

  • Cabero J, Baillo A, Cerisola S, Ventosa M, Garcia-Alcalde A, Peran F, Relano G (2005) A medium-term integrated risk management model for a hydrothermal generation company. IEEE Trans Power Syst 20(3):1379–1388. doi:10.1109/TPWRS.2005.851934

    Article  Google Scholar 

  • Candelliere A, Giuliano G, Nicolosi V, Tossi G (2003) Optimal short-term operation of a multipurpose reservoir system under limited water supply. In: Blöschl G, Franks S, Kumagai M, Musiake K, Rosbjerg D (eds) Water resources system-hydrological risk, management and development, IAHS Publication No. 281, Wallingford, U.K., pp 200–207

  • Chen S-L (2001) Study of basic theories and automation system of reservoir group. Dissertation, Wuhan University, Wuhan, China

  • Cheng C-T, Wang B-D, Chen S-Y, Tan P-L, Gu N-C, Zhong Z-Y (1997) Fuzzy optimal model for the flood control system of upper and middle reaches of the Yangtze River. J Hydraul Eng (2):72–76

  • Cheng C-T, Wang W-C, Xu D-M, Chau K-W (2008) Optimizing hydropower reservoir operation using hybrid genetic algorithm and chaos. Water Resour Manage 22(7):895–909. doi:10.1007/s11269-007-9200-1

    Article  Google Scholar 

  • Conejo AJ, Arroyo JM, Contreras J, Villamor FA (2002) Self-scheduling of a hydro producer in a pool-based electricity market. IEEE Trans Power Syst 17(4):1265–1272. doi:10.1109/TPWRS.2002.804951

    Article  Google Scholar 

  • Huang Y-H, Shang J-C, Kang C-Q, Xia Q, Meng Y-J, He N-Q (2003) Operation mechanism and models of day-ago transaction market of electric power. Autom Electric Power Syst 27(3):23–27

    Google Scholar 

  • Li J-Q, Zhang Y-S, Wang L-P, Ji C-M (2005) Study on power generation risk dispatching of hydropower station under market environment. J Hydroelectric Eng 78(5):1–4

    Google Scholar 

  • Li J-Q, Zhang Y-S, Wang L-P, Ji C-M (2006) Mid-and-long-term risk dispatching of hydropower system based on set-pair analysis theory. J China Hydrol 26(4):21–26

    Google Scholar 

  • Lund JR, Guzman J (1999) Some derived operating rules for reservoirs in series or in parallel. J Water Resour Plann Manag-ASCE 125(3):143–153

    Article  Google Scholar 

  • Mei Y-D, Zhu J-X (2000) Short-term optimal operation model for the cascade hydroelectric stations on the upper Yellow River and its solution. J Hydroelectric Eng 69(2):1–7

    Google Scholar 

  • Rafal W (2000) Energy price risk management. Physica A: Statistical Mechanics and its Applications 285(1–2):127–134

    Google Scholar 

  • Scott T-J, Read E-G (1996) Modeling hydro reservoir operation in a deregulated electricity market. Int Trans Opt Res 3(3):243–253. doi:10.1111/j.1475-3995.1996.tb00050.x

    Article  Google Scholar 

  • Shawwash ZK, Siu T, Russell SO (2001) The B. C. hydro short term scheduling optimization model. IEEE Trans Power Syst 15(3):1125–1131. doi:10.1109/59.871743

    Article  Google Scholar 

  • Wang Y-M (2002) Open up a new prospect for hydropower dispatching. Hydropower Autom Dam Monit 26(3):1–3

    Google Scholar 

  • Wang J-W, Fan X-H, Zhang Y-C, Zhang S-Q, Yue Y-H (2003a) Maximal electricity model of short-term peak regulation of large scale hydropower system and its Solution. Autom Electric Power Syst 27(15):29–34

    Google Scholar 

  • Wang Z, Lei X-M, Zhou S-X, Chen X-Q, Pei Z-Y, Shu Y-B, He G-Y (2003b) Optimal dispatch system and algorithm of three gorges power market. Autom Electric Power Syst 27(6):42–46

    Google Scholar 

  • Yuksek O, Komurcu MI, Yuksel I, Kaygusuz K (2006) Hydroelectric power: a key potential in meeting the long term electric energy demand of Turkey. J Energy Policy 34(17):3093–30103. doi:10.1016/j.enpol.2005.06.005

    Article  Google Scholar 

  • Yüksel I (2007) Development of hydropower: a case study in developing countries. Journal of Energy Sources, Part B Econ Plann Policy 2(2):113–121

    Article  Google Scholar 

  • Yüksel I (2008) Hydropower in Turkey for a clean and sustainable energy future. Renew Sustain Energ Rev 12(6):1622–1640

    Article  Google Scholar 

  • Zambelli M, Siqueira TG, Cicogna M, Soares S (2006) Deterministic versus stochastic models for long term hydrothermal scheduling. In: Proceedings of power engineering society, 2006 IEEE general meeting, Montreal, Canada, 18–22 June 2006

  • Zhang Y-G (1994) Day optimization operation of hydropower plant group in power system. Huazhong Univ. of Science & Technology Press, Wuhan, China

    Google Scholar 

  • Zhang Y-S (2004) Study on theory and application to the economical operation of hydropower in electricity market. Dissertation, Wuhan University, Wuhan, China

    Google Scholar 

  • Zhao Y-L, Chang X-Q (2003) Study of hydropower dispatch in power market context. China Electric Power 33(11):62–64

    Google Scholar 

  • Zhao Z-L, Xin Y-Z, Guo G-C (eds) (2001) Operation system of electric power market, China Electric Power Press, Beijing, China

    Google Scholar 

  • Zhu C-J, Zhou J-Z, Yang J-J, Wu W (2006) Optimal scheduling of hydropower plant with uncertainty energy price risks. In: Proceedings of 2006 int. conf. on power system technology, Chongqing, China, 22–26 Oct 2006

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ji-Qing Li.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Li, JQ., Mariño, M.A., Ji, CM. et al. Mathematical Models of Inter-plant Economical Operation of a Cascade Hydropower System in Electricity Market. Water Resour Manage 23, 2003–2013 (2009). https://doi.org/10.1007/s11269-008-9365-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11269-008-9365-2

Keywords

Navigation