Abstract
In dam safety assessment, it is customary to focus on stability analysis, and the safety factor is regarded as an assessment index that cannot correctly reflect the effect of multi-factors and variable uncertainty. The factors that induce dam breaks are complex and uncertain; however, three primary ones can be identified: hydrological factors, seepage and bank slope instability. In this paper, the risk probability and the dam break threshold value for each factor individually, as well as coupled factors, are studied. The threshold value is acquired using the relationship formula between risk probability and dam type. The Dongwushi reservoir located in the Hebei province of China is taken as a case study. The results show that the dam break threshold values for hydrological factors, seepage and bank slope instability are 2.53, 2.02 and 2.69, respectively. The integrated dam break threshold value for the coupled factors is 1.25, which indicates that the dam is under serious stress according to the established risk assessment standard. The safety factor is calculated as 1.15 using the Bishop method, which indicates that the dam is under serious stress. The results obtained by the proposed method are consistent with those of the Bishop method. Finally, the proposed theory and method are introduced into a dam safety evaluation system (DSES) for convenient and efficient dam safety management.
Similar content being viewed by others
References
ANCOLD (1994) Guidelines on risk assessment. Australian committee on large dams, Sydney
ANCOLD (2003) Guidelines on risk assessment. Australian committee on large dams, Sydney
Bishop AW (1955) The use of the slip circle in the stability analysis of slope. Géotechnique Lond 5(1):7–17
Chadwick WL (1976) Chairman of independent peal to review cause of Teton dam, failure of Teton dam. Report to US Department of the Interior and State of Idaho, Idaho
Chowdhury RN, Xu DW (1995) Geotechnical system reliability of slopes. Reliab Eng Syst Saf 47(3):141–151
Colomer Mendoza FJ, Gallardo Izquierdo A (2009) Environmental risk index: a tool to assess the safety of dams for leachate. J Hazard Mat 162(1):1–9
Day RW, Maksimovic M (1994) Stability of compacted clay slopes using a nonlinear failure envelope. Bull As Eng Geol 31(4):516–520
Duncan JM (1996) State of the art: limit equilibrium and finite-element analysis of slopes. J Geotech Engrg ASCE 122(7):577–596
Foster M, Fell R, Spannagle M (2000a) Method for assessing the relative likelihood of failure of embankment dams by piping. Can Geotech J 37(5):1025–1061
Foster M, Fell R, Spannagle M (2000b) Statistics of embankment dam failures and accidents. Can Geotech J 37(5):1000–1024
GB50199-94 (1994) Unified design standard for reliability of hydraulic engineering structures[S]. China Planning Press, Beijing
Gui SX, Zhang RD, Turner JP, Xue XZ (2000) Probabilistic slope stability analysis with stochastic soil hydraulic conductivity. J Geotech Geoenviron Eng 126(1):1–9
Hartford DND, Baecher GB (2004) Risk and uncertainty in dam safety. Thomas Telford Publishing, London
ICOLD (1973) Lessons from dam incidents. Reduced edition. International Commission on Large Dams (ICOLD), Pairs
ICOLD (1998) ICOLD guidelines on risk assessment for dams. Attachment by: Williams, A.: ICOLD chairman’s 1997/1998 progress report for New Delhi meeting, vol 11, pp 1–28
Kuo JT, Yen BC, Hsu YC, Lin HF (2007) Risk analysis for dam overtopping—Feitsui reservoir as a case study. J hydraul Eng ASCE 133(8):955–963
Kwon HH, Moon YI (2006) Improvement of overtopping risk evaluations using probabilistic concepts for existing dams. Stochast Environ Res Risk Assess 20(4):223–237
Liu R (1992) Hydraulics. Hohai University Press, Nanjing
Ma R (2004) Risk analysis method for embankment dam and its application. Science Press, Beijing
Rico M, Benito G, Salgueiro AR, Díez-Herrero A, Pereira HG (2008) Reported tailings dam failures: a review of the European incidents in the worldwide context. J Hazard Mat 152(2):846–852
Sacks J, Welch WJ, Mitchell TJ, Wynn HP (1989) Designs and analysis of computer experiments (with discussion). Statist Sci 4(4):409–435
Shuhai J, Ziwu F (2008) Earth-rockfill dam safety classification and risk rate assessment on flood control. J Hydraul Eng 39(1):35–40
SL 258-2000 (2000) Guidelines on dam safety evaluation. China Water Power Press, Beijing
Wang Z, Zhang Z, Yang G (1998) Risk calculation model for flood levee structure. J Hydraul Eng 29(7):64–67
Zeng Y, Hu M, Liang Z (2003) Threshold value and risk analysis for flood control system. Eng J Wuhan Uni 36(6):27–30
Acknowledgments
The study was funded by National Basic Research Program of China (973 Program) (Grant no. 2007CB714101), the Innovative Research Groups of the National Natural Science Foundation of China (Grant no. 51021004), the Natural Science Fund of Tianjin City (08JCZDJC25400).
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Zhong, D., Sun, Y. & Li, M. Dam break threshold value and risk probability assessment for an earth dam. Nat Hazards 59, 129–147 (2011). https://doi.org/10.1007/s11069-011-9743-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11069-011-9743-6