Skip to main content
Log in

Analysis on the Influence of Dismantling Temporary Lining of Closely-Undercrossing Subway

  • Original Paper
  • Published:
Geotechnical and Geological Engineering Aims and scope Submit manuscript

Abstract

Due to the limited space in urban area, subway tunnels have to be designed and constructed with marginal clearance between each other. In the construction of subway tunnels, the installation and dismantling of temporary lining prone to affect the existing subway and new subway. In this paper, based on the Nijiaqiao Station Project in Chengdu Metro, stress state and deformation of the existing subway and the new subway, induced by dismantling of temporary lining, are compared and analyzed. It is found that different installation sequence of lining and dismantling temporary lining will affect the deformation of the subway, especially in the floor. The deformation and stress conditions of the structure are the least affected when all secondary linings are constructed in the first place and then all temporary linings are dismantled; and condition II is the worst and leads to excessive deformation and stress. Based on the analysis of the construction efficiency and influence of dismantling temporary lining, it is suggested that the combination form of divisional lining and dismantling temporary lining (i.e., condition III) can be adopted for the construction of closely-undercrossing subway. Finally, it is found that the field monitoring results are basically consistent with the simulation results, which verifies the validity of the numerical simulation. The results obtained in this paper can provide some vital references for the design and construction of similar projects (i.e., closely-undercrossing cases) in the future.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10

Similar content being viewed by others

Data Availability

All data, models, and code generated or used during the study appear in the submitted article.

References

Download references

Acknowledgements

This work was supported by the National Natural Science Foundation of China (Grant No.: 52178395).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Gongning Liu.

Ethics declarations

Conflict of interest

The authors declare that they have no conflict of interest.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zhang, H., Liu, G., Liu, W. et al. Analysis on the Influence of Dismantling Temporary Lining of Closely-Undercrossing Subway. Geotech Geol Eng 41, 3189–3202 (2023). https://doi.org/10.1007/s10706-023-02452-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10706-023-02452-2

Keywords

Navigation