The intact rock properties and discontinuity properties for both DRC and DP rock formations that exist in the selected open pit mine were determined from tests conducted on rock samples collected from the mine site. Special survey equipment which has a total station, laser scanner and a camera was used to perform remote fracture mapping in the research area selected at the mine site. From remote fracture mapping data, the fracture orientation, spacing and density were calculated in a much refined way in this study compared to what exist in the literature. Discontinuity orientation distributions obtained through remote fracture mapping agreed very well with the results of manual fracture mapping conducted by the mining company. GSI rock quality system and Hoek–Brown failure criteria were used to estimate the rock mass properties combining the fracture mapping results with laboratory test results of intact rock samples. Fault properties and the DRC–DP contact properties were estimated based on the laboratory discontinuity test results. A geological model was built in a 3DEC model including all the major faults, DRC–DP contact, and two stages of rock excavation. The built major discontinuity system of 44 faults in 3DEC with their real orientations, locations and three dimensional extensions were validated successfully using the fault geometry data provided by the mining company using seven cross sections. Numerical modeling was conducted to study the effect of boundary conditions and lateral stress ratio on the stability of the considered rock slope. For the considered section of the rock slope, the displacements obtained through stress boundary conditions were seemed more realistic than that obtained through zero velocity boundary conditions (on all four lateral faces). Stable deformation distributions were obtained for k 0 in the range of 0.4–0.7. Because the studied rock mass is quite stable, it seems that an appropriate range for k 0 for this rock mass is between 0.4 and 0.7. The displacements occurred between July 2011 and July 2012 due to the nearby rock mass excavation that took place during the same period were compared between the field monitoring results available from the mining company and the predicted numerical modeling results; the best agreement was obtained for k 0  = 0.4. Therefore, k 0  = 0.4 can be decided as the most appropriate value for the studied mine site. In overall, the successful simulation of the rock excavation during a certain time period indicated the possibility of using the procedure developed in this study to investigate rock slope stability with respect to expected future rock excavations in mine planning.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
Fig. 17
Fig. 18

Similar content being viewed by others

References

  • Azizabadi HRM, Mansouri H, Fouche O (2014) Coupling of two methods, waveform superposition and numerical, to model blast vibration effect on slope stability in jointed rock masses. Comp Geotech 61:42–49

    Article  Google Scholar 

  • Behbahani SS, Moarefvand P, Ahangari K, Goshtasbi K (2013) Measuring displacement and contact forces among the particles in unloading of slope by PFC2D (particle flow code). Arch Min Sci 58(2):495–504

    Google Scholar 

  • Brummer KR, Li H, Moss A (2013) The transition from open pit to underground mining: an unusual slope failure mechanism at Palabora. International Symposium on Stability of Rock Slopes in Open Pit Mining and Civil Engineering, The South African Institute of Mining and Metallurgy

  • Cai M, Kaiser PK, Uno H, Tasaka Y, Minami M (2004) Estimation of rock mass deformation modulus and strength of jointed hard rock masses using the GSI system. Int J Rock Mech Min Sci 41:3–19

    Article  Google Scholar 

  • Chen JH, Kang LX, Yang SS (2007) Analysis of open pit slope under excavation unloading. Mine hazards prevention and control technology 311–317

  • Cundall PA (1988) Formulation of a three-dimensional distinct element model-Part 1. A scheme to detect and represent contacts in a system composed of many polyhedral blocks. Int J Rock Mech Min Sci Geomech Abstr 25:107–116

    Article  Google Scholar 

  • Firpo G, Salvini R, Francioni M, Ranjith GP (2011) Use of digital terrestrial photogrammetry in rocky slope stability analysis by distinct elements numerical methods. Int J of Rock Mech Min Sci 48:1045–1054

    Article  Google Scholar 

  • Fu YH, Dong LJ (2010) Range of rock movement in transition from open pit to underground mining determined by numerical method. Sci Tech Rev 28(4):74–79

    Google Scholar 

  • Gheibie S, Duzgun SHB (2013) Probabilistic-numerical modeling of stability of a rock slope in Amasya-Turkey. 47th US Rock Mechanics/Geomechanics Symposium, San Francisco, CA, USA

  • Hart R, Cundall PA, Lemos J (1988) Foundation of a three dimensional distinct element model-Part II. Mechanical calculations for motion and interaction of a system composed of many polyhedral blocks. Int J Rock Mech Min Sci Geomech Abstr 25:117–126

    Article  Google Scholar 

  • Hencher SR, Liao QH, Monaghan BG (1996) Modelling slope behaviour for open-pits. Trans Inst Min Metall Sect A-Min Ind 105:A37–A47

    Google Scholar 

  • Hoek E (2007) Practical rock engineering, Rocscience

  • Hoek E, Brown ET (1997) Practical estimates of rock mass strength. Int J Rock Mech Min Sci 34(8):1165–1186

    Article  Google Scholar 

  • Hoek E, Carranza-Torres CT, Corkum B (2002) Hoek–Brown failure criterion-2002 edition. In: Proceedings of the 5th North American Rock Mechanics Symposium, Toronto, Canada, 1: 267–273

  • Islam MR, Faruque MO (2013) Optimization of slope angle and its seismic stability: a case study for the proposed open pit coal mine in Phulbari, NW Bangladesh. J Mt Sci 10(6):976–986

    Article  Google Scholar 

  • Itasca (2007) 3DEC 3 Dimensional Distinct Element Code User’s Guide. Itasca Consulting Group Inc

  • Itasca (2009) FLAC 3D Fast Lagrangian Analysis of Continua in 3 Dimensions User’s Guide. Itasca Consulting Group Inc

  • Kulatilake PHSW, Wuthagala DN, Stephansson O (1993) Joint network modelling, including a validation to an area in strip mine, Sweden. Int J Rock Mech Min Sci 30(5):503–526

    Article  Google Scholar 

  • Kulatilake PHSW, Chen J, Teng J, Shufang X, Pan G (1996) Discontinuity geometry characterization for the rock mass around a tunnel close to the permanent shiplock area of the three gorges dam site in China. Int J Rock Mech Min Sci 33:255–277

    Article  Google Scholar 

  • Kulatilake PHSW, Um J, Wang M, Escandon RF, Narvaiz J (2003) Stochastic fracture geometry modeling in 3-D including validations for a part of arrowhead east tunnel site, California. USA. Int J Eng Geol 70(1–2):131–155

    Article  Google Scholar 

  • Kulatilake PHSW, Park J, Um J (2004) Estimation of rock mass strength and deformability in 3-D for a 30 m cube at a depth of 485 m at Aspo Hard Rock Laboratory. Geotech Geol Eng 22:313–330

    Article  Google Scholar 

  • Li H, Speight HE (1997) Analysis of progressive failure of a mine slope in a western Australian open-pit gold mine. Deform Progress Fail Geomech-IS-NAGOYA 97:467–472

    Google Scholar 

  • Li HZ, Yang TH, Xia D, Zheng C (2013) Slope stability analysis based on soft-rock rheological characteristics. J Northeast Univ Nat Sci 34(2):293–296

    Google Scholar 

  • Lorig L (1999) Lessons learned from slope stability studies. FLAC Numer Model Geomech 17–21

  • Meng HD, Xu Y, Zang DY (2013) The failure mode analysis of open pit slope based on finite element method. Appl Mech Mat 405–408:35–39

    Google Scholar 

  • Palmstrom A (1995) RMi-A rock mass characterization system for rock engineering purposes. Ph. D. thesis, University of Oslo, Norway

  • Ren GF, Fang XK (2010) Study on the law of the movement and damage to slope with the combination of underground mining and open-pit mining. Engineering 2(3):201–204

    Article  Google Scholar 

  • Sainsbury DP, Pierce ME, Lorig LJ (2003) Two and three-dimensional numerical analysis of the interaction between open pit slope stability and remnant underground voids. Fifth Large Open Pit Mine Conf: Harnessing Technol Manag Data Info 7:251–257

    Google Scholar 

  • Sainsbury DP, Pothitos F, Finn D, Silva R (2007) Three-dimensional discontinuum analysis of structurally controlled failure mechanism at the Cadia hill open pit. In: Proceedings of the international symposium on rock slope stability in open pit mining and civil engineering, Perth, Australian Centre for Geomechanics, 163–168

  • Shi GH (1988) Discontinuous deformation analysis—a new model for the statics and dynamics of block systems. Ph. D. thesis, University of California, Berkeley

  • Silva CHC, Lana MS, Pereira LC, Lopes MD (2008) Slope stability of Cachorro Bravo open pit through numerical modeling by finite element method. Rem-Revista Escola De Minas 61(3):323–327

    Article  Google Scholar 

  • Sjoberg J (1999) Analysis of the Aznalcollar pit slope failures-a case study. FLAC Numer Model Geomech 63–70

  • Tan WH, Kulatilake PHSW, Sun H (2014a) Influence of an inclined rock stratum on in situ stress state in an open-pit mine. Geotech Geol Eng 32(1):31–42

    Article  Google Scholar 

  • Tan WH, Kulatilake PHSW, Sun HB, Sun ZH (2014b) Effect of faults on in situ stress state in an open pit mine. Electron J Geotech Eng 19:9597–9629

    Google Scholar 

  • Wu JH, Chen CH (2011) Application of DDA to simulate characteristics of the Tsaoling landslide. Comp Geotech 38(5):741–750

    Article  Google Scholar 

  • Zarnani S, Sriskandakumar S, Arenson LU, Seto JCT (2012) The use of FLAC software for assessing deformation rates during ice excavation for open pit mining in glaciers. In: Proceedings of the 15th international specialty conference on cold Regions Engineering, ASCE, Quebec City, QC, Canada, 705–714

Download references

Acknowledgments

The support provided by the mining company through providing geological data, rock core and block samples and allowing access to the mine to perform field investigations is very much appreciated. The research was funded by the Centers for Disease Control and Prevention (Contract No. 200-2011-39886).

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Pinnaduwa H. S. W. Kulatilake.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Kulatilake, P.H.S.W., Shu, B. Prediction of Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data. Geotech Geol Eng 33, 1551–1568 (2015). https://doi.org/10.1007/s10706-015-9921-5

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10706-015-9921-5

Keywords

Navigation