Skip to main content
Log in

One Machine Scheduling Problem with Fuzzy Random Due-Dates

  • Published:
Fuzzy Optimization and Decision Making Aims and scope Submit manuscript

Abstract

In many classical or basic scheduling models, jobs’ processing times and due-dates are crisp values. Recently, they have been formulated as uncertain values in some more actual models. That is the introduction of ‘‘fuzziness’’. However, in a real situation of decision making, there exists uncertainty that can not be described only by fuzziness. In this paper, we propose an n-job, one machine scheduling model, where due-dates for jobs are fuzzy random variables. In the model, jobs’ processing times are crisp, and we assign satisfaction levels to jobs’ completion times according to membership functions. They are non-increasing functions, but their support positions depend upon the expected due-dates, which are exponentially distributed random variables.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • S. Han H. Ishii S. Fujii (1994) ArticleTitleOne Machine Scheduling Problem with Fuzzy Due Dates European Journal of Operational Research 49 1–12

    Google Scholar 

  • T. Itoh H. Ishii (1999) ArticleTitleFuzzy Due-date Scheduling Problem with Fuzzy Processing Time International Transactions in Operational Research 6 639–648

    Google Scholar 

  • Jackson, J.R. (1955). ‘‘Scheduling a Production Line to Minimize Maximum Tardiness”, Research Report 43, Management Sciences Research Project, UCLA.

  • Kruse, R. and K. Dieter, (1987). Statistics with Vague Data. D. Reidel Publishing Company.

  • J.M. Moore (1968) ArticleTitleAn n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs Management Science 15 102–109 Occurrence Handle10.1287/mnsc.15.1.102 Occurrence Handle0164.20002

    Article  MATH  Google Scholar 

  • Tada, M., H. Ishii, and T. Nishida, (1990). ‘‘Weighted Fuzzy Due date Scheduling Problem,’’ Proceedings of Asian-Pacific Operations Research Society: APORS’88, 415–417.

  • K. Tanaka M. Vlach (1997) ArticleTitleSingle Machine Scheduling with Fuzzy Due Dates Proceedings of the VII International Fuzzy Systems Association World Congress, IFSA 97 IssueID1 30–35

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Takeshi Itoh.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Itoh, T., Ishii, H. One Machine Scheduling Problem with Fuzzy Random Due-Dates. Fuzzy Optim Decis Making 4, 71–78 (2005). https://doi.org/10.1007/s10700-004-5571-4

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10700-004-5571-4

Keywords

Navigation