Abstract
The selection and prioritization of suitable strategies to address the challenges to the successful operation and implementation of the bus rapid transit (BRT) system is a common problem faced by practitioners and decision-makers. Recent research has widely discussed the issue, but such assessments have remained limited in the city of Dar es Salaam, Tanzania context, where there are mobility difficulties. The present study addresses this research gap and identifies the most critical challenges to BRT implementation and operation, and recommends the most appropriate strategy for overcoming them. Seven strategies are defined. To prioritize these strategies, five criteria are determined. An integrated multi-criteria decision-making model is introduced. Improved Fuzzy Step-Wise Weight Assessment Ratio Analysis based on the Bonferroni operator was used to determine the importance of the criteria. Measurement of alternatives and ranking according to compromise solution was applied to assess and rank the strategies. The results indicate that “frequent flooding at the Jangwani bridge bus terminal” and “long waiting time at bus stops” are the most critical challenges while the fourth alternative “strengthening the operation and management” is the appropriate strategy to be implemented for successful operation and implementation of the BRT system. After that, a five-phase sensitivity analysis is performed to observe the robustness of the proposed approach. The results indicate the flexibility and applicability of the proposed approach can address real-life problems. The proposed methodology in this work can be instrumental in assisting mass transit operators with the successful implementation and operation of the BRT system.
Similar content being viewed by others
Avoid common mistakes on your manuscript.
1 Introduction
Rapid urbanization, a trait of developing nations, particularly those in Africa, has created several transportation problems, including congestion (Adarkwa & Poku-Boansi, 2011), safety concerns (Obeng-Atuah et al., 2017), inaccurate public transportation systems (Poku-Boansi, 2011), imperfect and deficient pedestrian facilities (Amoako et al., 2014), misconduct amidst public transportation providers in terms of not adhering to traffic laws (Agyemang, 2015), rising vehicle ownership (Adarkwa & Poku-Boansi, 2011), unexpected services (Poku-Boansi & Marsden, 2018), and increasing travel demand, particularly in major cities (Poku-Boansi, 2021).
In response to these problems, most governments in developing nations have started reforming their transportation systems with assistance from multilateral institutions like the World Bank and the African Development Bank (ADB). In this context, bus rapid transit (BRT) has emerged as the preeminent economical and effective mass transportation technology that can be installed quickly (Hidalgo & Graftieaux, 2008). BRT systems are already in operation in 45 countries worldwide, with approximately 5542 km of lanes being used (Global BRT Data, 2016).
BRT systems are part of the solution to the continuing global urban expansion impacts in most nations, but notably the metropolitan areas in the emerging world. Before the establishment of BRT, the delivery of public transportation service was frequently marked by the hegemony of irregular operators who run mini-buses that were privately controlled but were hugely coordinated at the route level via alliances. Notwithstanding concerns with safety, accuracy, and congestion, the vast majority of people traveling rely on these services to move around. According to research on the deployment of many BRT projects globally (Kumar et al., 2011), BRT systems have particular implementation issues that, if not handled appropriately early, might result in less-than-acceptable outcomes.
The implementation of BRT systems frequently necessitates a transition from a disorganized public transportation sector to a system that is administered and regulated. The activities of many entities involved in designing, budgeting, implementing, and operating different components of the public transportation system must also be coordinated. Additionally, there is frequently the requirement to perform innovative features that no organization has before undertaken.
In Africa, only three of the 54 nations currently have BRT systems: Nigeria, South Africa, and Tanzania (Agyemang, 2015; Ka'bange et al., 2014; Kumar et al., 2012; McLachlan, 2010; Mobereola, 2009; Rizzo, 2015; Ugo, 2014; Wood, 2015). Many other BRT systems in Africa are still operational, and more are expected in large cities across the continent, particularly Addis Ababa (Ethiopia) and Kigali (Rwanda). The Dar es Salaam bus rapid transit (DART), also referred to as Mwendokasi, is a bus-based transportation system that was put into place in Dar es Salaam to enhance the city's public transportation services by offering lanes specifically designated for boarding stations and bus services with a quick passenger processing system (Chengula & Kombe, 2017).
Dar es Salaam BRT system in Tanzania is the third BRT system in Sub-Saharan Africa, following those in Nigeria and South Africa. A review of the literature yielded no studies that highlighted the prioritization of strategies for the successful implementation and operation of the BRT system in this region of the world. It would be particularly fascinating to learn about the most crucial challenges to BRT implementation and operation, as well as the most effective strategy for overcoming them. Previous research looked into several aspects of the BRT system in Tanzania at various phases of the project. One of the studies examined the operational implications and difficulties DART operations experienced. Interviews with DART stakeholders were conducted as part of a survey to achieve the study's goal (Matata et al., 2017). Another study on DART used a Bayesian hierarchical modeling approach and a Bayesian hypothesis test to compare the operational performance of BRT against two other modes of transportation (Andrew et al., 2022). The results of their study showed that several factors such as delay and time of day significantly influenced travel time variability along the study routes. There was another study based on interviews and questionnaires that evaluated the effectiveness of DART (Chengula & Kombe, 2017). Besides, Tengecha and Mwendapole (2021) used a semi-structured interview method to collect data related to the DART phase implementation and development. They found that management issues and frequent floods in the main station are among the challenges of the project.
The implementation and operation of DART are one of the topics covered, as shown in the literature review (Andrew et al., 2022; Chengula & Kombe, 2017; Matata et al., 2017; Tengecha & Mwendapole, 2021). But up till now, there have been critical gaps as follows:
-
No previous research has used the MCDM method for the identification of the most critical challenges to BRT implementation and operation and recommends the most appropriate strategy for overcoming them. Hence, the results of this limited research were unable to offer mass transit operators any new information regarding the successful implementation and operation of the BRT system.
-
No previous work has combined the IMF SWARA based on the Bonferroni operator and MARCOS methods into a single methodological framework.
-
This is the first study of this kind that proposes a thorough methodological framework for the prioritization of strategies for the successful implementation and operation of the bus rapid transit system in Tanzania.
There are numerous strategies available, and BRT operators need to choose the suitable one. Recommending a strategy for successful BRT implementation and operation based on specific criteria can lead to poor decisions. As a result, various criteria should be considered, and an appropriate MCDM tool should be used. When determining which strategy is the most appropriate, MCDM approaches can be quite helpful (Ayyildiz, 2022; Ayyildiz & Taskin, 2022; Ayyildiz & Taskin Gumus, 2021; Bouraima et al., 2022a, 2022b, 2022c). MCDM techniques are used in a variety of fields and are critical in determining the best option from several choices (Bouraima et al., 2022a, 2022b, 2022c; Gündoğdu, 2022; Stević et al., 2022). These decision-making models are carried out utilizing proper mathematical methodologies. MCDM approaches are helpful means for assisting policymakers who are involved in the evaluation process (Bouraima et al., 2022a, 2022b, 2022c).
In this study, we used the improved fuzzy SWARA (IMF SWARA) to assess the weights of the criteria. This method was proposed by Vrtagić et al. (2021) to overcome the drawbacks of the previously developed fuzzy SWARA method. In comparison to fuzzy SWARA, the application of the IMF SWARA has three advantages: (i) two or more criteria can have equal values; (ii) giving the value (0,0,0), equal values are obtained and not values twice as large, and (iii) less important criteria have greater values and can play a considerable role in the decision-making procedure. We also used the MARCOS method proposed by Stević et al. (2020) to classify the alternatives. A distinctive attribute of the MARCOS method is its provision of a robust decision through the integration of the three points: (i) definition of references points (ideal and anti-ideal values); (ii) determination of the relationships between the references points and alternatives; (iii) definition of the utility degree of alternatives concerning the ideal and anti-ideal solutions. It is also important to highlight that the Bonferroni operator is applied to define the initial matrix and aggregated the opinions of experts.
After the introduction in Sect. 1, the rest of the paper is structured as follows. Section 2 provides an overview of the literature review. Section 3 presents the definition of criteria and alternatives. Section 4 provides the creation of the methodology that is described and explained in detail. Section 5 presented a case study with a detailed calculation given for each approach of the proposed methodology. Section 6 demonstrated the stability of the model through a five-phase sensitivity analysis. The discussion, managerial and practical implications, and conclusions are given in Sects. 7 and 8, respectively.
2 Literature review
A list of abbreviations used in this section is provided, followed by a review of previous research on the BRT system investigation, and finally a presentation of the use of MCDM methods in the BRT system.
2.1 Abbreviations
Table 1 indicates the list of abbreviations used in this section.
2.2 Research on BRT system investigation
BRT systems have dedicated bus lanes, quick fare collecting, modern buses, well-designed terminals, cutting-edge transportation system technologies, and adaptable service schedules. BRT has recently been developed in various nations to address urban transportation demands (Deng et al., 2013). With minimal time spent on construction and low investment and operational costs, it has been successful in alleviating traffic congestion. Most BRT lanes are built on existing highways, making them more cost-effective than rail-based systems for mass transportation (Abdelghany et al., 2007). Along with the implementation and operation of BRT systems, several research contributions have been undertaken to fully appreciate their impacts.
Acton et al. (2022) used a quasi-experimental technique and hedonic spatial error models with propensity score matching to assess and compare the before-and-after effects of 11 BRT systems on nearby property values in ten metropolitan regions throughout the United States. Lopes et al. (2022) evaluated the interest and refusal factors for the installation of BRT stations situated on the highway's centerline between the opposing traffic lanes. Asimeng (2021) analyzed the strategy used to determine the causes of the projected BRT's failure and concludes the Ghanaian experience. The findings highlighted the difficulties the implementing agency faced, which led to a switch from BRT to a regular bus. According to the information gathered from a questionnaire-based survey, Al-Shaar et al. (2022) created mode choice models to investigate how much knowledge of a new public transportation option in Lebanon would influence mode choice. This study demonstrated the importance of taking into account people's perceptions of new modes of transportation as well as their level of familiarity with older ones when conducting feasibility assessments for any transportation projects in developing nations. Asimeng and Heinrichs (2021) identified the reasons why paratransit operators resist and show low interest in BRT even in situations where public institutions have opted not to replace them but rather invite them to participate in the reforms.
Klopp et al. (2019) examined how BRT developments affect the future of the predominant minibus systems and the creation of urban governance. Otunola et al. (2019) provided a detailed account of the African continent's first BRT system, which opened in 2008 in Lagos, highlighting key factors behind its efficient and effective reforms as well as important principles for other cities looking to improve their public transportation systems. Scorcia and Munoz-Raskin (2019) offered insight into the debate over whether there are structural operational indicator disparities between South African cities and their Latin American counterparts for BRT systems. Krüger et al. (2021) studied the BRT as a crucial infrastructure component in Dar es Salaam and investigated its impact on citizens' lifestyles, concentrating on the impact of service disturbances on daily activities and diverse stakeholders' perspectives on the BRT's functionality. Venter et al. (2018) conducted an empirical investigation of the equality consequences of operational BRT systems in the Global South. According to findings from Africa, Asia, and Latin America, BRT offers significant benefits to low-income people in terms of travel time and cost reductions, access enhancement, and safety and health benefits.
Kapadia et al. (2022) conducted a critical analysis of numerous elements influencing the implementation of BRTS services around the world and their application in India. They also addressed how the implementation of a new transportation system influences environmental factors, in addition to the numerous social and physical repercussions. Khan et al. (2022) assessed the first BRT project in Karachi for potential cost savings through perfect coordination of the BRT. Their results indicated that by installing a two-way side-oriented or curb-side-oriented BRT infrastructure without compromising existing capacity, the cost of this stretch could have been reduced. Cruz-Daraviña et al. (2021) investigated the full impact of BRT system adoption on urban freight using Cali (Colombia) as a case study to understand the source and magnitude of these impacts. According to the findings from Cali, the immediately surrounding BRT corridors produce over 62% of urban freight traffic. McGreevy (2021) assessed the appropriateness of four common public transportation systems using data from a literature review as well as statistical and physical evaluations. Their findings suggested that a “Curitiba-styled” BRT system is the best option for the location due to several socioeconomic benefits. Chang et al. (2022) concentrated on evaluating the spatial synergy between the integrated urban rail transit system and urban form by defining the evaluation criteria based on reviews of relevant literature and developing a novel multi-criteria large-scale group assessment (MCLSGA) in which basic uncertain linguistic information (BULI), an extended form of fuzzy linguistic approach, is used to model and process the subjective assessment information elicited by experiments.
2.3 BRT transportation system studies with application of MCDM
The public transportation system has so far employed MCDM to address a wide range of issues, including optimization, management, prioritization, performance, sustainability, and service quality (Aydin et al., 2022; Deveci et al., 2019, 2022; Gokasar et al., 2022a, 2022b; Gokasar et al., 2022a, 2022b). Mavi et al. (2018) evaluated the development scenarios of a BRT system in Tehran using integrated SWARA and COPRAS methodologies in a grey environment. Their analyses revealed that adding buses to the BRT line is the greatest option for increasing the performance of Tehran's BRT line 1. Erdoğan and Kaya (2020) suggested an integrated systematic approach that includes FRBS, fuzzy MCDM, stochastic MCDM, mathematical modeling, information theory, and heuristic approaches to mitigate risks associated with BRT system failures. The proposed systematic approach was applied to the Istanbul BRT system, and several measures were recommended to produce a more effective maintenance plan. Keyvan Ekbatani and Cats (2015) proposed an MCDM modeling framework including lexicographic, SAW method, TOPSIS method, and concordance analysis for the appraisal of multi-modal urban public transportation services namely regular bus, BRT, and rail rapid transit. Their study's findings are useful in guiding planning decisions and selecting efforts to improve public transportation. Lambas et al. (2018) applied an MCDM technique to compare and determine a global score of public transport systems between light rail transit and the BRT system in Spain and Italy, respectively. Erdogan and Kaya (2019) employed a hybrid mechanism including interval type-2 fuzzy AHP, stochastic TOPSIS, and Delphi methods to determine the severity of failures in the BRT system in Istanbul (Turkey). Liu et al. (2020) established an extenics-based model using the AHP and entropy methods to formulate the dependence function for measuring the correlation between bus and system performance. Salavati et al. (2020) proposed objective framework-based AHP-TOPSIS methods to compare four public transport modes namely BRT, regular bus, light rapid transit, and metro. Manzolli et al. (2021) presented a study based on MCDA using the PROMETHEE method to compare electric buses with the more conventional rapid transit options under four scenarios to account for different perspectives. The results indicate the benefits of each option concerning the considered scenario. Nassereddine and Eskandari (2017) proposed an integrated MCDM technique based on the Delphi method, GAHP, and PROMETHEE to assess the satisfaction levels of passengers from public transportation systems in Tehran. Kurniawan et al. (2021) applied the fuzzy AHP-DEMATEL techniques to address the passengers’ decision parameters on using the BRT system in Indonesia. Deveci (2018) proposed an interval type-2 fuzzy TOPSIS and GRA-based VIKOR method for the evaluation of customer satisfaction in all the transportation modes in Istanbul. Dadashpour and Rostami (2018) applied the AHP and PROMETHEE II to identify and classify the best fuel for the BRT system to prevent air pollution emissions. Table 2 summarizes an application of MCDM on the BRT system.
The use of MCDM on BRT systems is one of the subjects discussed, as can be seen from the literature review. However, there is no methodological framework for prioritizing strategies for the successful implementation and operation of the bus rapid transit system. Therefore, using IMF-SWARA-BO-MARCOS methodology, this study suggests a framework for precisely identifying the most critical challenges to BRT implementation and operation, as well as prescribing the most efficient strategy for resolving them. The main contributions and novelty of this study are as follows: (i) the authors collected primary data through IMF SWARA and MARCOS questionnaires from a decision-making panel consisting of experienced professionals from the Dar Rapid Transit Agency; (ii) the authors fill the literature gap on the implementation and operation of the bus rapid transit system in Tanzania. In an extensive search, no study has addressed this topic, identified the most critical challenges to BRT implementation and operation, as well as prescribed the most efficient strategy for resolving them. Therefore, this paper assesses the challenges to BRT implementation and operation in Tanzania. Scientists could replicate the model findings and practical and managerial implications to comprehend the successful implementation and operation of the BRT system in management science. The research's findings can be used as a benchmark for additional investigation by academicians’ who study mass transit systems; (iii) this study takes advantage of MCDM methods, which are critical in determining the best option from several choices. The authors further use the IMF-SWARA to determine the weights of challenges (criteria) to BRT implementation and operation. Then, the appropriate strategy is suggested to overcome the challenges after being ranked using the MARCOS method; (iv) giving experts experimental data and utilizing an exceptional MCDM feature to assist them in all steps of the procedure can be recognized as one more contribution. By examining the IMF-SWARA-BO-MARCOS model, the method is an appropriate technique that can be used to solve issues while criteria cannot be illustrated in numerical expressions, especially in the BRT implementation and operation plan and its examination; (v) the findings would be practical for Tanzania’s government to overcome the challenges (criteria) to BRT implementation and operation through the choice of appropriate strategies; and (vi) the demonstrated methodology can be extended to other BRT projects across the African continent.
3 Problem definition
Because public transportation is considered a key infrastructure and hence an efficient way to make sustainable urban lifestyles and life worlds, discovering solutions to escalating traffic and congestion issues has become an increasingly important matter in recent decades. As a result, a plan to deploy a BRT system in Dar es Salaam appeared in 2002. However, the new transportation system has presented several challenges related to the implementation and operation procedure (Chengula & Kombe, 2017; Ka'bange et al., 2014). Based on these observations, a framework is developed to analyze current challenges using reviewed literature, reports, official documents, and expert opinions. While everyone faces these challenges, solutions should be considered to ensure the BRT's successful implementation and operation. In this study, experts are required to examine adopting efforts to prevent the BRT system's implementation and operation from failing. There are seven distinct alternatives to avoid its ineffective installation and operation.
3.1 Definition of alternatives
There are certain alternatives for experts to consider to effectively apply optimization techniques for the successful implementation and operation of a BRT system.
S1 Introducing a stable automated fare collection (AFC) system It is critical to implement the AFC system to have a safe and dependable payment system. The AFC system is a collection of items used to automate the ticketing system in the public transportation network (Omoruyi et al., 2018). This safe system includes a ticket-checking machine, an automatic gate machine, and a ticket vending machine, all of which are powered by chip-equipped contactless smart cards. The AFC system improves the accuracy and safety of fare collection.
S2 Enhance consistency in bus schedules Due to some structural issues, the BRT system has not yet been able to perform at its full capacity. Due to a lack of operating buses, most bus stops experience long wait periods and crowded buses (Krüger et al., 2021). Thus, there is a need to consistently enhance bus schedules.
S3 Hire skilled operators Many buses break down because they don't get checked and repaired frequently. Unskilled operators are to blame for this. Consequently, there is a need to hire skilled operators (Asimeng, 2021).
S4 Strengthen the operation and management Despite widespread support among Dar es Salaam people, various problems force the DART system to operate in suboptimal settings. Firstly, the system is typically congested during peak morning and evening hours. Second, intelligent transport system technologies are not fully integrated. Furthermore, the traveler information system is only available on onboard platforms and is not available to passengers waiting for the bus. Based on these observations, there is a need to strengthen the operation and management (Matata et al., 2017).
S5 Schedule many buses during pick hours More buses should be provided by BRT management to avoid overcrowding in bus stations or terminals, particularly during peak hours (Tengecha & Mwendapole, 2021). Numerous buses on shorter routes ending nearby should be emphasized.
S6 Encouraging regular bus checkups and repairs It is highly encouraged to frequently check and repair buses to minimize unnecessary bus failures (Tengecha & Mwendapole, 2021).
S7 A feasibility study Enough research must be conducted before the construction of bus terminals; this will decrease or eliminate various management issues, such as those witnessed at the Jangwani bridge bus terminal (Tengecha & Mwendapole, 2021).
3.2 Definition of criteria
Five challenges have been identified from the literature review and opinions of experts.
C1 Frequent flooding at Jangwani BRT terminal According to current data, the Jangwani lowlands have been flooded practically every rainy season for several years (Ka'bange et al., 2014). In such circumstances, the provision of BRT transport services has ceased, resulting in the immobility of people and other operations that rely only on BRT services for transportation in and out of the city (Krüger et al., 2021).
C2 E-ticketing problem The e-ticketing system is an essential component of the Intelligent Transportation System (ITS), which will allow commuters to plan their routes and substantially minimize the amount of time they spend waiting for buses at bus stops. It also aids in the capture of crucial data in transportation operations, which aids in the planning and regulation of transportation services in the city. However, it has been recently noticed a shortage of e-tickets (Chengula & Kombe, 2017; Munishi et al., 2021).
C3 Long waiting time at bus stops The limited number of BRT buses is a challenge that leads to long waiting times and overcrowded BRT stations, especially at peak times (Chengula & Kombe, 2017; Krüger et al., 2021).
C4 Lack of expert operation and management Because of the lack of experts and the reassignment of roles and responsibilities, operational processes have been significantly delayed. Every day, the high number of passengers, the low number of buses running in the system, and the ensuing overcrowding and delays pose significant issues (Krüger et al., 2021).
C5 Inconsistency bus schedules The lack of operational schedules is among the managerial issues that impede the successful operation and implementation of the BRT system (Tengecha & Mwendapole, 2021).
4 Methodology
In the research, an integrated IMF SWARA-MARCOS methodology is presented to assess the weight of criteria and to prioritize the strategies for the successful implementation and operationalization of BRT based on the weighted criteria. Figure 1 indicates the integrated methodology. The mathematical calculations of IMF SWARA are first examined. Next, the Bonferroni operator is used for the aggregation of experts’ opinions and the determination of the initial matrix. The MARCOS method is finally shown as the ranking means.
4.1 IMF SWARA method
The improved fuzzy SWARA is introduced by Vrtagić et al. (2021). After that, many researchers have applied it to many fields such as the assessment of logistics village (Zolfani et al., 2021), healthcare system evaluation (Vojinović et al., 2022), construction machinery selection (Matić et al., 2022), the impact of vehicles on the safety of traffic (Damjanović et al., 2022), transportation of dangerous goods (Vojinović et al., 2021), sustainability of the economic system (Starčević et al., 2022), and production optimization (Dordevic et al., 2022). The improved fuzzy SWARA comprises five subsequent steps as follows:
Step 1 Examination and classification of criteria in descending order of critical importance.
Step 2 Obtention of the significant importance of the criterion (\({C}_{j}\)) in contrast with the precedent one (\({C}_{j-1}\)), based on the initially acquired classification and linguistic scales from Table 3.
Step 3 Computation of fuzzy coefficient \({\overline{k}}_{j}\)
Step 4: Determination of the weights \({\overline{q}}_{j}\)
Step 5 Definition of the fuzzy weight coefficients
where \({w}_{j}\)—the analogue fuzzy weight of the criteria j; m—the number of criteria.
4.2 Bonferroni operator
The Bonferroni operator (Bonferroni, 1950) is applied to aggregate the experts’ opinions and to determine the initial decision-making matrix.
where e represents the number of experts who take part in the survey, while p, q ≥ 0 is a set of non-negative numbers.
4.3 MARCOS method
Stević et al. (2020) have recently proposed the MARCOS method, which principle consists of finding a solution based on the interconnection between reference values and alternatives. The MARCOS approach is utilized in a variety of applications, including, the assessment of software projects (Puška et al., 2020), the performance of COVID-19 of insurances enterprises (Ecer & Pamucar, 2021), railway performance assessment (Bouraima et al., 2021), assessment of sustainable transportation based on fuel vehicles (Pamucar et al., 2021), dam construction safety (Celik & Gul, 2021), sustainable production under circular economy environment (Stević et al., 2021), service quality of airlines industry (Bakir & Atalik, 2021), evaluation of drones based-city logistics (Kovač et al., 2021), sustainable performance variables (Badi et al., 2022), supplier selection (Badi & Pamucar, 2020), sustainable city logistics (Saha et al., 2022), truck mixer selection (Ivanović et al., 2022), regional aircraft selection (Bakir et al., 2021), selection of organ transplantation networks (Salimian et al., 2022), hydrogen gas grid development (Iordache et al., 2022), hazardous healthcare waste (Simic et al., 2022), reach stacker selection (Vesković et al., 2022). Seven steps have characterized the methods as bellows.
Step 1 Establishment of the original matrix.
Step 2 Creation of an expanded initial matrix through the definition of the ideal (AI) and anti-ideal (AAI) solutions in Eqs. (6) and (7) based on the type of criterion.
where B is an advantageous criteria category; C is a non-advantageous criteria category.
Step 3 Normalization of the expanded original matrix (X). Equations (8) and (9) are employed to normalize the matrix \({\text{N}} = \left[ {n_{ij} } \right]_{m \times n}\):
where \(x_{ij}\) and \(x_{ai}\)—matrix X components.
Step 4 Weighted matrix \(V = \left[ {v_{ij} } \right]_{m \times n}\) computation via Eq. (10).
Step 5 Utility degree of alternatives Ki calculation via Eqs. (11) and (12)
where Si(i = 1, 2,…, m)—the sum of the components of V via Eq. (13)
Step 6 Calculation of the utility function of alternatives f (Ki) through Eq. (14).
where \(f\left( {K_{i}^{ - } } \right)\) and \(f\left( {K_{i}^{ + } } \right)\) are the anti-ideal and ideal solutions computed through Eqs. (15) and (16).
Step 7 Ranking of alternatives.
5 Case study
This section presents a real case example of prioritizing strategies for the successful implementation and operation of the BRT system in Tanzania. Based on the reviewed literature, reports, official documents, and expert opinions, five potential challenges have been identified by the authors. A detailed explanation of these five criteria along with the alternatives is provided in Sect. 3. Based on the hierarchical framework in Fig. 2, the data collection was obtained from three different experts using the linguistic scale as explained by Stević et al. (2020), so all criteria are transformed into beneficial in the calculation process. The three respondents have been working at the Dar Rapid Transit Agency for over five years.
5.1 Determining the criteria weights using the improved fuzzy SWARA
Table 4 indicates the coefficient criteria weights based on the IMF SWARA method. As revealed in Table 4, the experts admitted that the frequent flooding at the Jangwani bridge bus terminal is the most critical challenge with a 0.270 value followed by a long waiting time at the bus stop (0.187), lack of expert operation and management, and lack of operational schedules with 0.184 value each one, and E-ticketing problem (0.173). Experts have given frequent flooding considerable attention in Fig. 3. Our results follow a previous study by Krüger et al. (2021), where flooding caused directly by periods of intense rainfall presents a significant challenge for the BRT. After the frequent flooding in Fig. 3, the second challenge is long waiting times. Our findings are similar to the results of Munishi et al. (2021), who discovered that long waiting times are one of the factors that severely limit the reliability of BRT.
5.2 Evaluation of strategies based on the MARCOS method
In this section, an MCDM model consisting of seven alternatives and five criteria is created and the application of the MARCOS method to obtain the ranks of alternatives is initiated. In the first step of MARCOS, a group decision-making procedure consisting of three experts represents the initial matrix. The opinions of experts are aggregated using the Bonferroni operator and an initial matrix of decision-making is obtained. Using Eqs. (6) and (7), an extended initial decision-making matrix is obtained, as indicated in Table 5. Applying Eq. (8), the normalized values for criteria are acquired, e.g.: \(n_{ij} = \frac{{x_{ij} }}{{x_{ai} }} {\text{if}}\;j \in B \leftrightarrow n_{14} = \frac{3.651}{{7.000}} = 0.522,n_{44} = \frac{6.298}{{7.000}} = 0.900\) and a complete normalized matrix, shown in Table 6 is obtained.
The next step is weighting the normalized matrix using Eq. (10). For instance, \({v}_{11}={n}_{11}\times {w}_{11}\) = 0.143 × 0.270 = 0.039. The weighted normalized is shown in Table 7.
By applying Eq. (13), all the values (by rows) for alternatives are summarized as follows:
Correspondingly, the values for the remaining alternatives are obtained.
By applying Eq. (11), the utility degrees of the anti-ideal solution are calculated.
An example of the calculation is:
While using Eq. (12), the utility degrees about the ideal solution are obtained, e.g.\(K_{1}^{ + } = \frac{0.580}{{0.998}} = 0.581\).
The utility function in terms of the anti-ideal solution is obtained using Eq. (15) as follows:
While the utility function in terms of the ideal solution is obtained using Eq. (16) as follows:
Finally, the utility function of alternative S1 is obtained by applying Eq. (14).
The final results are obtained identically as elucidated in Table 8.
Through the application of the MARCOS method, the best alternative is strengthening the operation and management (S4) with a 0.725 Ki value, whereas encouraging regular bus checkups and repair (S6) with a 0.500 Ki value was seen to be the worst alternative. Other alternative classifications can be written as S7 > S3 > S2 > S5 > S1.
6 Sensitivity analysis
In this section, a sensitivity analysis comprising five phases is carried out as follows.
6.1 Assessing the impacts of various weight values on rankings results
The impact of changing the four most significant criteria weights is evaluated using forty scenarios in which the first four important criteria, namely C1, C3, C4, and C5, were reduced using Eq. (17), while C5 yielded the same results as C4 due to equal values. In each of the ten scenarios, the four criteria were changed. In every scenario, the value of the criterion decreased between 5 and 95%, whereas the values of the other criterion were all uniformly perfect by applying Eq. (17). After defining 40 sets (Table 9) with the new values of the criteria, the calculation has been performed.
where \(\overline{W}_{n\beta }\)—new value of criterion for the 40 scenarios. \(\overline{W}_{n\alpha }\)—the reduced value of the important criteria by scenarios groups. \(\overline{W}_{n}\)—initial value of criterion which reduced value.
Figure 4 shows the comparison of original results with all 40 established scenarios in which there were no significant changes in terms of ranking of strategies for successful implementation and operation of the BRT system. As can be seen in Fig. 4, S4 (best alternative) has remained in the same ranking position for 34 scenarios, and the second-best option (S7) has remained in the same ranking position for 28 scenarios. Alternatives S1 and S2 have remained in the same ranking positions for 24 and 32 scenarios, respectively. Alternatives S3 and S5 remained in the same ranking position except for eight scenarios, while S7 remained in the same ranking position except for 12 scenarios.
6.2 Effects of the rank reversal issue on the ranking
The effects of adding or removing an alternative to assess the consistency of the model are proposed by Matić et al. (2022). It is used to assess the sensitivity of the developed framework to the rank reversal issue. Six distinct situations were established by eliminating the poorest choice and then studying the variations in the classification outcomes. Figure 5 shows that the rank reversal procedure of the original matrix had no effect on the results, and the suggested model's ranking results showed that alternatives were rated as S4 > S7 > S3 > S2 > S5 > S1 > S6 in all of the scenarios.
In each scenario, the worst alternative is eliminated one by one until the best alternative is obtained. Table 10 shows the obtained results, which revealed that S4 is the best option in all cases. As a result, these findings attest to the effectiveness of the proposed model, which is both stable and consistent.
6.3 Comparison with other MCDM approaches (ranks)
In the third stage, the proposed model is compared with nine other MCDM methods: CODAS (Keshavarz Ghorabaee et al., 2016), COPRAS (Zavadskas et al., 1994), CRADIS (Puška et al., 2021), WASPAS (Zavadskas et al., 2012), ARAS (Zavadskas & Turkis, 2010), SAW (Afshari et al., 2010), EDAS (Keshavarz Ghorabaee et al., 2015), MABAC (Pamučar & Ćirović, 2015; Pamučar et al., 2018), and MAIRCA (Gigović et al., 2016). Figure 6 depicts the comparative analysis results, which include the final rankings.
In Fig. 6, the classification of alternatives differs based on the method used, resulting in the computation of the SCC and WS coefficients for creating the link in this part of the validation of initial values acquired. It should be noted that S4 retains the best place (first one) with CRADIS, WASPAS, SAW, and MABAC, and occupies the second position with CODAS, COPRAS, ARAS, and EDAS. Meanwhile, S6 is in the worst place (last position) with CODAS, COPRAS, CRADIS, ARAS, and SAW, while it took the 6th position with WASPAS, EDAS, and MABAC. When using MABAC, the greatest variation occurs when the position of the seventh alternative (S7) changes from second to fourth rank.
6.4 SCC and WS correlation
Table 11 displays the SCC and WS coefficients in comparison analysis for rank changes. There is a higher interdependence of rankings when nine different methods are used, with SCC and WS coefficients of 0.920 and 0.887, respectively. Also, a complete interdependence exists between the proposed model and those of the IMF SWARA-CRADIS and IMF SWARA-SAW. It has an extremely high interdependence coefficient, except for MAIRCA and MABAC (SCC = 0.850, WS = 0.857), revealing the stability of the results.
6.5 Comparative analysis with criteria method
In the fifth stage, a comparison of the criteria method was assessed, along with two other two popular methods namely fuzzy FUCOM-MARCOS (Badi et al., 2022) and fuzzy PIPRECIA-MARCOS (Bakır et al., 2021). The comparative analysis for the criteria method is shown in Fig. 7. It should be noted that the ranking of the alternatives is constant. In addition, S4 holds the first position while S6 is in last place.
7 Discussion, managerial and practical implications
This section highlights the discussion and managerial and practical implications based on the findings of the case application. The study considers the appropriate strategy selection for the successful implementation and operation of the BRT system taking into account a real case where critical challenges to the BRT system are identified. First of all, a criteria assessment is performed for the prioritization of strategies. For this goal, the challenges in implementing and operating the BRT system are defined as criteria, and these criteria are weighted using the IMF SWARA method based on the Bonferroni operator. The MARCOS method is used to rank the strategies. Thus, an integrated IMF SWARA-BO and MARCOS approach is proposed to enable the selection of the appropriate strategy for the BRT system problem. The proposed approach provides the assessment of the criteria and alternatives for the BRT system problem based on researched literature, reports, official documents, and expert opinions. In this regard, the challenges to the successful implementation and operation of the BRT system are investigated, and an appropriate strategy is strategically determined. For mass transit operators who aim to eradicate the challenges to a successful implementation and operation of the BRT system and provide effective service delivery to users, it is important to propose an appropriate plan of action. At this point, the proposed integrated approach will be useful in finding the appropriate alternative with the identification of critical challenges for the BRT system. The study indicates that the frequent flooding at the Jangwani bridge bus terminal followed by the long waiting time at bus stops are the most critical factors challenging the implementation and operationalization of BRT. It's crucial to find a solution to the Jangwani bridge situation. A strategy should be developed to reduce the risk of flooding in the future, by elevating the bridge. However, before the plan is put into action, a few issues still need to be handled. Since floods have been threatening the informal settlements in river basins practically every year for the past ten years (2009–2018), they would need to be displaced. Additionally, community facilities are within the valley, and their continued presence in this place must be assessed. To set up a longer-term solution, practical steps should be made. To take one example, a holistic planning approach is required to routinely eliminate alluvial sediments from the riverbank, which would significantly improve the situation, decrease susceptibility to rainstorm disasters and floods, and allow attention to be directed toward more tough problems. Internal discussions between BRT participants to more effectively distribute responsibilities and “optimize” the operational plan of the system should be seen as a prerequisite for other initiatives to be effective. There is also a need to increase the number of buses to address long wait times at bus stops.
The alternative “S4-strengthening of the operation and management” has been chosen by experts as the appropriate strategy since its implementation will on one hand improve the effectiveness of the BRT system and from another hand assess the appropriate zone to construct and implement bus stops and BRT stations. The respondents are informed of the study's findings. The outcomes from ranking the strategies to overcoming the difficulties in implementing and operating the BRT system are equivalent to the expectations and presumptions of all experts.
The prioritization of strategies for the effective implementation and operation of the BRT system has not been studied using MCDM in the literature. Thus, the proposed methodology has numerous theoretical and practical contributions to the literature on BRT systems. The main theoretical and practical implications of the study are as follows:
IMF SWARA based on BO operator is integrated with MARCOS methodology and applied to the prioritization of strategies for successful implementation and operation of the BRT system for the first time in the literature.
Using researched literature, reports, official documents, and expert opinions, the criteria to evaluate the strategies for successful implementation and operation of the BRT system are determined. In this way, a thorough framework for assessing the challenges is brought to the literature. An expert group is established comprising experienced professionals from the Dar Rapid Transit Agency.
Although the proposed strategy prioritization model has not considered the challenges under the socio-economic and environmental aspects, it contributes to the BRT systems literature because it is developed in an extendable and adaptable manner. The proposed strategy prioritization model can be used by other BRT systems in Africa that are still operational, as well as new ones that are expected in major cities across the continent, particularly Addis Ababa (Ethiopia) and Kigali (Rwanda), respectively. Additionally, it might be a tool for learning about the challenges involved in successfully implementing and operating the BRT system.
8 Conclusion
This study identifies the challenges to the successful implementation and operation of the BRT system and recommends the most appropriate strategy for overcoming them. It is important for mass transit operators how critical these challenges are in terms of impeding the effectiveness of the BRT system. Within the scope of the study, the problem of determining the challenges, the weights of these challenges, and appropriate strategies are accordingly discussed. To determine the weights of these challenges, the methodology process is discussed in the study. Firstly, all challenges (criteria) that may impede the effectiveness of the BRT system are determined as a result of researched literature, reports, official documents, and expert opinions. After the criteria are determined, experts are asked to assess these criteria. After the assessment procedure using linguistic variables, the weights of the criteria are determined using the IMF SWARA method based on the Bonferroni operator. The alternatives (strategies) are then ranked by weighted challenges using the MARCOS method. In this way, it is stated which strategy should be implemented for the BRT system to have a successful implementation and operation.
The following is a list of the paper's contributions to the field of study and practice: (1) the challenges that impede the successful implementation and operation of the BRT system are pinpointed and ranked; (2) the most critical challenges for the successful implementation and operation of BRT system are determined; (3) A real-life application in Dar-es-Salaam is carried out and presented to indicate the applicability and reliability of the proposed methodology; (4) Seven different strategies are evaluated according to the determined challenges and the appropriate one is recommended to be implemented; (5) The proposed methodology is intended to be used by mass transit operators for successful implementation and operation of the BRT system.
Although this study has contributed to the implementation and operation of the BRT system literature, still has some research limitations and disadvantages. Only the challenges faced during phase 1 out of the six phases of the implementation and operation of the BRT system are included in the proposed strategy prioritization model to demonstrate our approach. The evaluation of a small number of challenges that fall under the study's scope constitutes the first limitation. A lack of a set of criteria for choosing suitable experts for data collecting is another limitation. The study's sole consideration of experts from the Dar Rapid Transit Agency, without taking academicians into account, is the third limitation. The fourth limitation relates to the application of the MARCOS approach for ranking alternatives, which has the disadvantage of using the single normalization (linear normalization) technique.
Future research may need to consider the other phases of the BRT system as well as the new challenges that may emerge through their execution by using this methodology. Selecting the appropriate experts is critical for researchers, and they need to be more cautious in this regard. As a result, a set of criteria should also be formed for choosing the right experts. Additionally, a greater number of academic experts should be included to improve the consistency of the experts' reviews. Besides, we recommend the use of a possibilistic programming framework under uncertainty (Goli et al., 2022a, 2022b), an accurate algorithm (Goli et al., 2022a, 2022b), and double normalized method (Ivanović et al., 2022) in developing future integrated decision-making models. Future research may also consider the application of the proposed framework in sustainable building material selection, and expertise-based bid evaluation for construction-contractor selection.
References
Abdelghany, K. F., Mahmassani, H. S., & Abdelghany, A. F. (2007). A modeling framework for bus rapid transit operations evaluation and service planning. Transportation Planning and Technology, 30(6), 571–591.
Acton, B., Le, H. T., & Miller, H. J. (2022). Impacts of bus rapid transit (BRT) on residential property values: A comparative analysis of 11 US BRT systems. Journal of Transport Geography, 100, 103324.
Adarkwa, K. K., & Poku-Boansi, M. (2011). (2011). Rising vehicle ownership, roadway challenges and traffic congestion in Kumasi. In A. K. Kwafo (Ed.), Future of the tree: Towards growth and development of Kumasi (pp. 128–152). KNUST University Press.
Afshari, A., Mojahed, M., & Yusuff, R. M. (2010). Simple additive weighting approach to personnel selection problem. International Journal of Innovation, Management and Technology, 1(5), 511.
Agyemang, E. (2015). The bus rapid transit system in the greater Accra metropolitan area, Ghana: Looking back to look forward. Norsk Geografisk Tidsskrift-Norwegian Journal of Geography, 69(1), 28–37.
Al-Shaar, W., Nehme, N., Bonin, O., Adjizian-Gérard, J., & Al-Shaar, M. (2022). Passengers receptivity of a new public transport mode: Case of a BRT project in Lebanon. Computational Urban Science, 2(1), 1–13.
Amoako, C., Cobbinah, P. B., & Niminga-Beka, R. (2014). Urban infrastructure design and pedestrian safety in the Kumasi Central Business District, Ghana. Journal of Transportation Safety & Security, 6(3), 235–256.
Andrew, L., Kitali, A. E., Sando, T., & Musagasa, J. (2022). Operational evaluation of the bus rapid transit system: Case study of Dar es Salaam city. Journal of Public Transportation, 24, 100020.
Asimeng, E. T. (2021). Bus rapid transit implementation with the inclusion of incumbent paratransit operators in African cities: Lessons from Accra. Urban, Planning and Transport Research, 9(1), 534–548.
Asimeng, E. T., & Heinrichs, D. (2021). Why do paratransit operators resist participation in bus rapid transit? Case evidence from Bogota, Mexico City. Johannesburg and Lagos. Transport Reviews, 41(1), 115–135.
Aydin, N., Şeker, Ş, & Deveci, M. (2022). Multi-Objective Optimization of Car Sharing Points Under Uncertainty for Sustainable Transportation. IEEE Transactions on Engineering Management. https://doi.org/10.1109/TEM.2022.3171987
Ayyildiz, E. (2022). A novel pythagorean fuzzy multi-criteria decision-making methodology for e-scooter charging station location-selection. Transportation Research Part D: Transport and Environment, 111, 103459.
Ayyildiz, E., & Taskin, A. (2022). A novel spherical fuzzy AHP-VIKOR methodology to determine serving petrol station selection during COVID-19 lockdown: A pilot study for İstanbul. Socio-Economic Planning Sciences, 83, 101345.
Ayyildiz, E., & TaskinGumus, A. (2021). Pythagorean fuzzy AHP based risk assessment methodology for hazardous material transportation: An application in Istanbul. Environmental Science and Pollution Research, 28(27), 35798–35810.
Badi, I., Muhammad, L., Abubakar, M., & Bakır, M. (2022). Measuring sustainability performance indicators using FUCOM-MARCOS methods. Operational Research in Engineering Sciences: Theory and Applications, 5(2), 99–116.
Badi, I., & Pamucar, D. (2020). Supplier selection for steelmaking company by using combined Grey-MARCOS methods. Decision Making: Applications in Management and Engineering, 3(2), 37–48.
Bakır, M., Akan, Ş, & Özdemir, E. (2021). Regional aircraft selection with fuzzy piprecia and fuzzy marcos: A case study of the Turkish airline industry. Facta Universitatis, Series: Mechanical Engineering, 19(3), 423–445.
Bakır, M., & Atalık, Ö. (2021). Application of fuzzy AHP and fuzzy MARCOS approach for the evaluation of e-service quality in the airline industry. Decision Making: Applications in Management and Engineering, 4(1), 127–152.
Bonferroni, C. (1950). Sulle medie multiple di potenze. Bollettino Dell’unione Matematica Italiana, 5(3–4), 267–270.
Bouraima, M. B., Kiptum, C. K., Ndiema, K. M., Qiu, Y., & Tanackov, I. (2022a). Prioritization road safety strategies towards zero road traffic injury using ordinal priority approach. Operational Research in Engineering Sciences: Theory and Applications, 5(2), 206–221.
Bouraima, M. B., Qiu, Y., Kiptum, C. K., & Ndiema, K. M. (2022b). Evaluation of factors affecting road maintenance in Kenyan counties using the ordinal priority approach. Journal of Computational and Cognitive Engineering, 00(00), 1–6.
Bouraima, M. B., Qiu, Y., Stević, Ž, & Simić, V. (2022c). Assessment of alternative railway systems for sustainable transportation using an integrated IRN SWARA and IRN CoCoSo model. Socio-Economic Planning Sciences. https://doi.org/10.1016/j.seps.2022.101475
Bouraima, M. B., Stević, Ž, Tanackov, I., & Qiu, Y. (2021). Assessing the performance of Sub-Saharan African (SSA) railways based on an integrated Entropy-MARCOS approach. Operational Research in Engineering Sciences: Theory and Applications, 4(2), 13–35.
Celik, E., & Gul, M. (2021). Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment. Automation in Construction, 127, 103699.
Chang, J.-P., Chen, Z.-S., Wang, Z.-J., Jin, L., Pedrycz, W., Martínez, L., & Skibniewski, M. J. (2022). Assessing the spatial synergy between integrated urban rail transit system and urban form: A BULI-based MCLSGA model with wisdom of crowds. IEEE Transactions on Fuzzy Systems. https://doi.org/10.1109/TFUZZ.2022.3185680
Chengula, D., & Kombe, K. (2017). Assessment of the effectiveness of Dar es Salaam bus rapid transit (DBRT) system in Tanzania. Int. J. Sci, 36, 10–30.
Cruz-Daraviña, P. A., Sánchez-Díaz, I., & BocarejoSuescún, J. P. (2021). Bus rapid transit (BRT) and urban freight—Competition for space in densely populated cities. Sustainability, 13(12), 6611.
Dadashpour, I., & Rostami, A. (2018). Identifying and ranking of alternative fuels by using AHP and PROMETHEE II methods to find best fuel for bus rapid transit system. International Journal of Business Analytics (IJBAN), 5(4), 74–87.
Damjanović, M., Stević, Ž, Stanimirović, D., Tanackov, I., & Marinković, D. (2022). Impact of the number of vehicles on traffic safety: Multiphase modeling. Facta Universitatis. Series: Mechanical Engineering, 20(1), 177–197.
Deng, T., Ma, M., & Wang, J. (2013). Evaluation of bus rapid transit implementation in China: Current performance and progress. Journal of Urban Planning and Development, 139(3), 226–234.
Deveci, M. (2018). An integrated TOPSIS, GRA and VIKOR based on interval type-2 fuzzy method to improve customer satisfaction in public transportation. Cumhuriyet Science Journal, 39(1), 274–293.
Deveci, M., Öner, S. C., Canıtez, F., & Öner, M. (2019). Evaluation of service quality in public bus transportation using interval-valued intuitionistic fuzzy QFD methodology. Research in Transportation Business & Management, 33, 100387.
Deveci, M., Pamucar, D., Gokasar, I., & Delen, D. (2022). A fuzzy Einstein-based decision support system for public transportation management at times of pandemic. Knowledge-Based Systems, 252, 109414.
Dordevic, M., Tešić, R., Todorović, S., Jokić, M., Das, D. K., Stević, Ž, & Vrtagic, S. (2022). Development of integrated linear programming fuzzy-rough MCDM model for production optimization. Axioms, 11(10), 510.
Ecer, F., & Pamucar, D. (2021). MARCOS technique under intuitionistic fuzzy environment for determining the COVID-19 pandemic performance of insurance companies in terms of healthcare services. Applied Soft Computing, 104, 107199.
Erdogan, M., & Kaya, I. (2019). Prioritizing failures by using hybrid multi criteria decision making methodology with a real case application. Sustainable Cities and Society, 45, 117–130.
Erdoğan, M., & Kaya, İ. (2020). A systematic approach to evaluate risks and failures of public transport systems with a real case study for bus rapid system in Istanbul. Sustainable Cities and Society, 53, 101951.
Gigović, L., Pamučar, D., Bajić, Z., & Milićević, M. (2016). The combination of expert judgment and GIS-MAIRCA analysis for the selection of sites for ammunition depots. Sustainability, 8(4), 372.
Global BRT Data (2016). Database of bus rapid transit systems around the world. Retrieved August to January 2017, from http://brtdata.org/#/location
Gokasar, I., Timurogullari, A., Deveci, M., & Garg, H. (2022a). SWSCAV: Real-time traffic management using connected autonomous vehicles. ISA Transactions. https://doi.org/10.1016/j.isatra.2022.06.025
Gokasar, I., Timurogullari, A., Özkan, S. S., Deveci, M., & Lv, Z. (2022b). MSND: Modified standard normal deviate incident detection algorithm for connected autonomous and human-driven vehicles in mixed traffic. IEEE Transactions on Intelligent Transportation Systems. https://doi.org/10.1109/TITS.2022.3190667
Goli, A., Ala, A., & Mirjalili, S. (2022a). A robust possibilistic programming framework for designing an organ transplant supply chain under uncertainty. Annals of Operations Research. https://doi.org/10.1007/s10479-022-04829-7
Goli, A., KhademiZare, H., Tavakkoli-Moghaddam, R., & Sadeghieh, A. (2022b). A novel exact solution algorithm for a robust product portfolio problem under return uncertainty. Scientia Iranica, 29(3), 1638–1645.
Gündoğdu, F. K. (2022). Analyzing critical barriers of smart energy city in Turkey based on two-dimensional uncertainty by hesitant z-fuzzy linguistic terms. Engineering Applications of Artificial Intelligence, 113, 104935.
Hidalgo, D., & Graftieaux, P. (2008). Bus rapid transit systems in Latin America and Asia: Results and difficulties in 11 cities. Transportation Research Record, 2072(1), 77–88.
Iordache, M., Pamucar, D., Deveci, M., Chisalita, D., Wu, Q., & Iordache, I. (2022). Prioritizing the alternatives of the natural gas grid conversion to hydrogen using a hybrid interval rough based Dombi MARCOS model. International Journal of Hydrogen Energy, 47(19), 10665–10688.
Ivanović, B., Saha, A., Stević, Ž, Puška, A., & Zavadskas, E. K. (2022). Selection of truck mixer concrete pump using novel MEREC DNMARCOS model. Archives of Civil and Mechanical Engineering, 22(4), 1–21.
Ka’bange, A., Mfinanga, D., & Hema, E. (2014). Paradoxes of establishing mass rapid transit systems in african cities—A case of Dar es Salaam rapid transit (DART) system, Tanzania. Research in Transportation Economics, 48, 176–183.
Kapadia, M., Sarkar, S., Roy, B. C., & Sinha, R. C. (2022). Critical appraisal of parameters for successful implementation of BRTS in India. Periodica Polytechnica Transportation Engineering, 50(2), 165–183.
KeshavarzGhorabaee, M., Zavadskas, E. K., Olfat, L., & Turskis, Z. (2015). Multi-criteria inventory classification using a new method of evaluation based on distance from average solution (EDAS). Informatica, 26(3), 435–451.
KeshavarzGhorabaee, M., Zavadskas, E. K., Turskis, Z., & Antucheviciene, J. (2016). A new combinative distance-based assessment (CODAS) method for multi-criteria decision-making. Economic Computation & Economic Cybernetics Studies & Research, 50(3), 25–44.
Keyvan Ekbatani, M., & Cats, O. (2015). Multi-criteria appraisal of multi-modal urban public transport systems. Transportation Research Procedia, 10, 2015; 18th Euro Working Group on Transportation, EWGT 2015, 14–16 July 2015, Delft.
Khan, F., Ahmed, A., Ahmed, M., & Baig, M. A. U. (2022). An evaluation of cost optimization strategies for BRT projects in Pakistan. Engineering, Technology & Applied Science Research, 12(4), 8825–8830.
Klopp, J. M., Harber, J., & Quarshie, M. (2019). A review of BRT as public transport reform in African cities. VREF Research Synthesis Project Governance of Metropolitan Transport. https://doi.org/10.13140/RG.2.2.29342.79686
Kovač, M., Tadić, S., Krstić, M., & Bouraima, M. B. (2021). Novel spherical fuzzy MARCOS method for assessment of drone-based city logistics concepts. Complexity, Article ID, 2374955(2021), 1–17.
Krüger, F., Titz, A., Arndt, R., Groß, F., Mehrbach, F., Pajung, V., Suda, L., Wadenstorfer, M., & Wimmer, L. (2021). The bus rapid transit (BRT) in Dar es Salaam: A pilot study on critical infrastructure, sustainable urban development and livelihoods. Sustainability, 13(3), 1058.
Kumar, A., Zimmerman, S., & Agarwal, O. P. (2012). International experience in bus rapid transit (BRT) implementation: synthesis of lessons learned from Lagos, Johannesburg, Jakarta, Delhi and Ahmedabad case studies. The World Bank Institute.
Kumar, P., Kulkarni, S., & Parida, M. (2011). Security perceptions of Delhi commuters at metro-bus interchange in multi modal perspective. Journal of Transportation Security, 4(4), 295–307.
Kurniawan, V. R. B., Yulianti, T., & Puspitasari, F. H. (2021). Fuzzy AHP–DEMATEL methods to investigate passengers’ decision factors on using public city bus in an Indonesian region. OPSI, 14(1), 10–20.
Lambas, M. E. L., Giuffrida, N., Ignaccolo, M., & Inturri, G. (2018). Comparison between bus rapid transit and light-rail transit systems: A multi-criteria decision analysis approach. Urban Transport XXIII, 176, 143–154.
Liu, Y., Chien, S., Hu, D., Wang, N., & Zhang, R. (2020). Developing an extenics-based model for evaluating bus transit system. Journal of Advanced Transportation. https://doi.org/10.1155/2020/8879664
Lopes, P., Thives, L. P., & Júnior, W. K. (2022). Prevailing user’s factors in bus rapid transport stations located in high-traffic urban highways. Case Studies on Transport Policy, 10(1), 710–722.
Manzolli, J. A., Trovão, J. P., & Antunes, C. H. (2021). Scenario-based multi-criteria decision analysis for rapid transit systems implementation in an urban context. eTransportation, 7, 100101.
Matata, F., Kitali, A. E., Sando, T., & Bwire, H. (2017). Operational characteristics of the newly introduced bus rapid transit in Dar Es Salaam, Tanzania. Presented at the Transportation Research Board’s 96th Annual Meeting, Washington, D.C.
Matić, B., Marinković, M., Jovanović, S., Sremac, S., & Stević, Ž. (2022). Intelligent novel IMF D-SWARA—Rough MARCOS algorithm for selection construction machinery for sustainable construction of road infrastructure. Buildings, 12(7), 1059.
Mavi, R. K., Zarbakhshnia, N., & Khazraei, A. (2018). Bus rapid transit (BRT): A simulation and multi criteria decision making (MCDM) approach. Transport Policy, 72, 187–197.
McGreevy, M. (2021). Cost, reliability, convenience, equity or image? The cases for and against the introduction of light rail and bus rapid transit in inners suburban Adelaide, South Australia. Case Studies on Transport Policy, 9(1), 271–279.
McLachlan, N. (2010). The introduction of bus rapid transit systems in South African cities. Participation of the minibus taxi industry—A model for sustainability or a recipe for failure. CODATU XIV, 25–27 October. Buenos Aires, Argentina.
Mobereola, D. (2009). Lagos bus rapid transit: Africa’s first BRT scheme. Sub-Saharan Africa Transport Policy Program Urban Transport Series: Discussion Paper No.9. The World Bank, Washington DC.
Munishi, E. J., Hamidu, K. M., & Shayo, F. (2021). Factors constraining quality service provision in the BRT project in Dar es Salaam, Tanzania. Open Journal of Social Sciences, 9, 262–279.
Nassereddine, M., & Eskandari, H. (2017). An integrated MCDM approach to evaluate public transportation systems in Tehran. Transportation Research Part a: Policy and Practice, 106, 427–439.
Obeng-Atuah, D., Poku-Boansi, M., & Cobbinah, P. B. (2017). Pedestrian crossing in urban Ghana: Safety implications. Journal of Transport & Health, 5, 55–69.
Omoruyi, O., Omoruyi, M., Okokpujie, K., & Okokpujie, I. (2018). Electronic fare collection systems in public transits: Issues, challenges and way-forward. Covenant Journal of Engineering Technology, 2(1), 94–108.
Otunola, B., Kriticos, S., & Harman, O. (2019). The BRT and the danfo: A case study of Lagos’ transport reforms from 1999–2019. IGC Cities that Work Case Study. https://www.theigc.org/wp-content/uploads/2019/10/lagos-BRT-case-study.pdf
Pamučar, D., & Ćirović, G. (2015). The selection of transport and handling resources in logistics centers using multi-attributive border approximation area comparison (MABAC). Expert Systems with Applications, 42(6), 3016–3028.
Pamucar, D., Ecer, F., & Deveci, M. (2021). Assessment of alternative fuel vehicles for sustainable road transportation of United States using integrated fuzzy FUCOM and neutrosophic fuzzy MARCOS methodology. Science of the Total Environment, 788, 147763.
Pamučar, D., Petrović, I., & Ćirović, G. (2018). Modification of the Best-Worst and MABAC methods: A novel approach based on interval-valued fuzzy-rough numbers. Expert Systems with Applications, 91, 89–106.
Poku-Boansi, M. (2011). Transport mode choice by commuters in Kumasi. Ghana. Reg. Dev. Stud., 15, 059–072.
Poku-Boansi, M. (2021). Contextualizing urban growth, urbanisation and travel behaviour in Ghanaian cities. Cities, 110, 103083.
Poku-Boansi, M., & Marsden, G. (2018). Bus rapid transit systems as a governance reform project. Journal of Transport Geography, 70, 193–202.
Puška, A., Stević, Ž, & Pamučar, D. (2021). Evaluation and selection of healthcare waste incinerators using extended sustainability criteria and multi-criteria analysis methods. Environment, Development and Sustainability. https://doi.org/10.1007/s10668-021-01902-2
Puška, A., Stojanović, I., Maksimović, A., & Osmanović, N. (2020). Evaluation software of project management used measurement of alternatives and ranking according to compromise solution (MARCOS) method. Operational Research in Engineering Sciences: Theory and Applications, 3(1), 89–102.
Rizzo, M. (2015). The political economy of an urban megaproject: The bus rapid transit project in Tanzania. African Affairs, 114(455), 249–270.
Saha, A., Simic, V., Senapati, T., Dabic-Miletic, S., & Ala, A. (2022). A dual hesitant fuzzy sets-based methodology for advantage prioritization of zero-emission last-mile delivery solutions for sustainable city logistics. IEEE Transactions on Fuzzy Systems, 10, 1–1.
Salavati, A., Da Silva, F. J. S. E. N., & Haghshenas, H. (2020). Comparing public transport alternatives using AHP-TOPSIS and sustainability indicators—Case study: City of Isfahan. International Journal of Transportation Engineering, 8(1), 85–106.
Salimian, S., Mousavi, S. M., & Antucheviciene, J. (2022). An interval-valued intuitionistic fuzzy model based on extended VIKOR and MARCOS for sustainable supplier selection in organ transplantation networks for healthcare devices. Sustainability, 14(7), 3795.
Scorcia, H., & Munoz-Raskin, R. (2019). Why South African cities are different? Comparing Johannesburg’s Rea Vaya bus rapid transit system with its Latin American siblings. Case Studies on Transport Policy, 7(2), 395–403.
Simic, V., EbadiTorkayesh, A., & IjadiMaghsoodi, A. (2022). Locating a disinfection facility for hazardous healthcare waste in the COVID-19 era: a novel approach based on Fermatean fuzzy ITARA-MARCOS and random forest recursive feature elimination algorithm. Annals of Operations Research. https://doi.org/10.1007/s10479-022-04822-0
Starčević, V., Petrović, V., Mirović, I., Tanasić, L. Ž, Stević, Ž, & ĐurovićTodorović, J. (2022). A novel integrated PCA-DEA-IMF SWARA-CRADIS model for evaluating the impact of FDI on the sustainability of the economic system. Sustainability, 14(20), 13587.
Stević, Ž, Bouraima, M. B., Subotić, M., Qiu, Y., Buah, P. A., Ndiema, K. M., & Ndjegwes, C. M. (2022). Assessment of causes of delays in the road construction projects in the Benin Republic using fuzzy PIPRECIA method. Mathematical Problems in Engineering. https://doi.org/10.1155/2022/5323543
Stević, Ž, Karamaşa, Ç., Demir, E., & Korucuk, S. (2021). Assessing sustainable production under circular economy context using a novel rough-fuzzy MCDM model: A case of the forestry industry in the Eastern Black Sea region. Journal of Enterprise Information Management. https://doi.org/10.1108/JEIM-10-2020-0419
Stević, Ž, Pamučar, D., Puška, A., & Chatterjee, P. (2020). Sustainable supplier selection in healthcare industries using a new MCDM method: Measurement of alternatives and ranking according to COmpromise solution (MARCOS). Computers & Industrial Engineering, 140, 106231.
Tengecha, N., & Mwendapole, M. (2021). The Challenges and opportunities of Dar es Salaam city bus rapid transit on implementation and operations. Developing Country Studies, 11(7), 27–35.
Ugo, P. D. (2014). The bus rapid transit system: A service quality dimension of commuter uptake in Cape Town, South Africa. Journal of Transport and Supply Chain Management, 8(1), 1–10.
Venter, C., Jennings, G., Hidalgo, D., & Valderrama Pineda, A. F. (2018). The equity impacts of bus rapid transit: A review of the evidence and implications for sustainable transport. International Journal of Sustainable Transportation, 12(2), 140–152.
Vesković, S., Stević, Ž, Nunić, Z., Milinković, S., & Mladenović, D. (2022). A novel integrated large-scale group MCDM model under fuzzy environment for selection of reach stacker in a container terminal. Applied Intelligence. https://doi.org/10.1007/s10489-021-02914-1
Vojinović, N., Sremac, S., & Zlatanović, D. (2021). A novel integrated fuzzy-rough MCDM model for evaluation of companies for transport of dangerous goods. Complexity. https://doi.org/10.1155/2021/5141611
Vojinović, N., Stević, Ž, & Tanackov, I. (2022). A novel IMF SWARA-FDWGA-PESTEL analysis for assessment of healthcare system. Operational Research in Engineering Sciences: Theory and Applications, 5(1), 139–151.
Vrtagić, S., Softić, E., Subotić, M., Stević, Ž, Dordevic, M., & Ponjavic, M. (2021). Ranking road sections based on MCDM model: New improved fuzzy SWARA (IMF SWARA). Axioms, 10(2), 92.
Wood, A. (2015). The politics of policy circulation: Unpacking the relationship between South African and South American cities in the adoption of bus rapid transit. Antipode, 47(4), 1062–1079.
Zavadskas, E. K., Kaklauskas, A., & Sarka, V. (1994). The new method of multicriteria complex proportional assessment of projects. Technological and Economic Development of Economy, 1(3), 131–139.
Zavadskas, E. K., & Turskis, Z. (2010). A new additive ratio assessment (ARAS) method in multicriteria decision-making. Technological and Economic Development of Economy, 16(2), 159–172.
Zavadskas, E. K., Turskis, Z., Antucheviciene, J., & Zakarevicius, A. (2012). Optimization of weighted aggregated sum product assessment. Elektronika Ir Elektrotechnika, 122(6), 3–6.
Zolfani, S. H., Görçün, Ö. F., & Küçükönder, H. (2021). Evaluating logistics villages in Turkey using hybrid improved fuzzy SWARA (IMF SWARA) and fuzzy MABAC techniques. Technological and Economic Development of Economy, 27(6), 1582–1612.
Acknowledgements
The authors would like to thank experts from the Dar es Salaam Rapid Transit (DART) system for the useful exchanges and feedback about the data collection.
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
The authors declare that they have no conflict of interest.
Ethical approval
This article does not contain any studies with animals performed by any of the authors.
Informed consent
Informed consent was obtained from all individual participants included in the study.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
About this article
Cite this article
Bouraima, M.B., Tengecha, N.A., Stević, Ž. et al. An integrated fuzzy MCDM model for prioritizing strategies for successful implementation and operation of the bus rapid transit system. Ann Oper Res (2023). https://doi.org/10.1007/s10479-023-05183-y
Accepted:
Published:
DOI: https://doi.org/10.1007/s10479-023-05183-y