Abstract
This paper studies what accounts for the recent business cycles phenomena in Portugal and why it is depressed relatively to the United States. The business accounting procedure applied here suggests that most of the changes in output per worker in Portugal over the period (mainly, from 1979 to 1991) can be attributed to changes in economic efficiency. For instance, the strong economic recovery in output per worker just after Portugal joined the European Union until the first years of the 1990s can be essentially attributed to improvements in economic efficiency. From 1979 to 2000, Portugal caught up with the industrial leader. Its output per worker is currently depressed by about 46% relative to the United States level (it was depressed by 57% in 1979). In the 1980s all of this depression in output per worker relative to the United States was due to the productivity factor. By 2000 Portugal depression relative to the United States was a mix of the French and Japanese depression. The labor factor accounted for roughly 24% of this depression, while the economic efficiency accounted by about 89%.
Similar content being viewed by others
References
Alvarez F, Veracierto M (1999) Labor market policies in an equilibrium search model. NBER Macroeconomic Annual 14:263–304
Antunes A, Cavalcanti T, Villamil A (2006) The effect of financial repression & enforcement on entrepreneurship and economic development. Working paper, University of Illinois, Urbana-Champaign
Antunes AR, Cavalcanti TV (2007) Start up costs, limited enforcement, and the hidden economy. Eur Econ Rev 51(1):203–224
Baer W, Leite AN (1992) The peripheral economy, its performance in isolation and with integration: The case of Portugal. Luso-Braz Rev 29(2):1–43
Baer W, Leite AN (2003) The economy of Portugal within the European Union: 1990–2002. Q Rev Econ Finance 43(5):738–754
Bailly MN, Solow RM (2001) International productivity comparisons built from the firm level. J Econ perspect 15(3):151–172
Bertola G, Rogerson R (1997) Institutions and labor reallocation. Eur Econ Rev 41(6):1147–1171
Blanchard O, Portugal P (2001) What hides behind an unemployment rate: comparing Portuguese and US labor markets. Am Econ Rev 91:187–207
Cavalcanti T (2004) Layoff costs, tenure, and the labor market. Econ Lett 84(3):383–390
Cavalcanti T, Novo A (2005) Institutions and economic development: how strong is the relationship? Empir Econ 30(2):263–276
Chari VV, Kehoe PJ, McGrattan ER (2006) Business cycle accounting. Econometrica (forthcoming)
Correia I, Neves JC, Rebelo S (1995) Business cycles in a small open economy. Eur Econ Rev 39:1089–1113
Gollin D (2002) Getting income shares right. J Polit Econ 110(2)
Groningen Growth and Development Centre and The Conference Board (2003) Total Economy Database. http://www.ggdc.net
Hayashi F, Prescott E (2002) The 1990s in Japan: a lost decade. Rev Econ Dyn 5(1):206–235
Heston A, Summers R, Aten B (2002) Penn World Table Version 6.1. Center for International Comparisons, University of Pensylvania, PA (CICUP)
Jeong H, Townsend RM (2005) Sources of TFP growth: occupational choice and financial deepening. Working Paper, University of Chicago, IL
Lucas Jr RE (1980) Methods and problems in business cycle theory. J Money Credit Bank 12(4):696–715
Parente SL, Prescott E (2000) Barriers to Riches, MIT, Cambridge, MA
Pinheiro M et al (1997) Séries longas para a economia portuguesa. Banco de Portugal
Prescott E (2002) Prosperity and depression. Am Econ Rev 92(2):1–15
Tauchen G (1986) Finite state Markov-Chain approximations to univariate and vector autoregressions. Econ lett 20:177–181
Tavares J (2004) Institutions and economic growth in Portugal: a quantitative exploration. Portuguese Economic Journal 3(1):49–79
Author information
Authors and Affiliations
Corresponding author
About this article
Cite this article
Cavalcanti, T.V. Business cycle and level accounting: the case of Portugal. Port. Econ. J. 6, 47–64 (2007). https://doi.org/10.1007/s10258-006-0017-2
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10258-006-0017-2