Skip to main content
Log in

A sequential method for the evaluation of the VaR model based on the run between exceedances

  • Abhandlungen/Articles
  • Published:
Allgemeines Statistisches Archiv Aims and scope Submit manuscript

Summary:

A technique for sequential assessment of the appropriateness of the VaR model is developed, by drawing on a tool from statistical process control, namely the control chart. We show that an EWMA control chart is the most appropriate instrument for detecting changes in the process of the magnitude of interest in risk management. The robustness of our procedure with respect to violations of some assumptions is examined and it is concluded that our model evaluation technique remains suitable in such cases.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Laurenţiu Mihailescu.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mihailescu, . A sequential method for the evaluation of the VaR model based on the run between exceedances. Allgemeines Statistisches Arch 88, 51– 72 (2004). https://doi.org/10.1007/s101820400159

Download citation

  • Received:

  • Revised:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s101820400159

Keywords:

JEL

Navigation