Abstract

Road construction projects on the territory of the Republic of Croatia are characterized by the overrun of planned costs. The experience of the contractor on previous road projects is an important element that can help to prevent errors and increase the chances of success in similar future projects. Data on construction costs collected from past projects can be used to estimate costs at different stages of the project life cycle through artificial neural networks. In this paper, artificial neural networks (MLP, GRNN, RBFNN) for estimating road construction costs are modeled. During the modeling, the database of roads constructed on the territory of the Republic of Croatia was used. Comparison of performance of neural networks has shown that the GRNN has obtained the best accuracy with MAPE of 13% and coefficient of determination of 0.9595. The neural network has proven to be a promising approach to use in the initial design phase when there is usually a limited or incomplete set of data for cost analysis, and this method could yield much more accurate results and the estimation error could be reduced.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5

Similar content being viewed by others

References

  1. Ambrule VR, Bhirud AN (2017) Use of artificial neural network for pre design cost estimation of building projects. Int J Recent Innov Trends Comput Commun 5(2):173–176

    Google Scholar 

  2. Turochy RE, Hoel LA, Doty RS (2001) Highway project cost estimating methods used in the planning stage of project development. Technical Assistance Report. Virginia Transportation Research Council, Charlottesville

    Google Scholar 

  3. Peško I, Trivunić M, Cirović G, Mučenski V (2013) A preliminary estimate of time and cost in urban road construction using neural networks. Tehnički Vjesnik 20(3):563–570

    Google Scholar 

  4. Al-Zwainy FMS, Aidan IAA (2017) Forecasting the cost of structure of infrastructure projects utilizing artificial neural network model (highway projects as case study). Indian J Sci Technol 10(20):1–12

    Article  Google Scholar 

  5. Petruseva S, Car-Pušić D, Zileska Pancovska V (2016) Predicting construction time by using general regression neural network. Int Sci Conf People Build Environ 4:1805–6784

    Google Scholar 

  6. Lazarevska M, Knezevic M, Cvetkovska M, Trombeva-Gavriloska A (2014) Applications of artificial neural networks in civil engineering. Tehnički Vjesnik 21(6):1353–1359

    Google Scholar 

  7. Naik MG, Radhika VSB (2015) Time and cost analysis for highway road construction project using artificial neural networks. J Constr Eng Proj Manag 4(3):26–31

    Google Scholar 

  8. Pewdum W, Rujirayanyong T, Sooksatra V (2009) Forecasting final budget and duration of highway construction projects. Eng Const Archit Manag 16:544–557

    Article  Google Scholar 

  9. Adeli H (2001) Neural networks in civil engineering: 1989-2000. Comput Aid Civ Infrastruct Eng 16(6):126–142

    Article  Google Scholar 

  10. Aleksander I, Morton H (1990) An introduction to neural computing (2nd ed.). International Thomson Computer Press

  11. Sušanj I (2016) Development of the hydrological rainfall-runoff model based on artificial neural network in small catchments. Dissertation, University of Rijeka

  12. Ahiaga-Dagbui DD, Smith SD (2012) Neural networks for modelling the final target cost of water projects In: Smith SD (Ed) Proceedings 28th Annual ARCOM Conference, 3–5 September 2012, Edinburgh, UK, Association of Researchers in Construction Management, pp 307–316

  13. Elbeltagi E, Hosny O, Abdul-Razek R, El-Fitory A (2014) Conceptual cost estimate of Libyan highway projects using artificial neural network. Int J Eng Res Appl 4(8):56–66

    Google Scholar 

  14. Ilić V (1999) Neural Networks. Available at: http://solair.eunet.rs/~ilicv/neuro.html. Accessed 01 Feb 2019

  15. Flood I (2006) Next generation artificial neural networks for civil engineering. J Comput Civ Eng 20(5):305–307

    Article  Google Scholar 

  16. Adeli H, Yeh C (1989) Perceptron learning in engineering design. Comput Aid Civ Infrastruct Eng 4(4):247–256

    Article  Google Scholar 

  17. Kim G, An S, Kang K (2004) Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Int J Project Manage 22:595–602

    Article  Google Scholar 

  18. Hegazy T, Ayed A (1998) Neural network model for parametric cost estimation of highway projects. J Constr Eng Manag 124(3):210–218

    Article  Google Scholar 

  19. Wilmot CG, Mei B (2005) Neural network modeling of highway construction costs. J Constr Eng Manag 131(7):765–771

    Article  Google Scholar 

  20. Wang XZ, Duan XC, Liu JY (2010) Application of neural network in the cost estimation of highway engineering. J Comput 5(11):1762–1766

    Google Scholar 

  21. Attal A (2010) Development of neural network models for prediction of highway construction cost and project duration. Dissertation, Russ College of Engineering and Technology of Ohio University

  22. Shebab T (2012) Cost estimating model for sustainable rehabilitation of road projects. Final report, METRANS project

  23. Hunter K (2014) Estimating preconstruction services costs for highway projects. Dissertation, Iowa State University

  24. Adel K, Elyamany A, Belal AM, Kotb AS (2016) Developing parametric model for conceptual cost estimate of highway projects. Int J Eng Sci Comput 6(7):1729–1734

    Google Scholar 

  25. Peško I, Mučenski V, Šešlija M, Radović N, Vujkov A, Bibić D, Krklješ M (2017) Estimation of costs and durations of construction of urban roads using ANN and SVM. Complexity 2017

  26. Barros LB, Marcy MI, Carvalho MTM (2018) Construction cost estimation of Brazilian highways using artificial neural networks. Int J Struct Civ Eng Res 7(3):283–289

    Article  Google Scholar 

  27. O’Connor JT, Chou JS (2007) Internet-based preliminary highway construction cost estimating database. Autom Constr 17(1):65–74

    Article  Google Scholar 

  28. Kim DY, Kim B, Han SH (2008) Two-staged early cost estimation for highway construction projects. In: The 25th international symposium on automation and robotics in construction, institute of internet and intelligent technologies, pp 490–495

  29. Chou JS (2009) Generalized linear model-based expert system for estimating the cost of transportation projects. Expert Syst Appl 36(3):4253–4267

    Article  Google Scholar 

  30. Sodikov J (2009) Road cost models for prefeasibility studies in developing countries. J Infrastruct Syst 15(4):278–289

    Article  Google Scholar 

  31. Huntington G, Ksaibati K (2009) Annualized road works cost estimates for unpaved roads. J Transp Eng 135(10):702–710

    Article  Google Scholar 

  32. Choi S, Kim DY, Han SH, Kwak YH (2014) Conceptual cost-prediction model for public road planning via rough set theory and case-based reasoning. J Constr Eng Manag 140(1):04013026

    Article  Google Scholar 

  33. Ćirilović J, Vajdić N, Mladenović G, Queiroz C (2014) Developing cost estimation models for road rehabilitation and reconstruction: case study of projects in Europe and central Asia. J Constr Eng Manag 140(3):04013065

    Article  Google Scholar 

  34. Lu Y, Lou X, Zhang H (2011) A gene expression programming algorithm for highway construction cost predicition problems. J Transp Syst Eng Inf Technol 11(6):85–92

    Google Scholar 

  35. Mahamid I, Bruland A (2010) Preliminary cost estimating models for road construction activities. FIG Congress 2010:11–16

    Google Scholar 

  36. Mahamid I (2013) Conceptual cost estimate of road construction projects in Saudi Arabia. Jordan J Civ Eng 7(3):285–294

    Google Scholar 

  37. Sherrod P (2013) DTREG predictive modelling software. http://www.dtreg.com. Accessed 01 July 2019

  38. Car-Pušić D (2004) Planning methodology for sustainable construction time. Dissertation, University of Zagreb

  39. Korajac J (2017) Sources of cost and time overruns in road construction projects. Josip Juraj Strossmayer University of Osijek, Thesis

    Google Scholar 

  40. Lončarić S (2018) Natural networks: multilayerd perceptron. http://www.aes.hr/_download/repository/06-ViseslojniPerceptron-1s.pdf. Accessed 01 Feb 2019

  41. Educational repository for intelligent systems. http://eris.foi.hr/11neuronske/nn-predavanje5.html. Accessed 01 Feb 2019

  42. Ghaderzadeh M, Fein R, Standring A (2013) Comparing performance of different neural networks for early detection of cancer from benign hyperplasia of prostate. Appl Med Inform 33(3):45–54

    Google Scholar 

  43. Al-Mahasneh AJ, Anavatti SG, Garratt MA (2018) Review of applications of generalized regression neural networks in identification and control of dynamic systems. Neural Evolut Comput. http://arxiv.org/abs/arXiv:1805.11236

  44. Petruseva S, Zileska-Pancovska V, Car-Pušić D (2019) Implementation of process-based and data-driven models for early prediction of construction time. Adv Civ Eng 2019:1–12

    Article  Google Scholar 

  45. Hackerearth blog (2017) Radial basis function network. https://www.hackerearth.com/blog/uncategorized/radial-basis-function-network/. Accessed 01 Feb 2019

  46. Bullinaria J (2004) Radial basis function networks: introduction. http://www.cs.bham.ac.uk/~jxb/NN/l12.pdf. Accessed 01 Feb 2019

Download references

Funding

This work has been partly supported by the University of Rijeka under the Project Number 13.05.1.3.10.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ksenija Tijanić.

Ethics declarations

Conflict of interest

The authors declare that they have no conflict of interest.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Tijanić, K., Car-Pušić, D. & Šperac, M. Cost estimation in road construction using artificial neural network. Neural Comput & Applic 32, 9343–9355 (2020). https://doi.org/10.1007/s00521-019-04443-y

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00521-019-04443-y

Keywords

Navigation