Abstract
In this paper, we study a production system that operates under a lead-time performance constraint which guarantees the completion of an order before a pre-determined lead-time with a certain probability. The demand arrival times and the service requirements for the orders are random. To reduce the capacity-related operational costs, the production system under study has the option to use flexible capacity. We focus on periodic capacity policies and model the production system as a queuing system that can change its capacity periodically and choose to operate in one of the two levels: a permanent capacity level and a permanent plus contingent capacity level. Contingent capacity is supplied if needed at the start of a period, and is available during that period, at a cost rate that is decreasing in period length in different functional forms. Next, we propose a search algorithm that finds the capacity levels and the switching point that minimizes the capacity-related costs for a given period length. The behaviour of the capacity-related costs changes drastically under different period lengths and cost structures. In our computational study, we observe that the periodic capacity flexibility can reduce the capacity-related operational costs significantly (up to 35%). However, in order to achieve these savings, the period length must be chosen carefully depending on ambition level and capacity-related costs. We also observe that the percentage savings are higher for more ambitious lead-time performance constraints. Moreover, we observe that the use of contingent capacity makes the total system costs more insensitive to the lead-time performance requirements.
Article PDF
Similar content being viewed by others
Avoid common mistakes on your manuscript.
References
Ballou RH (1998) Business logistics management. Prentice Hall, Upper Saddle River
Bradley J, Glynn P (2002) Managing capacity and inventory jointly in manufacturing systems. Manag Sci 48: 273–288
Chenery HB (1952) Overcapacity and the acceleration principle. Econometrica 20: 1–28
Crabill T (1972) Optimal control of a service facility with variable exponential service times and constant arrival rate. Manag Sci 18: 560–566
Eberly JC, van Mieghem JA (1997) Multi-factor dynamic investment under uncertainty. J Econ Theory 75: 345–387
Ehrenberg RG, Smith RS (1994) Modern labor economics: theory and public policy. HarperCollins, New York
Gans N, Koole G, Mandelbaum A (2003) Telephone Call Centers: tutorial, review and research prospects. Manuf Serv Oper Manag 5(2): 79–141
Holt CC, Modigliani F, Muth JF, Simon HA (1960) Planning production, inventories and work force. Prentice-Hall, Englewood Cliffs
Houseman SN (2001) Why employers use flexible staffing arrangements: evidence from an establishment survey. Ind Labor Relat Rev 55: 149–170
Kalleberg AL, Reynolds J, Marsden PV (2003) Externalizing employment: flexible staffing arrangements in U.S. organizations. Soc Sci Res 32: 525–552
Keskinocak P, Tayur S (2004) Due date management policies. In: Simchi-Levi D, Wu SD, Chen ZM (eds) Handbook of quantitative supply chain analysis: modelling in the eBusiness era. Kluwer, Norwell, pp 311–328
Kulkarni VG (1999) Modeling, analysis, design, and control of stochastic systems. Springer, New York
Ledermann W, Reuter GEH (1954) Spectral theory for the differential equations of simple birth and death processes. Phil Trans R Soc Lond A 246: 321–369
Lippman SA (1975) Applying a new device in the optimization of exponential queuing systems. Oper Res 23: 687–710
Little J (1961) A proof of the theorem L = λ W. Oper Res 9: 383–387
Milner J, Pinker E (2001) Contingent labor contracting under demand and supply uncertainty. Manag Sci 47(8): 1046–1062
Mincsovics G, Dellaert NP (2009) Workload-dependent capacity control in production-to-order systems. IIE Trans 41(10): 853–865
Pinker EJ (1996) Models of flexible workforce management in uncertain environments. PhD thesis, Massachusetts Institute of Technology
Pinker EJ, Larson RC (2003) Optimizing the use of contingent labor when demand is uncertain. Eur J Oper Res 144(1): 39–55
Puterman ML (1994) Markov decision processes-discrete stochastic dynamic programming. Wiley, New York
Rao US, Swaminathan JM, Zhang J (2005) Demand and production management with uniform guaranteed lead time. Prod Oper Manag 14(4): 400–412
Rosen S (1986) The theory of equalizing differentials. In: Ashenfelter O, Layard R (eds) Handbook of labor economics, vol 1. North-Holland, pp 641–692
Ross SM (1996) Stochastic processes, 2nd edn. Wiley, New York
Sennott LI (1999) Stochastic dynamic programming and the control of queueing systems. Wiley, New York
Stern TE (1979) Approximations of queue dynamics and their application to adaptive routing in computer communication networks. IEEE Trans Commun 27(9): 1331–1335
Tan B (2004) Subcontracting with availability guarantees: production control and capacity decisions. IIE Trans 36: 711–724
Tan B, Gershwin S (2004) Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Ann Oper Res 125: 205–232
Tan T, Alp O (2009) An integrated approach to inventory and flexible capacity management subject to fixed costs and non-stationary stochastic demand. OR Spectrum 31: 337–360
Acknowledgments
The authors would like to thank the anonymous review team for their valuable feedback and suggestions, Dr. Turgut Aykin from ac2 solutions for insightful discussions and Daniel Hamermesh from UT of Austin for his guidance in Labor Economics.
Open Access
This article is distributed under the terms of the Creative Commons Attribution Noncommercial License which permits any noncommercial use, distribution, and reproduction in any medium, provided the original author(s) and source are credited.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Open Access This is an open access article distributed under the terms of the Creative Commons Attribution Noncommercial License (https://creativecommons.org/licenses/by-nc/2.0), which permits any noncommercial use, distribution, and reproduction in any medium, provided the original author(s) and source are credited.
About this article
Cite this article
Buyukkaramikli, N.C., Bertrand, J.W.M. & van Ooijen, H.P.G. Periodic capacity management under a lead-time performance constraint. OR Spectrum 35, 221–249 (2013). https://doi.org/10.1007/s00291-011-0261-4
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00291-011-0261-4