A scheduling method for Berth and Quay cranes

  • Original Paper
  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract.

This paper discusses a method for scheduling Berth and Quay cranes, which are critical resources in port container terminals. An integer programming model is formulated by considering various practical constraints. A two-phase solution procedure is suggested for solving the mathematical model. The first phase determines the Berthing position and time of each vessel as well as the number of cranes assigned to each vessel at each time segment. The subgradient optimization technique is applied to obtain a near-optimal solution of the first phase. In the second phase, a detailed schedule for each Quay crane is constructed based on the solution found from the first phase. The dynamic programming technique is applied to solve the problem of the second phase. A numerical experiment was conducted to test the performance of the suggested algorithms.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

RID="*"

ID="*" This research has been supported in part by Brain Korea 21 Program (1999–2002).

Correspondence to: Y.-M. Park

Rights and permissions

Reprints and permissions

About this article

Cite this article

Park, YM., Kim, K. A scheduling method for Berth and Quay cranes. OR Spectrum 25, 1–23 (2003). https://doi.org/10.1007/s00291-002-0109-z

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-002-0109-z

Navigation