Abstract
The research analyzes the particularities of the Mexican maquiladora industry in the Just in Time (JIT) implementation process as a global example of maquiladoras, analyzing 31 competitive advantages or benefits obtained after a JIT implementation process, which were integrated into four dimensions: Human Resources, Production Process, Inventory Management, and Economic Performance of companies. The study proposes a structural equation model which assumes that human factor is the most important benefit obtained after JIT implementation and is proposed as the initial or independent latent variable, being the final latent variable or last benefits the company’s Economic Performance. The final results in the model show how the capabilities and skills in Human Resources affect 86 % of the variance of the Production Process, which together explains the 82 % of Inventory Management. Finally, Human Resources, Production Process, and Inventory Management explain 79 % of Economic Performance obtained from JIT.
Similar content being viewed by others
References
Gupta A (2011) A conceptual JIT model of service quality. Int J Eng Sci Tech 3(3):2414–2427
Helm R, Gritsch S (2014) Examining the influence of uncertainty on marketing mix strategy elements in emerging business to business export-markets. Int Bus Rev 23(2):418–428. doi:10.1016/j.ibusrev.2013.06.007
Marín F, Delgado J (2000) Las técnicas justo a tiempo y su repercusión en los sistemas de producción. Econ Ind 331:35–41
Eng T-Y, Ozdemir S (2014) International R&D partnerships and intrafirm R&D–marketing–production integration of manufacturing firms in emerging economies. Indust Mark Manag 43(1):32–44. doi:10.1016/j.indmarman.2013.07.013
Balasubramanian R, Padhi A (2005) The next wave in US offshoring. McKinsey Q 1:6–9
Jun M, Cai S, Shin H (2006) TQM practice in maquiladora: antecedents of employee satisfaction and loyalty. J Oper Manag 24(6):791–812. doi:10.1016/j.jom.2005.09.006
Hadjimarcou J, Brouthers LE, McNicol JP, Michie DE (2013) Maquiladoras in the 21st century: six strategies for success. Bus Horiz 56(2):207–217. doi:10.1016/j.bushor.2012.11.005
Inegi (2013) Monthly statistics for manufacturing industry, maquiladora and export services (immex). Mexican national institute of statistics and geography, Mexico, DF
Machuca JAD (2002) JIT facing the new millennium. Int J Prod Econ 80((2):131–134. doi:10.1016/S0925-5273(02)00312-2
Singh S, Garg D (2011) JIT system: concepts, benefits and motivations in Indian Industries. Int J Manag Bus Stud 1(1):26–30
Contreras OF, Carrillo J, Alonso J (2012) Local entrepreneurship within global value chains: a case study in the Mexican automotive industry. World Dev 40(5):1013–1023. doi:10.1016/j.worlddev.2011.11.012
Sargent J, Matthews L (2009) China versus Mexico in the Global EPZ Industry: Maquiladoras, FDI quality, and plant mortality. World Dev 37(6):1069–1082. doi:10.1016/j.worlddev.2008.10.002
Lawrence JJ, Hottenstein MP (1995) The relationship between JIT manufacturing and performance in Mexican plants affiliated with U.S. companies. J Oper Manag 13(1):3–18. doi:10.1016/0272-6963(95)00018-N
Garg D, Deshmukh S (1999) JIT purchasing: literature review and implications for Indian industry. Prod Plan Control 10(3):276–285. doi:10.1080/095372899233235
Garg D, Deshmukh S, Kaul O (1996) Critical analysis in JIT purchasing in Indian context. Product J 37:271–279
Kumar V (2010) JIT based quality management: concepts and implications in indian context. Int J Eng Sci Technol 2(1):40–50
Bonavia T, Marin-Garcia JA (2011) Integrating human resource management into lean production and their impact on organizational performance. Int J Manpow 32(8):923–938. doi:10.1108/01437721111181679
Power D, Sohal AS (2000) Human resource management strategies and practices in just-in-time environments: Australian case study evidence. Technovation 20(7):373–387. doi:10.1016/S0166-4972(99)00151-0
Inman RA, Sale RS, Green KW Jr, Whitten D (2011) Agile manufacturing: relation to JIT, operational performance and firm performance. J Oper Manag 29(4):343–355. doi:10.1016/j.jom.2010.06.001
Dong Y, Carter CR, Dresner ME (2001) JIT purchasing and performance: an exploratory analysis of buyer and supplier perspectives. J Op Manag 19(4):471–483. doi:10.1016/S0272-6963(00)00066-8
Bonito J (1990) Motivating employees for continuous improvement efforts. Prod Invent Manag Rev APICS News 8:225–236
Chong V, Rundus M (2000) The effect of new manufacturing practices and intensity of market competition on organizational performance: an empirical investigation. Paper presented at the International Conference on Management Research Accounting Research and Case Symposium, Mesa, AZ, USA, January 6–8, 2000
Ebrahtmpour M, Schonberger RJ (1984) The Japanese just-in-time/total quality control production system: potential for developing countries. Int J Prod Res 22(3):421–430. doi:10.1080/00207548408942463
Bartezzaghi E, Turco F, Spina G (1992) The impact of the just-in-time approach on production system performance: a survey of Italian industry. Int J Oper Prod Manag 12(1):5. doi:10.1108/EUM0000000001292
Kumar V, Garg D (2000) JIT elements in Indian context: an analysis. Product J 41(2):217–222
Macbeth DK, Baxter L, Farguson N, Neil G (1988) Buyer-vendor relationship with just-in-time: lessons from us multinationals. Ind Eng 20(9):38–41
Martel M (1993) The role of just-in-time purchasing in Dynapert’s transition to world class manufacturing. Prod Invent Manag J 34:71–76
Parnaby J (1988) A systems approach to the implementation of JIT methodologies in Lucas Industries. Int J Prod Res 26(3):483–492. doi:10.1080/00207548808947878
Sakurai K (1986) Japanese worker attitudes: a key factor in productivity. Int J Oper Prod Manag 6(1):42–53. doi:10.1108/eb054754
Balakrishnan R, Linsmeier T, Venkatakchalam M (1996) Financial benefits from JIT adoption: effects of customer concentration and cost structure. Account Rev 71(2):183–205
Hall R (1983) Zero inventories. Dow Jones-Irwin, Homewood
Hong J-D, Hayya JC, Kim S-L (1992) JIT purchasing and setup reduction in an integrated inventory model. Int J Prod Res 30(2):255–266. doi:10.1080/00207549208942893
Singhvi S (1992) Employee involvement in JIT success: Eicher experience. Product J 33:366–369
Ha D, Kim S-L (1997) Implementation of JIT purchasing: an integrated approach. Prod Plan Control 8(2):152–157. doi:10.1080/095372897235415
Fiedler K, Galletly JE, Bicheno J (1993) Expert advice for JIT implementation. Int J Oper Prod Manag 13(6):23–30. doi:10.1108/01443579310038994
Dutton B (1990) Switching to quality excellence. Manuf Syst 8:245–256
Padukone H, Subba R (1993) Global status of JIT-implication for developing countries. Product J 34(3):419–429
Singh P, Bhandarkar A (1996) Paradigm shift in Indian industries: the need for tolerance of ambiguity. MDI Manag J 9:106–112
Bozbura FT, Beskese A, Kahraman C (2007) Prioritization of human capital measurement indicators using fuzzy AHP. Expert Syst Appl 32(4):1100–1112. doi:10.1016/j.eswa.2006.02.006
Flynn B, Salakibara S, Schroeder R (1995) Relationship between JIT and TQM practices and performance. Acad Manag J 38(5):1325–1360
Garg D (1997) Relevance of JIT purchasing in Indian industries. Kurukshetra University, India
Roy R, KK G (1996) IT: world scenario and possibility of its applicability in Indian industries. Paper presented at the National conference on operation research in modern technology, REC Kurukshetra, India, March 8–9
Green KW Jr, Inman RA, Birou LM, Whitten D (2014) Total JIT (T-JIT) and its impact on supply chain competency and organizational performance. Int J Prod Econ 147(Part A):125–135. doi:10.1016/j.ijpe.2013.08.026
Prodipto R (1999) Data warehousing for textiles, Texinfotech-99. Paper presented at the Techno park (I) Ltd, New Delhi
Vrat P, Mittal S, Tyagi K (1993) Implementation of JIT in Indian environment: a Delhi study. Product J 34:251–256
Bortolotti T, Danese P, Romano P (2012) Assessing the impact of just-in-time on operational performance at varying degrees of repetitiveness. Int J Prod Res 51(4):1117–1130. doi:10.1080/00207543.2012.678403
Giunipero LC, Law WK (1990) Organizational support for just-in-time implementation. Int J Logist Manag 1(2):35–40. doi:10.1108/09574099010804572
Priestman S (1985) SQC and JIT: partnership in quality, does culture make a difference. Qual Prog 18(5):31–35
Singh A (1989) Just-in-time system: an integrated system. Product J 30(3):309–314
RC B, RE C, IC C (1994) Switching rules for JIT purchasing. Prod Invent Manag J 35(3):13–17
Vuppalapati K, Ahire SL, Gupta T (1995) JIT and TQM: a case for joint implementation. Int J OperProd Manag 15(5):84–94. doi:10.1108/01443579510083686
Boer J, Blaga P (2012) A more efficient production using quality tools and human resources management. Procedia Econ Finance 3(0):681–689. doi:10.1016/S2212-5671(12)00214-6
Blaga P, Jozsef B (2014) Increasing human resource efficiency in the production process. Procedia Technol 12(0):469–475. doi:10.1016/j.protcy.2013.12.516
Jabbour CJC, Jabbour ABLS, Govindan K, Teixeira AA, Freitas WRS (2013) Environmental management and operational performance in automotive companies in Brazil: the role of human resource management and lean manufacturing. J Clean Prod 47(0):129–140. doi:10.1016/j.jclepro.2012.07.010
Martínez-Jurado PJ, Moyano-Fuentes J, Jerez-Gómez P (2014) Human resource management in lean production adoption and implementation processes: success factors in the aeronautics industry. BRQ Bus Res Q 17(1):47–68. doi:10.1016/j.cede.2013.06.004
Jayaram J, Das A, Nicolae M (2010) Looking beyond the obvious: unraveling the Toyota production system. Int J Prod Econ 128(1):280–291. doi:10.1016/j.ijpe.2010.07.024
Narayana SA, Kumar Pati R, Vrat P (2014) Managerial research on the pharmaceutical supply chain—a critical review and some insights for future directions. J Purch Supply Manag 20(1):18–40. doi:10.1016/j.pursup.2013.09.001
Lengnick-Hall ML, Lengnick-Hall CA, Rigsbee CM (2013) Strategic human resource management and supply chain orientation. Hum Resour Manag Rev 23(4):366–377. doi:10.1016/j.hrmr.2012.07.002
Greer CR, Ireland TC, Wingender JR (2001) Contrarian human resource investments and financial performance after economic downturns. J Bus Res 52(3):249–261. doi:10.1016/S0148-2963(99)00108-3
Kesti M (2012) Organization human resources development connection to business performance. Procedia Econ Financ 2(0):257–264. doi:10.1016/S2212-5671(12)00086-X
Lampel J, Giachetti C (2013) International diversification of manufacturing operations: performance implications and moderating forces. J Oper Manag 31(4):213–227. doi:10.1016/j.jom.2013.04.001
Katou AA, Budhwar PS (2010) Causal relationship between HRM policies and organisational performance: evidence from the Greek manufacturing sector. Eur Manag J 28(1):25–39. doi:10.1016/j.emj.2009.06.001
Fullerton RR, McWatters CS (2001) The production performance benefits from JIT implementation. J Oper Manag 19(1):81–96. doi:10.1016/S0272-6963(00)00051-6
Hofer C, Eroglu C, Rossiter Hofer A (2012) The effect of lean production on financial performance: the mediating role of inventory leanness. Int J Prod Econ 138(2):242–253. doi:10.1016/j.ijpe.2012.03.025
Brox JA, Fader C (1997) Assessing the impact of JIT using economic theory. J Oper Manag 15(4):371–388. doi:10.1016/S0272-6963(97)00005-3
González-Benito J, Suárez-González I, Spring M (2000) Complementarities between JIT purchasing practices: an economic analysis based on transaction costs. Int J Prod Econ 67(3):279–293. doi:10.1016/S0925-5273(00)00032-3
Cao Q, Schniederjans M (2004) A revised EMQ/JIT production-run model: an examination of inventory and production costs. Int J Prod Econ 87(1):83–95
Maiga AS, Jacobs FA (2009) JIT performance effects: a research note. Adv Account 25(2):183–189. doi:10.1016/j.adiac.2009.06.003
Singh R, SH S, Metri B, Kaur R (2011) Organizational performance and retail challenges: a structural equation approach. Sci Res 3:159–168
Cronbach L (1951) Coefficient alpha and the internal structure of tests. Psychometrika 16(3):297–334. doi:10.1007/BF02310555
Liu H, Ke W, Wei KK, Hua Z (2013) The impact of IT capabilities on firm performance: the mediating roles of absorptive capacity and supply chain agility. Decis Support Syst 54(3):1452–1462. doi:10.1016/j.dss.2012.12.016
Nunnaly J (1978) Psychometric theory. Mc Graw Hill, New York
Fornell C, Larcker D (1981) Evaluating structural equation models with unobservable variables and measurement error. J Mark Res 18(1):39–50
Nunnaly J, Bernstein I (1994) Psychometric theory. Mc Graw Hill, New York
Rexhausen D, Pibernik R, Kaiser G (2012) Customer-facing supply chain practices—the impact of demand and distribution management on supply chain success. J Oper Manag 30(4):269–281. doi:10.1016/j.jom.2012.02.001
Lin C, Chow W, Madu C, Kuei C, Pei Y (2005) A structural equation model of supply chain quality management and organizational performance. Int J Prod Econ 96(3):355–365
Zailani S, Jeyaraman K, Vengadasan G, Premkumar R (2012) Sustainable supply chain management (SSCM) in Malaysia: a survey. Int J Prod Econ 140(1):330–340. doi:10.1016/j.ijpe.2012.02.008
Ramanathan U, Gunasekaran A (2014) Supply chain collaboration: impact of success in long-term partnerships. Int J Prod Econ 147(0):252–259. doi:10.1016/j.ijpe.2012.06.002
Blome C, Schoenherr T, Eckstein D (2014) The impact of knowledge transfer and complexity on supply chain flexibility: a knowledge-based view. Int J Prod Econ 147(0):307–316. doi:10.1016/j.ijpe.2013.02.028
Hair J, Anderson R, Tatham R (1987) Multivariate data analysis. Macmillan, New York
Hair J, Black W, Babin B, Anderson R (2009) Multivariate data analysis. Prentice Hall, Upper Saddle River
Giaquinta M (2009) Mathematical analysis: an introduction to functions of several variables. Springer, New York
Kaiser H (2010) Mathematical programming for agricultural, environmental, and resource economics. Wiley, Hoboken
Rosenthal R, Rosnow R (1991) Essentials of behavioral research: methods and data analysis. Mc Graw Hill, Boston
Wold S, Trygg J, Berglund A, Antti H (2001) Some recent developments in PLS modeling. Chemometr Intell Lab Syst 58(2):131–150. doi:10.1016/S0169-7439(01)00156-3
García-Alcaraz J, Maldonado-Macias A, Iniesta AA, Robles GC, Hernández GA (2014) A systematic review/survey for JIT implementation: Mexican maquiladoras as case study. Comput Ind 65(4):761–773. doi:10.1016/j.compind.2014.02.013
García-Alcaraz J, Maldonado A, Alvarado A, Rivera D (2014) Human critical success factors for kaizen and its impacts in industrial performance. Int J Adv Manuf Technol 70(9–12):2187–2198. doi:10.1007/s00170-013-5445-4
Avelar-Sosa L, García-Alcaraz J, Vergara-Villegas O, Maldonado-Macías A, Alor-Hernández G (2014) Impact of traditional and international logistic policies in supply chain performance. Int J Adv Manuf Technol 1–13. doi:10.1007/s00170-014-6308-3
Kock N (2013) Using WarpPLS in e-collaboration studies: what if I have only one group and one condition. Int J e-Collab 9(3):12
Cenfetelli R, Bassellier G (2009) Interpretation of formative measurement in information systems research. MIS Q 33(4):19
Petter S, Straub D, Rai A (2007) Specifying formative constructs in information systems research. MIS Q 31(4):623–656
Kline R (1998) Principles and practice of structural equation modeling. Guilford, New York
Tastle WJ, Wierman MJ (2007) Consensus and dissention: a measure of ordinal dispersion. Int J Approx Reason 45(3):531–545. doi:10.1016/j.ijar.2006.06.024
García-Alcaraz J, Rivera L, Blanco J, Jiménez E, Martínez E (2014) Structural equations modelling for relational analysis of JIT performance in maquiladora sector. Int J Prod Res 52(17):4931–4949. doi:10.1080/00207543.2014.885143
Merschmann U, Thonemann UW (2011) Supply chain flexibility, uncertainty and firm performance: an empirical analysis of German manufacturing firms. Int J Prod Econ 130(1):43–53. doi:10.1016/j.ijpe.2010.10.013
Yang S, Albert R, Carlo TA (2013) Transience and constancy of interactions in a plant-frugivore network. Ecosphere 4(12):147. doi:10.1890/ES13-00222.1
Ketkar M, Vaidya OS (2012) Study of emerging issues in supply risk management in India. Procedia Soc Behav Sci 37(0):57–66. doi:10.1016/j.sbspro.2012.03.275
Fullerton RR, McWatters CS (2002) The role of performance measures and incentive systems in relation to the degree of JIT implementation. Account Organ Soc 27(8):711–735. doi:10.1016/S0361-3682(02)00012-0
Świerczek A (2013) The impact of supply chain integration on the “snowball effect” in the transmission of disruptions: an empirical evaluation of the model. Int J Prod Econ. doi:10.1016/j.ijpe.2013.08.010
White RE, Prybutok V (2001) The relationship between JIT practices and type of production system. OMEGA 29(2):113–124. doi:10.1016/S0305-0483(00)00033-5
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
García-Alcaraz, J.L., Prieto-Luevano, D.J., Maldonado-Macías, A.A. et al. Structural equation modeling to identify the human resource value in the JIT implementation: case maquiladora sector. Int J Adv Manuf Technol 77, 1483–1497 (2015). https://doi.org/10.1007/s00170-014-6561-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-014-6561-5