Abstract
Tunnel design and construction consist of multiple sub-processes among which the selection of proper ventilation system is one of the most important issues. In this problem, several criteria are included in the process; therefore, multi-attribute decision making (MADM) tools should be used for the purpose. One of frequently used MADM methods is fuzzy analytic hierarchy process (AHP) in which uncertainty is also taken into account in the decision-making process. In this paper, using fuzzy data envelopment analysis, a new approach is presented for ranking the alternatives in fuzzy AHP. In this approach, the fuzzy nature of data is kept in all steps of the approach. Furthermore, to determine the consistency level of fuzzy pairwise comparison matrix, an appropriate index is used. Then, the proposed approach is used for selecting the best tunnel ventilation system.
Similar content being viewed by others
References
Ataei M (2005) Multicriteria selection for alumina–cement plant location in East-Azerbaijan province of Iran. J South Afr Inst Min Metall 105(7):507–514
Bascetin A (2004) Technical note: an application of the analytic hierarchy process in equipment selection at Orhaneli open pit coal mine. Min Technol 113(3):192–A199
Bascetin A (2007) Decision support system using analytical hierarchy process (AHP) for the optimal environmental reclamation of an open-pit mine. Environ Geol 52(4):663–672
Bottero M, Peila D (2005) The use of the Analytic Hierarchy Process for the comparison between microtunnelling and trench excavation. Tunn Undergr Space Technol 20(6):501–513
Chang DY (1996) Applications of the extent analysis method on fuzzy AHP. Eur J Oper Res 95(3):649–655
Charnes A, Cooper W, Rhodes E (1978) Measuring the efficiency of decision making units. Eur J Oper Res 2(6):429–444
Hwang C, Masud A (1979) Multiple objective decision making—methods and applications: a state-of-the-art survey. Springer, Berlin
Marbini AH, Emrouznejad A, Tavana M (2011) A taxonomy and review of the fuzzy data envelopment analysis literature: two decades in the making. Eur J Oper Res 214(3):457–472
Pursall BR (1976) The aerodynamics and ventilation of vehicle tunnels. BHRA Fluid Engineering, Cranfield
Ramanathan R (2006) Data envelopment analysis for weight derivation and aggregation in the analytic hierarchy process. Comput Oper Res 33(5):1289–1307
Ramik J, Korviny P (2010) Inconsistency of pair-wise comparison matrix with fuzzy elements based on geometric mean. Fuzzy Sets Syst 161(11):1604–1613
Samanta B, Sarkar B, Murherjee SK (2002) Selection of opencast mining equipment by a multi-criteria decision-making process. Min Technol 111(2):136–142
Tone K (2001) A slacks-based measure of efficiency in data envelopment analysis. Eur J Oper Res 130(3):498–509
Wang YM, Luo Y, Hua ZS (2008) On the extent analysis method for fuzzy AHP and its applications. Eur J Oper Res 186(2):735–747
Yavuz M, Iphar M, Once G (2008) The optimum support design selection by using AHP method for the main haulage road in WLC Tuncbilek colliery. Tunn Undergr Space Technol 23(2):111–119
Zadeh LA (1965) Fuzzy set. Inf Control 8(3):338–353
Zimmermann HJ (1996) Fuzzy set theory and its application, 3rd edn. Kluwer Academic Publishers
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Mirhedayatian, M., Jelodar, M.J., Adnani, S. et al. A new approach for prioritization in fuzzy AHP with an application for selecting the best tunnel ventilation system. Int J Adv Manuf Technol 68, 2589–2599 (2013). https://doi.org/10.1007/s00170-013-4856-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-013-4856-6