Resource–constrained project scheduling: a heuristic for the multi–mode case

  • Original Papers
  • Published:
OR-Spektrum Aims and scope Submit manuscript

Abstract.

This paper presents a heuristic solution procedure for a very general resource–constrained project scheduling problem. Here, multiple execution modes are available for the individual activities of the project. In addition, minimum as well as maximum time lags between different activities may be given. The objective is to determine a mode and a start time for each activity such that the temporal and resource constraints are met and the project duration is minimized. Project scheduling problems of this type occur e.g. in process industries. The heuristic is a multi–pass priority–rule method with backplanning which is based on an integration approach and embedded in random sampling. Its performance is evaluated within an experimental performance analysis for problem instances of real–life size with 100 activities and up to 5 modes per activity.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Received: September 22, 2000 / Accepted: May 18, 2001

Rights and permissions

Reprints and permissions

About this article

Cite this article

Heilmann, R. Resource–constrained project scheduling: a heuristic for the multi–mode case. OR Spektrum 23, 335–357 (2001). https://doi.org/10.1007/PL00013354

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/PL00013354

Navigation