Skip to main content
Log in

Railway network design with multiple project stages and time sequencing

  • Published:
Journal of Geographical Systems Aims and scope Submit manuscript

Abstract.

This paper presents a spatial decision support system for network design problems in which different kinds of projects can be built in stages over time. It was developed by the World Bank and China's Ministry of Railways to plan investment strategies for China's overburdened railway system. We first present a mixed-integer program for the single-period network design problem with project choices such as single or multiple tracks and/or electrification with economies of scale. Then, because such projects can be built all at once or in stages, we developed a heuristic backwards time sequencing procedure with a cost adjustment factor to solve the “project staging” problem. Other innovations include a preloading routine; coordinated modeling of arcs, paths, and corridors; and a custom-built GIS.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Received: 5 May 2000/Accepted: 11 August 2000

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kuby, M., Xu, Z. & Xie, X. Railway network design with multiple project stages and time sequencing. J Geograph Syst 3, 25–47 (2001). https://doi.org/10.1007/PL00011465

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/PL00011465

Navigation