Skip to main content
Log in

Problems of planning theory for developing bowels with underground mining of ore deposits

  • Open Pit and Underground Mining Operations
  • Published:
Journal of Mining Science Aims and scope

Abstract

A set of problems is considered for planning underground mining of ore deposits. Achievements are noted in domestic mining science in the field of improving planning methods and design parameters for underground mines. Principles in the development of planning theory for mining enterprises at the contemporary level are formulated.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Institute of Problems of Complex Development of Bowels, Russian Academy of Sciences, Moscow. Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 80–84, May–June, 1999.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kaplunov, D.R. Problems of planning theory for developing bowels with underground mining of ore deposits. J Min Sci 35, 286–290 (1999). https://doi.org/10.1007/BF02550245

Download citation

  • Received:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02550245

Keywords

Navigation