Skip to main content
Log in

Developing an integrated framework for feature-based early manufacturing cost estimation

  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

The major objective of concurrent engineering is to consider the related downstream manufacturing during the design stage. Estimating manufacturing cost during the early design stage is one area that has been given little attention by researchers. However, if the product manufacturing cost can be estimated during the design stage, designers can modify a design to achieve proper performance as well as a reasonable cost at an early stage of the product development process.

Basically, manufacturing cost is determined by shape complexity, product precision and tooling process. That is, if these data can be obtained and considered during the design stage, estimating manufacturing cost during the early product development stage will become a feasible task.

In this research, a framework for estimating the manufacturing cost in terms of a feature-based approach is proposed. This system tends to estimate the manufacturing cost of a design according to the shapes and precision of its features. The objective of this research is to provide a tool to assist a designer, who has little knowledge about the manufacturing process, to estimate the fabrication cost of a design during its conceptual stage, in order to reduce unnecessary costs in the downstream process.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. T. C. Chang,Expert Process Planning for Manufacturing, Addison-Wesley, 1990.

  2. J. J. Shah, D. Hsiao and R. Robison, “A framework for manufacturability evaluation in a feature based CAD system”,Proceeding of NSF Design for Manufacturing Systems Conference, pp. 61–66, 1990.

  3. E. Molley, H. Yang and J. Browne, “Feature-based modeling in design for assembly”,International Journal of Computer Integrated Manufacturing,6 172, pp. 119–125, 1993.

    Google Scholar 

  4. J. Boothroyd and P. Dewhurst,Design for Assembly: A Designers Handbook, Boothroyd Dewhurst Inc., Wakerfield, Rhode Island, 1983.

    Google Scholar 

  5. Y. M. Chen, R. A. Miller and K. R. Vemuri, “On implementing an integrated design-manufacturability assessment environment”,ASME Computers in Engineering 1, pp. 407–413, 1991.

    Google Scholar 

  6. R. D. Stewart,Cost Estimating, 2nd edn, John Wiley & Sons, 1991.

  7. W. Winchell,Realistic Cost Estimating for Manufacturing, 2nd edn, Society of Manufacturing Engineering, 1989.

  8. E. C. Berhardt and G. Bertacchi, “Expert system for molding”, in L. T. Manzione (ed.),Applications of Computer Aided Engineering in Injection Molding, Hanser Publishers, 1987.

  9. D. D. Bedworth, M. R. Henderson and P. M. Wolfe,Computer Integrated Design and Manufacturing, McGraw-Hill Inc., 1991.

  10. P. F. Mirakon, V. H. Eth-Uno and W. E. Eder, “Early cost calculation: reliable calculation, not just estimation”,Proceeding of ASME Design for Manufacturability Conference, pp. 97–104, 1993.

  11. M. S. Hundal, “Rules and models for low-cost design”,Proceeding of ASME Design for Manufacturability Conference, pp. 75–84, 1993.

  12. P. Dewhurst and G. Boothroyd, “Early cost estimation in product design”,Journal of Manufacturing Systems 7(3), pp. 183–191, 1988.

    Google Scholar 

  13. R. C. McIlhenny, T. S. Sethumadhave, K. S. Lee and L. K. Keys, “An integrated system approach to facilitate early cost estimation”,Proceeding of ASME Design for Manufacturability Conference, pp. 105–109, 1993.

  14. L. K. Keys, J. R. Balmer and R. A. Creswell, “Electronic manufacturing process systems cost modeling and simulation tools”,IEEE Transactions on Components, Hybrids, and Manufacturing Technology, vol. CHMT-10(3), pp. 401–410, 1987.

    Google Scholar 

  15. J. Bruckner and K. Ehrlenspiel, “Development of cost information tools for the designer example-gear drives”,Proceeding of ASME Design for Manufacturability Conference, pp. 111–115, 1993.

  16. D. Sheldon, G. Huang and R. Perks, “Specification and development of cost-estimating databases for engineering design”,Proceeding of ASME Design for Manufacturability Conference, pp. 91–96, 1993.

  17. T. C. Chang, R. A. Wysk and H. P. Wang,Computer-aided Manufacturing, Prentice-Hall, 1991.

  18. J. E. Schey,Introduction to Manufacturing Processes. 2nd edn, McGraw Hill, 1987.

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Ou-Yang, C., Lin, T.S. Developing an integrated framework for feature-based early manufacturing cost estimation. Int J Adv Manuf Technol 13, 618–629 (1997). https://doi.org/10.1007/BF01350820

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01350820

Keywords

Navigation