Skip to main content
Log in

An iterative approach to system setup problems in flexible manufacturing systems

  • Published:
International Journal of Flexible Manufacturing Systems Aims and scope Submit manuscript

Abstract

System setup problems in flexible manufacturing systems deal with short-term planning problems such as part type selection, machine grouping, operation assignment, tooling, fixture and pallet allocation, and routing. In this article, we consider three of the subproblems: part type selection, machine grouping, and loading. We suggest a heuristic approach to solve the subproblems consistently with the objective of maximizing the expected production rate. The proposed procedure includes routines to generate all possible machine grouping alternatives for a given set of machines, to obtain optimal target workloads for each grouping alternative, and to allocate operations and tools to machine groups. These routines are executed iteratively until a good solution to the system setup problem is obtained. Computational experience is reported.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ammons, J.C., Lofgren, C.B., and McGinnis, L.F., “A Large Scale Machine Loading Problem in Flexible Assembly,”Annals of Operations Research, Vol. 3, pp. 319–322 (1985).

    Google Scholar 

  • Avriel, M.,Nonlinear Programming: Analysis and Methods, Prentice-Hall, Englewood Cliffs, NJ (1976).

    Google Scholar 

  • Baker, K.R. and Kanet, J.J., “Job Shop Scheduling with Modified Due Dates,”Journal of Operations Management, Vol. 4, No. 1, pp. 11–22 (1983).

    Google Scholar 

  • Berrada, M. and Stecke, K.E., “A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems,”Management Science, Vol. 32, No. 10, pp. 1316–1335 (1986).

    Google Scholar 

  • Blackstone, J.H. Jr., Phillips, D.T., and Hogg, G.L., “A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations,”International Journal of Production Research, Vol. 20, No. 1, pp. 27–45 (1982).

    Google Scholar 

  • Buzen, J.P., “Computational Algorithms for Closed Queueing Networks with Exponential Servers,”Communications of the ACM, Vol. 16, No. 9, pp. 527–531 (1973).

    Google Scholar 

  • Chakravarty, A.K. and Shtub, S., “Selecting Parts and Loading Flexible Manufacturing Systems,”Proc. of the 1st ORSA/TIMS Special Interest Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), pp. 284–289 (1984).

  • Chakravarty, A.K. and Shtub, S., “Capacity, Cost, and Scheduling Analysis for a Multiproduct Flexible Manufacturing Cell,”International Journal of Production Research, Vol. 25, No. 8, pp. 1143–1156 (1987).

    Google Scholar 

  • Elvers, D.A. and Taube, L.R., “Time Completion for Various Dispatching Rules in Job Shops,”OMEGA, Vol. 11, No. 1, pp. 81–89 (1983).

    Google Scholar 

  • Greene, T.J. and Sadowski, R.P., “A Mixed Integer Program for Loading and Scheduling Multiple Flexible Manufacturing Cells,”European Journal of Operational Research, Vol. 24, No. 3, pp. 379–386 (1986).

    Google Scholar 

  • Hwang, S., “A Constraint-Directed Method to Solve the Part Selection Problem in Flexible Manufacturing Systems Planning Stage,”Proc. of the 2nd ORSA/TIMS Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), Elsevier Science Publishers B.V., Amsterdam, pp. 297–309 (1986).

    Google Scholar 

  • Lashkari, R.S., Dutta, S.P., and Padhye, A.M., “A New Formulation of Operation Allocation Problem in Flexible Manufacturing Systems: Mathematical Modelling and Computational Experience,”International Journal of Production Research, Vol. 25, No. 9, pp. 1267–1283 (1987).

    Google Scholar 

  • Kim, Y-D., “On the Superiority of a Backward Approach in List Scheduling Algorithms for Multi-Machine Makespan Problems,”International Journal of Production Research, Vol. 25, No. 12, pp. 1751–1759 (1987).

    Google Scholar 

  • Kim, Y-D., “An Interative Approach for System Setup Problems of Flexible Manufacturing Systems,” Ph.D. dissertation, Department of Industrial and Operations Engineering, The University of Michigan, Ann Arbor, MI (1988).

    Google Scholar 

  • Kim, Y-D. and Yano, C.A., “A Branch and Bound Approach for the Loading Problem in Flexible Manufacturing Systems: An Unbalancing Case,” Technical Report 87-18, Dept. of I&OE, The University of Michigan, Ann Arbor, MI (1987).

    Google Scholar 

  • Kim, Y-D. and Yano, C.A., “A New Branch and Bound Approach for Loading Problems in Flexible Manufacturing Systems,” Technical Report 89-5, Dept. of I&OE, The University of Michigan (1989).

  • Kim, Y-D. and Yano, C.A., “Heuristic Approaches for Loading Problems in Flexible Manufacturing Systems,” to appear inIIE Transactions (1990).

  • Kiran, A.S. and Tansel, B.C., “The System Setup in FMS: Concepts and Formulation,”Proc. of the 2nd ORSA/TIMS Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), Elsevier Science Publishers B.V., Amsterdam, pp. 321–332 (1986).

    Google Scholar 

  • Kumar, K.R., Kusiak, A., and Vannelli, A., “Grouping of Parts and Components in Flexible Manufacturing Systems,”European Journal of Operational Research, Vol. 24, No. 3, pp. 387–397 (1986).

    Google Scholar 

  • Kusiak, A., “The Part Families Problem in Flexible Manufacturing Systems,”Proc. of the 1st ORSA/TIMS Special Interest Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), pp. 237–242 (1984).

  • O'Grady, P.J. and Menon, U., “A Flexible Multiobjective Production Planning Framework for Automated Manufacturing Systems,”Engineering Costs and Production Economics, Vol. 8, pp. 189–198 (1984).

    Google Scholar 

  • O'Grady, P.J. and Menon, U., “A Multiple Criteria Approach for Production Planning of Automated Manufacturing,”Engineering Optimization, Vol. 8, No. 2, pp. 161–175 (1985).

    Google Scholar 

  • O'Grady, P.J. and Menon, U., “Loading a Flexible Manufacturing System,”International Journal of Production Research, Vol. 25, No. 7, pp. 1053–1068 (1987).

    Google Scholar 

  • Panwalker, S.S. and Iskander, W., “A Survey of Scheduling Rules,”Operations Research, Vol. 25, No. 1, pp. 45–61 (1977).

    Google Scholar 

  • Potts, C.N. and Van Wassenhove, L.N., “A Decomposition Algorithm for the Single Machine Total Tardiness Problems,”Operations Research Letters, Vol. 1, No. 5, pp. 177–181 (1982).

    Google Scholar 

  • Rajagopalan, S. “Formulation and Heuristic Solutions for Parts Grouping and Tool Loading in Flexible Manufacturing Systems,”Proc. of the 2nd ORSA/TIMS Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), Elsevier Science Publishers B.V., Amsterdam, pp. 312–320 (1986).

    Google Scholar 

  • Russel, R.S., Dar-El, E.M., and Taylor, B.S. III, “A Comparative Analysis of the COVERT Job Sequencing Rule Using Various Shop Performance Measures,”International Journal of Production Research, Vol. 25, No. 10, pp. 1523–1540 (1987).

    Google Scholar 

  • Shanker, K. and Tzen, Y-J.J., “A Loading and Dispatching Problem in a Random Flexible Manufacturing System,”International Journal of Production Research, Vol. 23, No. 3, pp. 579–595 (1985).

    Google Scholar 

  • Shanthikumar, J.G. and Stecke, K.E., “Reducing Work-in-Process Inventory in Certain Classes of Flexible Manufacturing Systems,”European Journal of Operational Research, Vol. 26, No. 2, pp. 266–271 (1986).

    Google Scholar 

  • Stecke, K.E., “Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems,”Management Science, Vol. 29, No. 3, pp. 273–288 (1983).

    Google Scholar 

  • Stecke, K.E., “Design, Planning, Scheduling, and Control Problems of Flexible Manufacturing Systems,”Annals of Operations Research, Vol. 3, pp. 3–12 (1985).

    Google Scholar 

  • Stecke, K.E., “A Hierarchical Approach to Solving Machine Grouping and Loading Problems of Flexible Manufacturing Systems,”European Journal of Operational Research, Vol. 24, No. 3, pp. 369–378 (1986).

    Google Scholar 

  • Stecke, K.E. and Kim, I., “A Flexible Approach to Implementing the Short-Term FMS Planning Function,”Proc. of the 2nd ORSA/TIMS Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), Elsevier Science Publishers B.V., Amsterdam, pp. 283–295 (1986).

    Google Scholar 

  • Stecke, K.E. and Kim, I., “Performance Evaluation for Systems of Pooled Machines of Unequal Sizes: Unbalancing versus Balancing,”European Journal of Operational Research, Vol. 42, No. 1, pp. 22–38 (1989).

    Google Scholar 

  • Stecke, K.E. and Kim, I., “A Study of FMS Part Type Selection Approaches for Short-Term Production Planning,”International Journal of Flexible Manufacturing Systems, Vol. 1, No. 1, pp. 7–29 (1988).

    Google Scholar 

  • Stecke, K.E. and Morin, T.L., “The Optimality of Balancing Workloads in Certain Types of Flexible Manufacturing Systems,”European Journal of Operational Research, Vol. 20, pp. 68–82 (1985).

    Google Scholar 

  • Stecke, K.E. and Solberg, J.J., “Loading and Control Policies for a Flexible Manufacturing System,”International Journal of Production Research, Vol. 19, No. 5, pp. 481–490 (1981).

    Google Scholar 

  • Stecke, K.E. and Solberg, J.J., “The Optimality of Unbalancing Both Workloads and Machine Group Sizes in Closed Queueing Networks of Multi-Server Queues,”Operations Research, Vol. 33, No. 4, pp. 882–910 (1985).

    Google Scholar 

  • Stecke, K.E. and Talbot, F.B., “Heuristics for Loading Flexible Manufacturing Systems,” inFlexible Manufacturing: Recent Developments in FMS, Robotics, CAD/CAM, CIM, A. Raouf and S.I. Ahmad (Eds.), Elsevier Science Publishers B.V., Amsterdam, pp. 73–85 (1985).

    Google Scholar 

  • Vepsalainen, A.P.J. and Morton, T.E., “Priority Rules for Job Shops with Weighted Tardiness Costs,”Management Science, Vol. 33, No. 8, pp. 1035–1047 (1987).

    Google Scholar 

  • Whitney, C.K. and Gaul, T.S., “Sequential Decision Procedures for Batching and Balancing in Flexible Manufacturing Systems,”Proc. of the 1st ORSA/TIMS Special Interest Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, K.E. Stecke and R. Suri (Eds.), pp. 243–248 (1984).

  • Whitney, C.K. and Suri, R., “Decision Aids for FMS Part and Machine Selection,”Proc. of the 1st ORSA/TIMS Special Interest Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, I.E. Stecke and R. Suri (Eds.), pp. 205–210 (1984).

  • Zangwill, W.I.,Nonlinear Programming: A Unified Approach, Prentice-Hall, Englewood Cliffs, NJ (1969).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kim, YD., Yano, C.A. An iterative approach to system setup problems in flexible manufacturing systems. Int J Flex Manuf Syst 4, 183–209 (1992). https://doi.org/10.1007/BF01313699

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01313699

Key words

Navigation